Azizi Riviera Reve Dubai: Sources and Prices Guide (2026)

  • From $639,891
Meydan, Dubai, UAE
  • AZRI3071
  • Property ID
  • Apartment, Penthouse
  • Property Type
  • 3
  • Bedrooms
  • 38.5 - 303.7
  • sq. m.
For Sale
Azizi Riviera Reve Dubai: Sources and Prices Guide (2026)
Meydan, Dubai, UAE
  • From $639,891

Description

Azizi Riviera Reve Dubai is a three-tower apartment project called Riviera Rêve by its developer, Azizi Developments, in the Riviera community of Meydan, Mohammed Bin Rashid City, where the developer’s own project page showed the status Under Development and a starting price of AED 2.35 million on 13 November 2026.

Azizi Riviera Reve Dubai towers beside the Riviera lagoon, rendering

This guide to Azizi Riviera Reve Dubai reads the developer’s page as recorded in the project data file of that date, two Zawya reports, an Eye of Riyadh release, the Bayut and Property Finder project pages, and the official Dubai Land Department and UAE government pages that govern off-plan purchases.

The developer’s own page prints no handover date, no construction percentage and no unit count, so those figures come from other sources, and where they differ every figure is shown with its source and date and none is chosen.

It also covers the unit sizes and prices each source prints, the two payment plans in circulation, the Dubai rules on registration, escrow and fees, and a checklist of what a buyer can ask for in writing before reserving. Prices are in dirhams as printed, with dollar equivalents at the pegged rate of 3.6725 dirhams per US dollar.

Overview of Azizi Riviera Reve Dubai

The azizidevelopments.com project page presents Riviera Rêve as a residential apartment project in the Meydan – Riviera community of Mohammed Bin Rashid City (MBR City), on a 2.7 km lagoon-like beach edge. The status it prints is Under Development, the type line reads 1 and 3 bedrooms, and the starting price is printed as AED 2.35 million with the word From. These details are recorded in the data file as read on 13 November 2026.

Riviera Rêve tower balconies facing the lagoon and Downtown skyline, rendering

The page does not say which unit type carries the starting price. It prints no handover date, no payment plan and no construction percentage, and it links a brochure that was not opened for this guide. Its map pin sits at 25.17499 north, 55.31304 east, and it lists a gallery of renders and two undated site photographs.

Property Finder lists three buildings, and Bayut’s resale feed names Tower 1 and Tower 3. The towers are part of the fourth phase of Riviera according to the developer’s releases, with Riviera described there as 75 mid-rise and high-rise buildings with approximately 16,000 residences. The contractor named in those releases is Gardinia Contracting.

Item (Azizi Riviera Reve Dubai) What is printed Source and date
Project name Riviera Rêve Developer page, 13 Nov 2026 (data file)
Developer Azizi Developments Developer page
Community Meydan – Riviera, MBR City, Dubai Developer page; Bayut places it in Meydan One
Status Under Development; no construction percentage printed Developer page, 13 Nov 2026
Type line 1 and 3 bedrooms (apartments) Developer page
Starting price From AED 2.35 million (payload value AED 2,357,355); unit type not stated Developer page, 13 Nov 2026
Buildings 3 towers (Tower 1, 2, 3) Property Finder; Bayut listings
Units and floors Not stated in any source read Data file
Handover Not printed by the developer; see table in section 2 Differs by source
Tenure Freehold, 4 percent government fee Property Finder, 13 Nov 2026
Contractor Gardinia Contracting Azizi release on Zawya

The rest of this guide takes these items in turn. Anything described as calculated is arithmetic from a printed figure and is not a price or a promise from any party.

What each source prints about status, handover, price and payment

A buyer reading about Azizi Riviera Reve Dubai meets several versions of the same facts, each carrying a different date. The table below puts them side by side. It is a record of what is printed, not a ranking, and no row is treated as more correct than another.

