Safa One de GRISOGONO Dubai is an off-plan project of two towers on Sheikh Zayed Road at the edge of Safa Park, which DAMAC Properties presents as branded by de GRISOGONO, with a handover quarter of Q4 2026 printed on its page.

This profile of Safa One de GRISOGONO Dubai reads the developer’s page and outside sources as they stood on 13 November 2026. The developer page shows no stock and no price (the button reads “Available on request”), so the figures below come mostly from portals and one press release, each with its source and date. The guide sets out what each source prints, the district and access facts, the Dubai rules for an off-plan purchase, and a list of what to ask for in writing.
On its project page, DAMAC describes two towers designed by Killa Design, with one-, two- and three-bedroom apartments, two-, three- and four-bedroom duplexes and five-bedroom penthouses, set beside Safa Park. The page prints “Branded by de GRISOGONO”, a payment plan of 10/90 and a project handover of Q4, 2026. Its amenity tiles list a gym and spa, an infinity beach, a tropical rainforest, a clubhouse, a signature restaurant and a splash pool. The page was read on 13 November 2026.

The developer shows the page as off-plan with its inventory flag switched off. Its data contains no price and no unit count, and the page gives no floor count or unit sizes. Everything on those points below comes from other sources and is labelled that way.
| Safa One de GRISOGONO Dubai: key facts | As published (13 November 2026) |
|---|---|
| Developer | DAMAC Properties (damacproperties.com) |
| Brand partner | de GRISOGONO, as the developer prints it |
| Architect | Killa Design (developer text) |
| Location | Sheikh Zayed Road, at the edge of Safa Park (developer FAQ); Al Wasl (Property Finder, Sotheby’s International Realty) |
| Status | Off-plan (developer page data) |
| Handover | Q4, 2026 (developer page) |
| Unit types | Apartments of 1 to 3 bedrooms, duplexes of 2 to 4 bedrooms, 5-bedroom penthouses (developer FAQ) |
| Price | No figure printed; the page shows “Available on request” |
| Payment plan | 10/90 (developer page); 20/40/40 (Property Finder) |
| Tenure | Freehold per Property Finder; the developer page does not state it |
The second table keeps the sources apart. It does not choose between them, and a cell reading “not printed” means only that the source read does not say it.
| What each source prints | Developer (damacproperties.com, 13 Nov 2026) | Others (source, date) |
|---|---|---|
| Buildings | Two towers (description and FAQ) | Three buildings in the key information, with tabs for Tower A, Tower B and Other (Property Finder, 13 Nov 2026); one branded tower (DAMAC press release on Zawya, page dated 29 Nov 2023) |
| Floors | Not printed | Unit levels 06 to 38 in Tower A (Property Finder, 13 Nov 2026) |
| Units in total | Not printed | Not printed by any source read |
| Area label | Sheikh Zayed Road | Al Wasl (Property Finder and Sotheby’s, 13 Nov 2026) |
| Handover | Q4, 2026 | Q4 2026, December 2026, expected completion 31 December 2026 (Property Finder); final completion planned Q4 2026 (Zawya release) |
| Payment plan | 10/90, no breakdown | 20 % at sales launch, 40 % during construction, 40 % on handover (Property Finder) |
| Tenure and fee | Not printed | Freehold, government fee 4 % (Property Finder) |
The press release on Zawya gives a phase timeline: excavation and piling complete in Q2 2023, substructure works from Q3 2023, superstructure expected to start in Q1 2024 and top out by Q4 2025, and fit-out by Q4 2026. Property Finder prints a different kind of milestone, with construction recorded as started on 23 April 2024. The two use different markers, so they are shown side by side and neither is adjusted.
The developer text describes the interiors and amenities in marketing language that is not repeated here. What can be checked is the list of facilities. The developer lists a gym and spa, a clubhouse, a restaurant and a splash pool, and Property Finder lists gymnasium, private and beach pools, sports facilities, covered parking, a children’s play area, cafes and restaurants, 24-hour security and concierge services. Which of these are shared between the towers, and which belong to residents only, is not stated by either source.
The images on the developer page are computer-generated renders of the towers, the podium, interiors and amenities. They show the design intent and are not photographs of a finished building.
The developer, Property Finder and Sotheby’s International Realty all describe the project as off-plan. The developer page nonetheless shows no stock and no price, which leaves a buyer with two routes to ask about: whatever the developer confirms in writing, or a resale from an existing owner. Property Finder shows one resale listing for the project on 13 November 2026.
| Source | Status as printed | Date |
|---|---|---|
| DAMAC project page | Off-plan; inventory flag off; button “Available on request”; launch date 22 March 2022 in the page data | 13 Nov 2026 |
| DAMAC FAQ | “An off-plan project featuring two designer branded” towers | 13 Nov 2026 |
| Property Finder | Off-plan; “Construction Started April 23, 2024”; expected completion 31 December 2026; one resale listing | 13 Nov 2026 |
| Sotheby’s International Realty | “Currently off-plan” | 13 Nov 2026 |
| Zawya (DAMAC press release) | Construction progress and phase timeline, final completion planned Q4 2026 | Page dated 29 Nov 2023 |
The handover quarter printed by the developer, Q4 2026, is the quarter in progress on the date of checking. None of the pages read carries a more recent handover notice, so the date to rely on is the one written into the sale contract for the unit.
The developer prints no price. The numbers below are portal figures. USD is arithmetic at the pegged rate of 3.6725 per USD, rounded to the nearest dollar.
| Price figure as printed | AED | About USD (at the pegged rate of 3.6725) | Source and date |
|---|---|---|---|
| Launch price label (“4.5M AED”) | 4,500,000 | 1,225,323 | Property Finder, 13 Nov 2026 |
| Starting price in the FAQ text | 4,453,000 | 1,212,526 | Property Finder, 13 Nov 2026 |
| 2-bedroom, Tower A Type C, 1,756 sq ft, “from” | 4,500,000 | 1,225,323 | Property Finder, 13 Nov 2026 |
| 3-bedroom, Tower A Type A, 4,581 sq ft, “from” | 9,800,000 | 2,668,482 | Property Finder, 13 Nov 2026 |
| 3-bedroom duplex, 4,181 sq ft, “from” | 17,000,000 | 4,628,999 | Property Finder, 13 Nov 2026 |
| 1-bedroom, 844 sq ft, “Price from” | 1,600,000 | 435,671 | Sotheby’s International Realty, 13 Nov 2026 |
These are listing-site figures, not DAMAC prices. Property Finder adds that prices, availability and purchase conditions may change frequently and should be confirmed with a representative. The two portals describe different unit types, and neither says which unit the lowest figure belongs to, so they cannot be merged into one starting price. This guide therefore gives none, and it prints no price per square foot because no source states one.
On payment, the developer prints 10/90 without explaining it, and Property Finder prints 20 % at sales launch, 40 % during construction and 40 % on handover. Both are shown as printed. The plan that applies to a unit is the schedule attached to the contract for that unit, and for a resale it is whatever the owner and buyer agree.
According to the developer’s FAQ, Safa One de GRISOGONO Dubai stands on Sheikh Zayed Road at the edge of Safa Park. It adds that Jumeirah Beach, City Walk and Box Park are minutes away, and that on the other side of the road lie Business Bay, the Burj area and the Dubai International Financial Centre.

