DAMAC Sun City Dubai is an off-plan community of four and five bedroom townhouses in Dubailand, launched by the developer DAMAC Properties, whose own project page shows no price and marks inventory as not available.

This profile sets the developer’s page beside Property Finder as both stood on 13 November 2026, then explains how an off-plan purchase is recorded in Dubai and which documents to request in writing. Related pages are the UAE country page and the Dubai developer directory.
DAMAC Sun City Dubai is a townhouse community in Dubailand that the developer describes as a wellness-inspired scheme of four and five bedroom townhouses with balconies and terraces. This profile of DAMAC Sun City Dubai reads the developer’s project page and the Property Finder project page as they stood on 13 November 2026 and places their figures side by side.

The developer’s page is short on numbers. It prints a community size, a unit figure for the whole community, a list of eight amenities and a set of answers about the neighbourhood. It does not print a price, a handover tile, a payment plan, unit sizes or a tenure statement in the text of the page. Property Finder prints sizes, a launch price, a payment plan, a completion date and a construction percentage. Because the two sources cover different items, the table below states each figure with its source and does not choose between them.
| DAMAC Sun City Dubai: item | As published (13 November 2026) |
|---|---|
| Developer | DAMAC Properties (damacproperties.com) |
| Community and area | DAMAC Sun City community, Dubailand, Dubai, per the developer; Property Finder gives the location as Dubai, DAMAC Sun City. No coordinates or plot numbers are printed |
| Unit types | 4 and 5 bedroom townhouses, per the developer’s FAQ; Property Finder lists a 4 bedroom Type A and a 5 bedroom Type A |
| Community figures | Master community 2.7 million sq ft; 770 units described as villas and townhouses, per the developer. The figure is for the community and is not split by type |
| Sizes | 4 bedroom 2,319 sq ft and 5 bedroom 3,323 sq ft, per Property Finder; the developer’s page prints no unit sizes |
| Status | Off-plan, per the developer; Property Finder shows a "Sold out" tag dated 8 December 2025 |
| Tenure | Freehold, per Property Finder; not printed in the text of the developer’s page |
| Project name check | A Property Finder FAQ answer names the project "Serenia at Damac Sun City"; the developer’s page and the rest of the Property Finder page use DAMAC Sun City |
The unit figure needs a note. The developer’s 770 is labelled as villas and townhouses for the community, while the two types named in the FAQ and on Property Finder are townhouses only. Property Finder does not print a unit total; its page shows one building in the key information and zero buildings in the community summary. Other figures for the number of units appear in search snippets that were not opened, so they are not used here. The number of townhouses in this project, as distinct from the community, is a figure to request in writing.
Eight amenities are named by the developer: a grand water fountain, a library and co-working space, a wild garden amphitheatre, forest hiking trails with a suspended bridge, a sunrise gym, a monkey bar arena, outdoor sauna cabins and an outdoor camping area. Property Finder lists a longer set that includes outdoor yoga, an ice bath station, a crystal healing room, tennis courts and an organic area. Only the developer’s eight are treated as the project’s published list; the rest is a listing-site description. The images supplied for this page are developer renders, not photographs of finished buildings.
Status, handover and price are the items on which the two sources differ most. The tables below keep each figure with its source and date. Nothing is converted into a single answer, because the contract with the seller, not a website, sets the date and the price.
| Item | Developer page (13 November 2026) | Property Finder (13 November 2026) |
|---|---|---|
| Status | Off-plan; launch date 12 September 2024 in the page data; inventory flag shows not available | Sold out, tag dated 8 December 2025; sale starts 1 December 2024; construction started 2 December 2024 |
| Construction progress | Not printed | 7.08 percent, latest update 27 January 2026 |
| Handover | Page data carries 31 March 2028; no handover tile in the visible text | "Delivery Date: Q1 2028" and March 2028 in the key information; expected completion 30 March 2028; 1 March 2028 in the description text |
| Price | "Available on request"; the page data carries a minimum price of zero, which is not a price | Launch price 2.7M AED in the header; starting price 2,671,000 AED in the description |
| Payment plan | Not printed | Two options, see the next table |
| Resale | Not mentioned | 67 resale properties shown for the project |
The handover date appears in several forms. The developer’s page data holds a date of 31 March 2028, and Property Finder prints Q1 2028, March 2028, 30 March 2028 and 1 March 2028 in different places on one page. These are dated differences in how a quarter or a month is written, not separate promises. A buyer asks for the handover date to be written into the sale and purchase agreement, with the wording that applies if the date moves.
On availability, the two sources describe the same project in different words. The developer’s page shows "Available on request" and marks inventory as not available. Property Finder shows "Sold out" with a date and says that developer stock is out of stock for both unit types, while listing 67 resale properties. Neither statement is repeated here as a fact about any particular townhouse. Whether a unit can be bought from the developer, or only from an owner who already holds a contract, is something to confirm for the exact unit in writing.
The next table gives the two unit types as Property Finder prints them. Dirham figures are as printed and the dollar figures are arithmetic at the pegged rate of 3.6725 dirhams per US dollar, rounded to the nearest dollar. They are listing-site launch figures from 13 November 2026 and are not quotations from the developer. Square metre sizes are converted from square feet at 0.092903 and rounded to the nearest whole number.
| Townhouse type (Property Finder) | Size as printed | Size in m2 (calculated) | From, AED as printed | About USD, at 3.6725 | Stock shown |
|---|---|---|---|---|---|
| 4 bedroom, Type A | 2,319 sq ft | about 215 | 2,671,000 (shown as 2.7M) | about USD 727,297 | Out of stock |
| 5 bedroom, Type A | 3,323 sq ft | about 309 | 3M AED (shown as 3M) | about USD 816,882 | Out of stock |
The 5 bedroom entry is printed as a rounded "3M AED", so its dollar figure is an arithmetic result for the rounded number and not a price to rely on. The page also lists seven bathrooms against the 5 bedroom type and four against the 4 bedroom type; the developer does not print bathroom counts, so those figures are left out of the facts for this listing. No per-square-foot or per-square-metre price is stated by either source, and none is calculated here.
| Payment plan (Property Finder) | Option 1 | Option 2 |
|---|---|---|
| At sales launch | 20 percent | 20 percent |
| During construction | 55 percent | 55 percent, in 11 instalments |
| On handover | 25 percent | 25 percent |
Some broker advertisements describe monthly instalments of one percent. Those are separate promotions by the advertisers, not part of the developer’s page, and they are not used here. The developer prints no plan, so the schedule that applies is the one attached to the contract, with a date or a construction stage against each instalment.
The developer places DAMAC Sun City Dubai in Dubailand and describes a master community of 2.7 million square feet. It prints no coordinates, so the exact position of the community relative to its neighbours is not stated in the sources read. What the page does print is a set of drive times in its FAQ, which are the main sourced facts about access. The page does not say whether they are measured at peak hours or from which point in the community.