Topic Developer page (13 Nov 2026) Azizi release via Zawya Bayut spotlight Property Finder
Status Under Development 79 percent complete; 100 percent of structural build Not given Under construction; 62.79 percent, update dated 4 December 2025
Handover None printed Expected Q4 2026 completion timeline Q4 2025 (December 2025) Delivery date October 2024; text says Q4 2024
Starting price From AED 2.35 million Not given Resale asking prices only Launch price 1.4 million AED
Payment plan None printed Not given 10/30/60 Two plans: 10/30/60 and 10/40/50
Buildings Not given Not given Tower 1 and Tower 3 named in listings 3 buildings
Sales start Launch date 25 Aug 2022 in the data file’s scope pass Not given Not given 1 July 2022; construction start 2 July 2022

The Zawya press release and the Zawya and TradeArabia report carry the same Azizi announcement. Neither page shows a publication date in the text read on 13 November 2026, so the 79 percent figure is recorded as undated. The Eye of Riyadh release is dated Sunday 28 September 2025 and reports 56 percent.

The Albawaba release of 31 March 2026 is recorded in the data file with a 74 percent figure; that page returned an access refusal to a plain request on 13 November 2026, so it is cited here as the data file records it and was not re-read.

On the same day the Property Finder project page showed the word Ready in its header block beside a timeline that reads construction progress 62.79 percent, latest update 4 December 2025, and expected completion 30 October 2024. These items sit on one page and are reproduced as printed. The launch dates also differ slightly between sources, 25 August 2022 in the developer scope pass and 1 July 2022 on Property Finder; both are recorded and neither is preferred.

Every handover year printed by a source is shown in the next table with its date, because a buyer will meet each of them in searches. The developer’s own page prints none, which is why the sales contract is the only place where a handover date binds anyone.

Handover wording Where it appears Date of the page
Q4 2026 (expected completion timeline) Azizi release on Zawya and TradeArabia Undated in the text read
Q4 2025 (December 2025) Bayut project spotlight Updated 23 Oct 2026 per the data file; read 13 Nov 2026
One resale listing: HO Q4 2026 Broker listing recorded in the data file Seen 13 Nov 2026
October 2024 and Q4 2024 Property Finder Page data December 2025; read 13 Nov 2026
June 2026 or Q2 2026 Broker search snippets, not opened Not dated
None Developer project page 13 Nov 2026

Construction progress by component, 56 percent to 79 percent

The most detailed public information about this project is the pair of progress releases from Azizi Developments. The first is dated 28 September 2025 and reports 56 percent completion overall. The second, undated in the text read, reports 79 percent. Both break the figure into components, which lets a reader see what had been done at each stage rather than only the headline.

Riviera Rêve living and dining area with lagoon view, rendering
Component Release of 28 Sep 2025 Later release (undated) Change in percentage points (calculated)
Overall completion 56% 79% +23
Structural build 94% 100% +6
Blockwork 74% 98% +24
Internal plastering 66% 92% +26
Tiling 30% 73% +43
HVAC systems 48% 89% +41
MEP systems 42% 71% +29
Facade works 18% 69% +51
External works 55% 63% +8
Overall finishes 32% 66% +34
Swimming pool works Not given 57% not comparable
Elevator works Not given 48% not comparable
Workers deployed 3,900 1,100 (Beach Front plots) not comparable

Two points explain why these figures should be read with care. First, the percentages are the developer’s own, issued in press releases; no independent inspection report is attached to either. The Dubai Land Department publishes a project status service through which a registered project’s inspection details can be viewed, and that is the place to ask for a figure that is not the developer’s.

Second, the worker counts refer to different scopes. The September 2025 release speaks of workers currently deployed, while the later release says 1,100 workers across the Beach Front plots. A change in scope of that kind means the two counts are not a measure of how the site changed, and no conclusion is drawn from them here.

Reading the table, structural work was already near done in September 2025 and facade and tiling were the components that moved most between the releases. The sequence of trades is ordinary for a tower: frame, blockwork and plastering, then mechanical and electrical systems, then facade, tiling and finishes. The later release also gives the pool and elevator works their first percentages, 57 and 48, which are the two items most visible to a future owner.