Property Finder files the project under Al Wasl, and Sotheby’s International Realty places it at the southern edge of Safa Park in Al Wasl. The two labels describe the same stretch of road in different ways, so a search for either name may return the project.
The developer’s FAQ lists travel times to named places. The pages print them as minutes and, except for the airports, do not say whether they refer to driving or walking, or at what time of day.
| Place | Kind | Time as printed | Mode |
|---|---|---|---|
| City Walk | Shopping and dining district | 5 minutes | Not stated |
| Box Park | Shopping and dining district | 5 minutes | Not stated |
| The Dubai Mall | Mall | 7 minutes | Not stated |
| Oasis Mall | Mall | 10 minutes | Not stated |
| Medcare Hospital Al Safa | Hospital | 5 minutes | Not stated |
| Mediclinic Dubai Mall | Clinic | 7 minutes | Not stated |
| Al Ittihad School | School | 5 minutes | Not stated |
| Safa British School | School | 10 minutes | Not stated |
| Dubai International Airport | Airport | 14 minutes | Drive |
| Al Maktoum International Airport | Airport | 35 minutes, “when fully operational” | Drive |
All of these are the developer’s statements from 13 November 2026, and none is given in kilometres. The same FAQ also names hotels, further malls and further schools with times of up to 25 minutes, which are left to the page. A buyer who needs a commute time should test the route at the hours that matter instead of relying on a printed figure.
The developer draws on Safa Park for its description of the setting. The sources read do not state the park’s size or opening rules, and no source read gives the distance from the towers to a metro station, so none is given here. For the wider city, the guide to the Dubai real estate market and the Dubai city page give context.
The project is off-plan on every page read, so the buying rules below are the ones that apply to a purchase before completion. A purchase from an existing owner follows the same registration rules, with the owner as the seller. Each rule is stated as the authority prints it, checked on 13 November 2026.