| Place | Type | Time printed by the developer |
|---|---|---|
| The Village Community Mall | Closest mall named | 10 minutes |
| The Ranches Souk | Shopping and dining, named without a time | not printed |
| Studio One Hotel | Hotel | 16 minutes |
| South View School Dubai | School | 18 minutes |
| Radisson Hotel Dubai DAMAC Hills | Hotel | 21 minutes |
| Park Inn by Radisson Motor City | Hotel | 21 minutes |
| Health Connect Clinic | Healthcare | 23 minutes |
| GEMS Winchester School Dubai | School | 24 minutes |
| Dubai London Clinic, The Villa branch | Healthcare | 24 minutes |
| HealthHub Clinic, Silicon Oasis | Healthcare | 25 minutes |
| DAMAC Hills 2 Hotel (Edge by Rotana) | Hotel | 28 minutes |
| Al Maktoum International Airport | Airport | 23 minutes by car |
| Dubai International Airport | Airport | 28 minutes |
Property Finder gives a second set of travel times in its description: 15 minutes from Sports City, Motor City and DAMAC Hills, 20 minutes from Dubai Investment Park, 23 minutes from Al Maktoum International Airport and 28 minutes from Dubai International Airport. The two airport figures match the developer’s. The page also names Town Square Park, Mudon Central Park, DAMAC Hills Park, Global Village, Dubai Miracle Garden and IMG Worlds of Adventure as places near the community, without distances.
Two points follow from these figures. The developer’s own tile titled "Connected to Dubai" carries 5, 10 and 20 minute labels, but the text read does not say which places they refer to, so they are not used. And since every printed time is a drive time of ten minutes or more, a household would normally plan for a car for schools, clinics and the airport. That is a reading of the printed figures, not a statement by the developer. Whether a school, clinic or mall inside the community is planned is not stated.
Dubailand is a large area of Dubai that contains several master communities. The listing profiles for nearby DAMAC communities are in the table in section 8, and the Dubai-wide background is in the Dubai real estate market guide. A buyer who wants a drive time to a particular school or workplace can measure it at the hour the journey would be made.
The steps below describe how an off-plan purchase is normally recorded in Dubai, taken from official pages read on 13 November 2026. They are general rules, not statements about a particular contract for a Sun City townhouse. General background is in the guides to off-plan property in Dubai and to whether foreigners can buy property in Dubai.