The change column is plain subtraction. It does not say how long the interval was, because the second release carries no date in the text read, and no monthly rate is calculated for that reason.

Unit types, sizes and prices by source

The developer’s type line for the project reads 1 and 3 bedrooms, while Property Finder lists studios, one-bedroom, two-bedroom and three-bedroom apartments and a penthouse category. The developer page does not print a size table. The sizes below are Property Finder’s, shown in square feet as printed with a square-metre value calculated at 0.092903 square metres per square foot.

Riviera Rêve bedroom with floor-to-ceiling glazing, rendering
Type Size, sq ft (as printed) Calculated m2 Source and note
Studio 414-573 38.5-53.2 Property Finder, 13 Nov 2026
1 bedroom 709-1,211 65.9-112.5 Property Finder, 13 Nov 2026; the data file’s December 2025 snapshot printed 709-1,131
2 bedroom 898-1,521 83.4-141.3 Property Finder, 13 Nov 2026; the December 2025 snapshot printed 1,211-1,521
3 bedroom 1,665-1,717 154.7-159.5 Property Finder; 1,691-1,717 in a 2024 snapshot; 1,700 on a broker page
Penthouse 3,127-3,269 290.5-303.7 Property Finder, per the data file

Some one-bedroom figures differ between pages. The data file records starting sizes of 709, 710, 793 and 795 square feet for the one-bedroom type on different pages, and Property Finder’s own two snapshots differ in the top of the one-bedroom range and the bottom of the two-bedroom range. These are different dates of the same site or different broker texts, and they are recorded, not repaired.

The only price the developer prints is the starting price. The AED 2.35 million figure converts to about USD 639,891 at the pegged rate of 3.6725 (2,350,000 divided by 3.6725), and the payload value of AED 2,357,355 gives about USD 641,894. Property Finder prints a launch price of 1.4 million AED, which is about USD 381,212 by the same arithmetic.

The two starting figures differ by about AED 950,000, and the pages do not say whether they refer to the same unit type or the same date.

Source Price as printed USD at 3.6725 (calculated) What it is
Developer page, 13 Nov 2026 From AED 2.35 million about 639,891 Starting price; unit type not stated
Developer page payload AED 2,357,355 about 641,894 Underlying value of the same field
Property Finder, Dec 2025 data Launch price 1.4 million AED about 381,212 Launch price; asterisk says prices may change

Bayut’s page also lists resale offers inside the project. On 13 November 2026 it showed ten listings, from AED 1,149,000 for a 497 sq ft studio in Tower 3 to AED 3,000,000 for a 1,209 sq ft two-bedroom in Tower 1 and an 833 sq ft one-bedroom in Tower 3. One-bedroom asking prices ran from AED 1,999,000 to AED 3,000,000 across sizes of 706 to 834 sq ft.

These are listing-site asking prices from sellers and agents; they are not Azizi prices and say nothing about what the developer sells now.

The data file also records Property Finder’s sold transactions as a range of roughly AED 1.36 million to 5.54 million, and a studio resale range of AED 1.1 million to 1.4 million. Wide ranges like these mix unit types, floors and dates, so no average is drawn from them. A buyer comparing offers should ask for the unit number, the floor, the view and the date of each figure.

Payment plans in circulation, and how to read them

The developer’s page for the project prints no payment plan. Two plans appear on portals, and a few broker snippets in the data file print others that were not opened. The table sets out each as printed. Applying a plan to a price is arithmetic, and the illustration column uses the developer’s AED 2.35 million starting figure only to show how the percentages work; it is not an offer for any unit.