| Topic | What the source says | Source |
|---|---|---|
| Freehold areas | Property for non-UAE citizens may be registered in the areas specified by the Ruler of Dubai, under Law No. 7 of 2006 on real estate registration. Property Finder lists this project as freehold | Dubai Land Department FAQ; Property Finder |
| DLD registration fee | DLD’s notice of 31 May 2021 gives the fee as 4 % of the property’s value, payable under the agreement between seller and buyer, with the developer carrying out the registration | Dubai Land Department notice |
| Oqood | DLD’s Register Project service has the developer submit the project request in the “Oqood” portal and open an escrow account for off-plan sales | Dubai Land Department, Register Project |
| Escrow | Law No. 8 of 2007 governs escrow accounts for real estate development; under Article 14 the escrow agent retains 5 % of the account’s value after the completion certificate, released one year after units are registered in the purchasers’ names | Dubai Legislation Portal |
| Golden Visa | u.ae lists real estate investors with a minimum capital of AED 2 million and property ownership; the authority decides each case | u.ae |
The first thing to check is the registration of the project itself. The Register Project service shows that a developer opens an escrow account when it registers an off-plan project, so a buyer can ask for the account name and the DLD project number in writing and compare them with the payment instructions.
The rule on payments is a contract point as well as a legal one: ask how each instalment is tied to a construction stage and to which account it is paid, and keep the receipt in the name of that account.
None of this establishes residence or Golden Visa eligibility for any unit in this project. The page prints no price, and the value of a unit, its registered title and the applicant’s own case are checked with the authority. Background is in the guides on the Dubai Golden Visa, whether foreigners can buy apartments in Dubai, freehold and leasehold in Dubai, mortgages for foreigners and property tax in Dubai, and the off-plan buyers guide covers the staged-payment route in full.
DAMAC Properties is a Dubai developer. In a press release of 4 September 2026 on PR Newswire, DAMAC says it has handed over more than 50,000 homes and is targeting more than 8,800 residential units for delivery in 2026, across DAMAC Lagoons, DAMAC Hills, DAMAC Hills 2, Chic Tower and Elegance Tower. The release names Amira Sajwani as Managing Director.

The navigation of the developer’s own site lists the communities DAMAC Islands 2, DAMAC Islands, DAMAC Riverside, DAMAC Sun City, DAMAC Lagoons, DAMAC Hills 2 and DAMAC Hills.
These are DAMAC’s statements and are quoted as such. For this project, the developer names Killa Design as the designer and de GRISOGONO as the brand partner, and the pages read do not name a contractor. The Zawya release of 29 November 2023 quotes Mohammed Tahaineh, named there as General Manager of Projects, on the works. The sales documents for a unit show which company signs for the seller, and the Dubai developers page gives the wider directory.
The list turns each open point into a document or an answer that can be requested before paying. It is the normal check set for an off-plan or resale purchase and implies nothing about the project or its owners.

The developer places it on Sheikh Zayed Road at the edge of Safa Park. Property Finder and Sotheby’s International Realty file it under Al Wasl. The pages print no street address or plot number.




The developer page prints Q4, 2026. Property Finder prints Q4 2026, December 2026 and expected completion on 31 December 2026, and the Zawya release says final completion is planned for Q4 2026. The contract date governs.
The developer prints no price. Property Finder prints a starting price of AED 4,453,000 (about USD 1,212,526), and Sotheby’s International Realty prints a one-bedroom “price from” AED 1,600,000 (about USD 435,671). These are portal figures and differ by unit type.
The developer page shows “Available on request” and no stock. Property Finder shows one resale listing. Availability is confirmed with DAMAC in writing, and a resale is bought from its owner on the owner’s terms.
Property Finder lists freehold ownership and a 4 % government fee, and the developer page does not state tenure. DLD says foreign ownership is registered in areas the Ruler specifies. Confirm the title type in the contract and at DLD.
This guide makes no claim for the project or any unit. u.ae lists real estate investors with a minimum capital of AED 2 million and property ownership, and the authority decides on the unit’s documents.
These DAMAC pages cover projects on or near Sheikh Zayed Road and the Dubai Canal; each opens once it is published. The handover column repeats what the developer prints, as checked on 13 November 2026, and is not a statement of availability.
| Project | Area as the developer prints it | Handover as the developer prints it |
|---|---|---|
| DAMAC Safa Gate | Sheikh Zayed Road | Q4 2029 (unit cards) |
| Safa Two de GRISOGONO | Sheikh Zayed Road | No figure printed on the page |
| Safa Two de GRISOGONO Tower B | Sheikh Zayed Road | Q2 2027 |
| Aykon City Tower B | Sheikh Zayed Road | Q3 2023 (ready building) |
| DAMAC Canal Heights 2 de GRISOGONO | Business Bay | Q3 2027 |
| Couture by Cavalli | Business Bay | Q2 2027 |
| Altitude de GRISOGONO | Business Bay | Q1 2028 (page data) |
Safa Two de GRISOGONO and Safa Two de GRISOGONO Tower B are two entries for the same project in the data file used for this guide, and each guide links the other. Existing listings in Business Bay and Downtown Dubai on this site include The Quayside by Ellington, The Crestmark by Ellington and DT1 by Ellington in Downtown Dubai, and the existing DAMAC-related listing is Celestia in Dubai South. The UAE country page lists all UAE properties.
Last checked: 13 November 2026. Sources:
This is not legal, tax or financial advice.