| Step or rule | What the official source says | Source |
|---|---|---|
| Registering an off-plan sale | The Dubai Land Department service "Request to register the initial sale" covers units sold off-plan; the sale and purchase contract is to be registered in the provisional register within 90 days of signing, through the Oqood portal | DLD service page |
| Fees on that service | Seller 2 percent of the sale value; purchaser 2 percent of the sale value; AED 10 knowledge fee; AED 10 innovation fee. The contract sets who pays what | Same DLD service page |
| Escrow account | The real estate escrow account is a bank account of the project into which amounts collected from purchasers of off-plan units, or from the project’s financiers, are deposited | DLD FAQ |
| Escrow law | Law No. 8 of 2007 concerning escrow accounts for real estate development in Dubai | Dubai Legislation Portal |
| Oversight | RERA, the regulatory arm of DLD, monitors the progress of construction works in projects periodically; the FAQ points buyers to the DLD page for tracking the status of projects | DLD FAQ |
| Foreign ownership | The DLD FAQ lists foreign ownership in freehold areas as one category of ownership in Dubai; whether a given plot is in such an area is checked with DLD | DLD FAQ |
| Service charges | The Mollak system regulates service charges in jointly owned property and issues quarterly invoices through the system | Mollak, DLD |
| Golden Visa, property route | DLD’s investor service describes a 10-year renewable permit for an owner of property worth at least AED 2 million at the time of purchase; the UAE government portal lists real estate investors with a 5-year period and a minimum of AED 2 million. The two pages differ on the period | DLD Golden Visa service; UAE government portal |
Two points follow from the table. First, the escrow account is the project’s account, so a buyer asks for its name and bank and checks that instalments are paid into it. Second, the registration of the contract in the provisional register is a step with a time limit and fees, so a buyer asks who files it and when the certificate is issued. For a project described as sold out, the same questions apply to a resale: the buyer asks for the seller’s contract, the registration certificate and the record of instalments already paid.
Property Finder calls the project freehold and lists a 4 percent government fee. The developer’s page prints neither in its text. The DLD service page shows two percent for each side of an initial sale, which is a different way of describing fees, and the contract states who pays which. Freehold and leasehold are explained in freehold and leasehold in Dubai, and the tenure for a unit should be written in the sale agreement and checked against the title record.
Residence by property is a rule, not a feature of a townhouse. The Golden Visa route is tied to property value at the time of purchase, as the DLD page says, and the authority decides on each application. No eligibility is claimed here for any unit in the project, and the price indications in section 2 are not a basis for one; the rule is set out in the Golden Visa guide. Financing is covered in mortgages in Dubai for foreigners and ownership costs in property tax in Dubai.
DAMAC Properties is a Dubai developer. A 2024 press release says that since its founding in 2002 it has launched more than 75 towers, while one reference work dates the wider group to 1982; both dates are reported and neither is chosen here (per the data file, checked 13 November 2026). The release names Hussain Sajwani as founder and chairman.

In a press release of 4 September 2026 the company says it has handed over more than 50,000 homes and has more than 55,000 units in planning and development. It adds that it is targeting more than 8,800 units for delivery in 2026 across DAMAC Lagoons, DAMAC Hills, DAMAC Hills 2, Chic Tower and Elegance Tower. These are the company’s own figures and have not been audited here.
The company lists DAMAC Sun City, DAMAC Hills, DAMAC Hills 2, DAMAC Lagoons, DAMAC Riverside and DAMAC Islands among its master communities. Further profiles are in the directory of Dubai developers.
Before paying a reservation for a townhouse in the project, or for a resale unit in it, a buyer can ask for the items below. The list follows the normal documents of a Dubai off-plan purchase and is based on the gaps shown in sections 1 to 3.

Where a figure in the contract differs from one printed on a website, the contract is the document that governs the purchase. Keeping the dated website prints, such as the developer’s page of 13 November 2026, helps when comparing them later.
A community of four and five bedroom townhouses in Dubailand by DAMAC Properties, per the developer’s page of 13 November 2026. The page prints a master community of 2.7 million sq ft and 770 villas and townhouses for the community.




The developer’s page data carries 31 March 2028. Property Finder prints Q1 2028, March 2028 and 30 March 2028. The date in the contract is the one that matters.
The developer prints no price and shows "Available on request". Property Finder shows a launch price of AED 2,671,000 for the 4 bedroom type, about USD 727,297 at 3.6725, and a rounded AED 3 million for the 5 bedroom type. These are listing-site figures from that date, not quotations.
The sources differ. The developer’s page marks inventory as not available and shows price on request; Property Finder tags the project "Sold out" with the date 8 December 2025 and lists 67 resale properties. Availability of a given unit has to be confirmed in writing.
Property Finder says freehold. The developer’s page does not print tenure in its text, so the sale agreement and the title record should state it.
The developer prints none. Property Finder prints 20 percent at launch, 55 percent during construction and 25 percent on handover, with Option 2 spreading the construction payments over 11 instalments.
The table lists other DAMAC profiles in Dubailand and existing listings in nearby parts of Dubai. It makes no ranking, and each profile gives its own sources and dates.
| Project | Where | Link |
|---|---|---|
| DAMAC Islands 2 | Dubailand | DAMAC Islands 2 Dubai |
| DAMAC District | Dubailand | DAMAC District Dubai |
| DAMAC Violet 4 | DAMAC Hills 2 | DAMAC Violet 4 Dubai |
| DAMAC ELO 3 | Dubailand | DAMAC ELO 3 Dubai |
| DAMAC Golf Gate 2 | DAMAC Hills | DAMAC Golf Gate 2 Dubai |
| Celestia | Dubai South (existing listing) | Celestia Dubai South |
| Wavez by Danube | Liwan, Dubailand (existing listing) | Wavez by Danube |
| Sportz by Danube | Sports City (existing listing) | Sportz by Danube |
Wider context is on the Dubai city page.
Last checked: 13 November 2026. Sources:
This is not legal, tax or financial advice.