Riviera Rêve large dining and living space, rendering
Plan Booking During construction On handover Source
Option 1 10% 30% 60% Property Finder; Bayut (booking at signing)
Option 2 10% at launch 40% in 4 instalments 50% Property Finder
Other snippets 40/60, 20/80 and 20/80 with booking at 20% not opened not opened Broker search snippets in the data file
Illustration on AED 2,350,000 (calculated) Option 1, AED Option 2, AED
Booking payment 235,000 235,000
During construction 705,000 940,000 (4 instalments of 235,000)
On handover 1,410,000 1,175,000
Total 2,350,000 2,350,000

A plan expressed as percentages becomes real only in the sale and purchase agreement, which lists each instalment by date or by construction stage. For an off-plan unit in a registered Dubai project, buyer payments go to the project’s escrow account, and the Dubai Land Department describes the escrow account as the account in which the amounts collected from purchasers of units sold off the plan are deposited.

Whether the instalments follow dates or construction milestones changes the buyer’s position. A date-based schedule runs regardless of progress, while a milestone-based schedule ties each payment to a stage certified in a technical report. The agreement states which applies, and the buyer can ask for the schedule in a table with dates, percentages, amounts and the stage that triggers each payment.

Government fees, service-charge deposits and any administration fee are normally separate from the instalments in the table. The section on Dubai rules below shows the fee amounts the Dubai Land Department prints. Whether they are included in a given plan is a point for the contract, not an assumption.

The Riviera community and the amenities each source lists

Azizi Riviera Reve Dubai sits inside Riviera, which Azizi’s releases describe as a French Mediterranean-inspired waterfront community of 75 mid-rise and high-rise buildings with approximately 16,000 residences. The Eye of Riyadh release names three districts: a retail boulevard, a lagoon walk on the shores of a 2.7 km swimmable crystal lagoon with eateries and boutiques, and a green social space called Les Jardins.

Riviera Rêve bathroom with freestanding bath, rendering

The same release gives the lagoon’s area as 130,026 square metres and says it holds more than 51.5 million gallons of desalinated water. These are developer figures from a press release; no independent measurement was found. Riviera is a master plan with several phases, so some of what the district descriptions mention is outside the three Rêve towers.

The amenity lists differ between the developer’s page and the press releases. The table keeps them apart so that a reader can see which statements are on the project page and which come from a release or a portal. Items that are marketing adjectives are left out, and only the named facilities are listed.

Facility Developer page (data file, 13 Nov 2026) Azizi release Bayut
Swimming pool Grand infinity pool Two swimming pools Grand infinity pool
Gym Advanced gymnasium Fully equipped gyms Fully equipped gymnasiums
Saunas and steam rooms Listed Listed Not listed
Children’s play Indoor and outdoor adventure playground Children’s play areas Kids play area
Yoga and garden Yoga zone; zen garden Not listed Yoga zone; zen garden
Barbecue BBQ seating area Not listed Not listed
Services Laundry facilities; car washing Valet and carwash services Covered parking
Retail and dining French Riviera-inspired boulevard with boutique shops and restaurants Retail boulevard, lagoon walk Boulevard and retail within Riviera
Lagoon Crystal lagoon 2.7 km crystal lagoon Crystal lagoon

The Eye of Riyadh release also lists finishes: cascading-water entrances, Calacatta Sponda marble flooring, big-slab porcelain walls, frameless floor-to-ceiling windows, panoramic lifts and smart-home systems. Bayut adds European-style cabinetry. These are the developer’s and the portal’s descriptions of what is intended. The finish schedule that binds a buyer is the one attached to the sales agreement, and a section below lists how to ask for it.

Of the images supplied with this listing, eight are renders and two are the developer’s own photographs of the towers under construction. The renders show the intended design and are not photographs of completed buildings.

Location of Azizi Riviera Reve Dubai: Meydan, MBR City and the distances

The project’s map pin on the developer’s page is 25.17499 north, 55.31304 east. The developer’s text places Azizi Riviera Reve Dubai in Meydan – Riviera, MBR City. Wikipedia describes Mohammed Bin Rashid City as a planned mixed-use development announced in November 2012 and says the land is bordered by Emirates Road, Al Khail Road and Sheikh Zayed Road.

Riviera Rêve pool terrace with skyline view, rendering

The developer’s page prints drive times to seven places, and Bayut names the roads that serve the area: Al Khail Road (E44), Sheikh Zayed Road (E11) and Business Bay, without distances. The developer’s descriptive text says that Jumeirah Beach and Downtown Dubai are within 15 minutes, while its list says Downtown Dubai is 10 minutes. The list is the more specific figure, and both are shown below as printed.

Place Developer page, drive time Straight line from the pin, km (calculated)
Al Khail Road 1 minute not calculated
Meydan Racecourse 2 minutes 2.2
Festival City and IKEA 10 minutes 6.6 (Festival City Mall)
Downtown Dubai 10 minutes (text says within 15) 4.6 (Burj Khalifa)
Sheikh Zayed Road 10 minutes not calculated
Dubai International Airport (DXB) 15 minutes 10.1
The Palm Jumeirah 22 minutes 19.0

The straight-line figures are haversine distances between the developer’s map pin and points taken from OpenStreetMap on 13 November 2026: Burj Khalifa, Meydan Racecourse, Festival City Mall, Dubai International Airport and Palm Jumeirah. They measure the air distance, not the road, and are not a travel time. Drive times depend on the hour and the route, and the developer does not say how its minutes were measured.

Readers who want to place the project should look at which side of Al Khail Road the plot lies on, how the Riviera internal roads connect, and which entrance the towers use. The developer’s page and the map pin show a community-level pin as well, at 25.16066 north, 55.30906 east for Meydan – Riviera, which differs from the project pin by a short distance. The registered plot number, found in the sale contract and the DLD project record, settles the exact position.

No source read prints a Metro station, a school or a hospital distance for this project, and none is invented here. A buyer who cares about a particular amenity can ask the seller for the route and check it on a map at the time of viewing.

Buying off-plan in Dubai: freehold, registration, escrow and fees

Several steps that apply to this project apply to every off-plan purchase in Dubai. The sources are official, and each statement below names its page. The rules can change, so the dated pages should be re-read before any contract is signed.

Riviera crystal lagoon beach beside residential blocks, rendering

Ownership. Law No. (7) of 2006 on the Dubai legislation portal says that the right to own real property in the emirate is restricted to UAE nationals, nationals of the Gulf Cooperation Council states, companies fully owned by them and public joint stock companies.

It adds that, with the Ruler’s approval, non-UAE nationals may in certain areas determined by the Ruler be granted freehold ownership without time restriction, or usufruct or leasehold up to 99 years. Property Finder labels the project freehold. The area designation and the title type for the specific unit are confirmed in the contract and the DLD record.

Project registration and escrow. The Dubai Land Department service page on registering a project states that the service lets development companies register a project and open an escrow account for off-plan sales.

Its terms list that the land must be in freehold or long-term lease areas, that an ownership deed must be available, and that a 30 percent guarantee is submitted in one of three forms: completion of 30 percent of construction, a bank guarantee for 30 percent, or a cash deposit for 30 percent. The registration fee printed is AED 150,000 plus AED 10 knowledge and AED 10 innovation fees.

The Dubai Land Department page on escrow account activation lists the conditions under which the developer may draw on the escrow account. They depend on a recent technical report from the Dubai Land Department, not older than three months, and on whether a bank guarantee, a developer contribution, financing or financial solvency applies.

The Dubai Land Department FAQ says that all amounts received from buyers of units sold off-plan are deposited in the project escrow account and that the escrow law applies to all developers selling off-plan in Dubai; it names Law No. 8 of 2007.

Registering the sale. The Dubai Land Department service page on registering the initial sale says the developer registers units sold off-plan in the provisional register through the Oqood portal, and that the contract is registered within 90 days from signing. It prints the fees as 2 percent of the sale value for the seller and 2 percent for the purchaser, plus AED 10 knowledge and AED 10 innovation fees.

The Dubai Land Department notice of 31 May 2021 says that the buyer submits the required fees, 4 percent of the property’s value, to the developer and that the developer should pay them within 60 days.

Step What the official page says Page
Freehold for non-UAE nationals Only in areas determined by the Ruler, with approval; freehold or usufruct/leasehold up to 99 years Law No. (7) of 2006, Art. 4
Project registration Escrow account opened; 30 percent guarantee; fee AED 150,000 DLD register-project service
Initial sale registration Contract in provisional register within 90 days; 2% seller, 2% purchaser, AED 10 + AED 10 DLD initial-sale service
Buyer’s fee 4% of the property’s value, paid to the developer for registration DLD notice, 31 May 2021
Escrow release Technical report not older than 3 months; four release cases DLD escrow activation page
Project check Search by project name or number in the project status service and Dubai REST DLD project status enquiry

The two descriptions of the fee, 2 percent each side on the service page and 4 percent paid by the buyer in the 2021 notice, are both quoted as printed. Which party bears which share is set by the contract, and property portals state the government fee as 4 percent. The next table shows what 4 percent comes to on three figures from this guide. These are calculations, not quotes.

Price base (AED) 4 percent (AED, calculated) USD at 3.6725 (calculated)
2,350,000 (developer starting price) 94,000 about 25,596
1,400,000 (Property Finder launch price) 56,000 about 15,248
1,149,000 (lowest resale asking price on Bayut) 45,960 about 12,515

Add the AED 20 in knowledge and innovation fees printed on the service page, and any administration or trustee fees the contract names. A mortgage adds its own registration charge and bank fees; see the guide on mortgages for foreigners linked in the sections below.

Service charges, taxes and the Golden Visa rule

Three recurring or conditional items matter after the purchase of a unit in the Rêve towers. They are set by authorities, not by this guide or by the developer’s marketing, and each is stated here as the source prints it.

Riviera Rêve three towers under construction, developer site photo

Service charges. The Dubai Land Department FAQ defines the service charge as the annual financial charge approved by the Real Estate Regulatory Agency and collected from owners of units to cover the management, operation, maintenance and repair of jointly owned property, subject to control and auditing. No source read for this project prints a service-charge figure, so none is given. The buyer asks for the estimate for the specific tower and unit, and for the name of the management company.

Taxes. The u.ae taxation page states that the UAE does not levy income tax on individuals and that it levies 5 percent value added tax on goods and services, excise tax on specified goods, and corporate tax on corporations. That summary does not list an annual property tax.

Whether a municipal housing fee applies through the utility bill is not covered by a source read for this guide and is left out. The guide on property tax in Dubai on this site discusses the point, and the mortgage guide for foreigners covers financing.

Residence. The u.ae Golden visa page lists investors in public investments or real estate as an eligible category, with a minimum capital of AED 2 million and, in the table printed there, 5 years for real estate investments and 10 years for public investments. The page also says the visa is renewable and sponsor-free. It does not say whether any particular unit, or an off-plan unit with unpaid instalments, qualifies.

Eligibility for a given purchase is not claimed here and is checked with the Federal Authority for Identity, Citizenship, Customs and Port Security or the General Directorate of Residency and Foreigners Affairs. The Golden Visa guide on this site covers the property route in more detail.

Item Rule as printed Source What to check for this unit
Service charge Annual charge approved by RERA, audited DLD FAQ Estimate and management company in writing
Individual income tax None levied on individuals u.ae taxation page Nothing unit-specific
VAT 5 percent on goods and services u.ae taxation page Whether VAT applies to any fee in the contract
Golden visa (real estate) Minimum capital AED 2 million; 5 years in the u.ae table u.ae Golden visa page Eligibility is decided by the authority, not by the seller

What to ask for in writing before reserving

Because the developer’s page for Azizi Riviera Reve Dubai prints no handover, payment plan or unit count, the written documents carry more weight than usual. A buyer can ask for the items below before signing or paying a reservation, and can ask them of the developer or its sales team.

Riviera Rêve three towers under construction, second developer site photo
  1. The sale and purchase agreement draft with the unit number, floor, tower, internal area in square feet and square metres, and the view or orientation stated.
  2. The handover date, written as a date in the contract, with the definition of handover and what the agreement says if the date moves.
  3. The payment schedule as a table, stating whether each instalment follows a date or a construction stage, and the AED amount of each.
  4. The name of the escrow account and its bank, and the account details to which payments are made.
  5. The Dubai Land Department project number and the project’s registration certificate, which can be checked in the project status service.
  6. The Oqood registration of the sale and the date by which it will be completed, plus the receipt for the fees paid.
  7. The service-charge estimate for the tower, the management company’s name and the first-year billing basis.
  8. The finish and fittings schedule, including flooring, kitchen cabinets, appliances, smart-home items and air-conditioning, so that renders are not the only description.
  9. The legal name of the selling entity and the person who signs for it, with proof of authority.
  10. Which party pays the registration fee, the admin fees and the trustee fees, and when.
  11. Whether the unit is freehold and the area designation on which that rests.
  12. For a resale unit, the seller’s title or Oqood record, any mortgage, and the developer’s no-objection certificate for transfer.

A list like this does not replace a lawyer who reads Arabic and English. It records what a careful buyer asks, and the answers are written down with their dates so that they can be compared later with the construction status the project status service shows.

If the seller is a person who bought earlier, the same list applies with two additions: the original sale agreement and the receipts for every instalment paid to the developer. The Dubai Land Department’s registers, not the portal listing, show who owns the contract right.

Other Azizi projects and nearby Dubai listings

Azizi Riviera Reve Dubai is one of the Azizi Developments projects on this site. The Riviera master plan has several buildings and phases, so projects in the same community are listed first. No project is described as better than another, and the table shows what each page prints.

Listing Area Page
Azizi Riviera Meydan – Riviera (MBR City) Azizi Riviera Dubai
Azizi Riviera Beachfront Meydan – Riviera (MBR City) Azizi Riviera Beachfront Dubai
Azizi Milan Heights Azizi Milan, City of Arabia, Dubailand Azizi Milan Heights Dubai
Azizi Venice Dubai South Azizi Venice Dubai
Kensington Waters by Ellington MBR City Kensington Waters by Ellington
Berkeley Place by Ellington MBR City Berkeley Place by Ellington
The Highbury by Ellington MBR City The Highbury by Ellington
Wilton Park Residences by Ellington Sobha Hartland, MBR City Wilton Park Residences by Ellington

Further reading on this site includes the off-plan buyers guide, the page on whether foreigners can buy apartments in Dubai, the comparison of freehold and leasehold in Dubai, the Dubai market guide and the directory of Dubai developers. Figures in older guides may be out of date, and the official pages named in this guide are the reference. Related pages: Dubai and the United Arab Emirates archive.

Azizi Developments (developer)

The legacy page of Azizi Developments says the company was established in 2007 and is headquartered in Dubai. Its press material names Mirwais Azizi as Founder and Chairman of Azizi Group and Farhad Azizi as Group CEO. This is as attributed to the developer; no share-ownership breakdown was found. The azizidevelopments.com pages sit behind a bot checkpoint for plain requests, so the company facts in this section are cited as recorded in the company data file of 13 November 2026.

According to Azizi press releases of September 2026, the developer has delivered more than 45,000 homes, and it reports more than 150,000 units under construction at various stages. The legacy page gives a similar figure of 45,000 homes. In its timeline it records an agreement with Nakheel in 2009 for the Al Furjan community, the launch of Azizi Riviera in 2017, and further communities including Azizi Venice, Azizi Milan and Dubai Islands among those named.

The developer also describes in-house manufacturing of facade, steel, HVAC ducting and marble components, and names Gardinia as its construction partner. The Azizi release that gives the 79 percent progress figure names Gardinia Contracting as the contractor on the Beach Front plots. These descriptions are the company’s, from its own pages and releases of 2026, and nothing here is an independent assessment.

Frequently asked questions

Where is Azizi Riviera Reve Dubai?

The developer places Riviera Rêve in Meydan – Riviera, part of Mohammed Bin Rashid City, and its map pin is at 25.17499 north, 55.31304 east. Bayut files it under Meydan One. The developer’s page prints drive times, such as 2 minutes to Meydan Racecourse and 10 minutes to Downtown Dubai, and does not print a street address. The plot number in the contract fixes the exact position.

Who builds Riviera Rêve?

The developer is Azizi Developments. Azizi’s releases name Gardinia Contracting as the contractor, with 1,100 workers on the Beach Front plots in the later release. The pages read do not name the architect or the interior designer, so none is given. The selling entity named in the contract is the one to confirm in writing.

What is the handover date of Azizi Riviera Reve Dubai?

The developer’s page prints none. An Azizi release carried by Zawya speaks of an expected Q4 2026 completion timeline. Bayut prints Q4 2025 and Property Finder prints October 2024 and Q4 2024. These are dated differences between pages. The sale contract is where a handover date is stated for a buyer, and the project status service shows the registered project.

How much do the apartments cost?

The developer’s page prints a starting price of AED 2.35 million, about USD 639,891 at 3.6725, without naming the unit type. Property Finder prints a launch price of 1.4 million AED. Bayut’s resale asking prices on 13 November 2026 ran from AED 1,149,000 to AED 3,000,000. These are different kinds of figure, and a written price list with unit numbers settles what applies.

Is Azizi Riviera Reve Dubai still on sale or sold out?

The developer’s page showed a starting price on 13 November 2026, and Bayut lists resale units. Neither statement shows how many units the developer still holds, and the pages read print no unit count and no sold-out wording. The developer’s current availability is confirmed in writing for a named unit.

Which payment plan applies?

The developer’s page prints none. Property Finder shows two plans, 10 percent at launch, 30 percent during construction and 60 percent on handover, or 10, 40 and 50, with four instalments in the second. Other broker snippets print different splits. The agreement for the unit states the plan, and each instalment is paid into the project’s escrow account.

What fees apply when buying off-plan in Dubai?

The Dubai Land Department prints 2 percent for the seller and 2 percent for the purchaser on the initial-sale service page, plus AED 10 knowledge and AED 10 innovation fees, and a 2021 notice speaks of the buyer submitting 4 percent of the property’s value. Portals state the government fee as 4 percent. The contract says who pays which share.

Can a foreigner buy a unit here?

Law No. (7) of 2006 allows non-UAE nationals freehold ownership in areas determined by the Ruler, with approval. Property Finder labels the project freehold. The area designation and title type for a unit are confirmed in the contract and the Dubai Land Department record, which is more reliable than a portal label.

Does buying here qualify for the Golden Visa?

The u.ae page lists real estate investors with a minimum capital of AED 2 million. It does not say whether a given off-plan unit qualifies, and this guide makes no claim. The Federal Authority for Identity, Citizenship, Customs and Port Security and the residency authority decide eligibility. The guide on this site on the Golden Visa explains the property route.

How current is this guide to Azizi Riviera Reve Dubai?

The data was read on 13 November 2026. The developer’s page was recorded in the project data file of that date and was not reopened for this text. The Zawya, Eye of Riyadh, Bayut, Property Finder and Dubai Land Department pages were read on that date. The Albawaba release is cited from the data file. Prices and availability change, and the dates are shown with each figure.

Sources and last check

Last checked: 13 November 2026. Sources:

Straight-line distances, dollar conversions, payment illustrations, fee calculations and square-metre values are calculated from the figures named in the text and are not published prices. This is not legal, tax or financial advice.

  • City Dubai
  • Country UAE

Features

  • Barbeque
  • Gym
  • Sauna
  • Swimming Pool

Contact Information

Zhamal Abdykozhoeva
  • Zhamal Abdykozhoeva

Enquire About This Property

Property Inquiry

"*" indicates required fields

Name*
Please let us know what's on your mind. Have a question for us? Ask away.

Compare listings

Compare
Zhamal Abdykozhoeva
  • Zhamal Abdykozhoeva
Oman flag
HEADQUARTERS MUSCAT