Safa Two de GRISOGONO Tower B Dubai: Sources Guide (2026)

Sheikh Zayed Road, Dubai, UAE
  • DAS23117
  • Property ID
  • Apartment
  • Property Type
  • 5
  • Bedrooms
  • 6
  • Bathrooms
  • 93.8 - 1308.8
  • sq. m.
For Sale
Safa Two de GRISOGONO Tower B Dubai: Sources Guide (2026)
Sheikh Zayed Road, Dubai, UAE

Description

Safa Two de GRISOGONO Tower B Dubai is an off-plan apartment tower on Sheikh Zayed Road that DAMAC Properties lists on its project page with a printed handover of Q2, 2027, while the two unit cards on the same page show Q4 / 2029 and the page prints no price.

Safa Two de GRISOGONO Tower B Dubai render at night with skyline

This guide to Safa Two de GRISOGONO Tower B Dubai reads the developer page, Property Finder, Gulf News and Zawya as they stood on 13 November 2026. The handover, the price, the payment plan, the number of floors and even the area label differ between them, so each figure is shown with its source and date and no source is treated as the winner.

It adds the sizes converted to square metres, the amenities as listed, the Dubai rules that apply to any off-plan purchase, the Golden Visa rule as the authorities word it, and a list of what a buyer can ask for in writing before reserving.

Overview of Safa Two de GRISOGONO Tower B Dubai

The DAMAC project page calls the building Safa Two de GRISOGONO Tower B and describes a tower on Sheikh Zayed Road with a “ruby heart” at its core, branded by de GRISOGONO. The page text offers studios and one to three bedroom apartments that it calls modifiable residences. All of that is the developer’s own wording, as read on 13 November 2026.

Render of the tower crown above clouds with the ruby opening

The same page prints a payment plan of “10/90*” with an asterisk and no breakdown, a project handover of Q2, 2027, and a header line reading “1 – 5 Bedrooms” for apartments. The price field reads “From Loading…” in the page as delivered, so no price is printed. Everything about price below therefore comes from a portal or from an inference that is labelled as one.

On DAMAC’s site the building has its own entry, separate from the entry for Safa Two de GRISOGONO. Per the data file for this batch, the two entries describe the same Safa Two project, and the guide to the other entry is linked in section 11. This guide covers only what the Tower B entry and the portals print for Tower B.

Safa Two de GRISOGONO Tower B Dubai: item As printed (source, date seen 13 November 2026)
Developer DAMAC Properties (DAMAC project page)
Branding as printed “Branded by de GRISOGONO” (DAMAC project page); nothing further is stated here about the partner
Location text Sheikh Zayed Road, Dubai (DAMAC); Business Bay, Safa Two (Property Finder)
Status Off-plan (DAMAC page data); “currently under development” (Property Finder)
Project handover Q2, 2027 (DAMAC intro block); Q4 / 2029 (both DAMAC unit cards); June 2027 (Property Finder)
Payment plan 10/90* (DAMAC); 20/40/40 (Property Finder)
Unit types Studios and 1-3 bedroom apartments (DAMAC text); “1 – 5 Bedrooms” (DAMAC header); 1 and 2 bedroom cards (DAMAC)
Price No price printed by DAMAC; “3M AED” launch price (Property Finder)
Total units Not stated in any source read

The rest of this guide follows that table row by row. Where a row holds two values, the sections that follow say where each comes from and what a buyer can do to settle it in writing. None of the figures is a statement of availability, and the page is an information profile, not an offer.

What each source prints about status, handover, location, floors and tenure

Four public sources describe Safa Two Tower B: the developer page, a Property Finder project page, a Gulf News launch article and a Zawya press release. Only the first two are about Tower B itself. Gulf News and Zawya write about Safa Two as a whole, which they call a twin tower, so their figures are context rather than Tower B data.

Safa Two Tower B: item DAMAC project page, 13 Nov 2026 Property Finder, 13 Nov 2026 Gulf News, 15 Jun 2022 (Safa Two) Zawya (Safa Two)
Status Off-plan “Currently under development”; construction started 21 April 2024 Launch article Excavation and piling complete, substructure in progress (undated; video titled November 2023)
Handover Q2, 2027 (intro); Q4 / 2029 (unit cards) June 2027; expected completion 30 June 2027 Q3-2027 “Anticipated completion date of 2027”
Location Sheikh Zayed Road Business Bay, Safa Two; “edge of Safa Park” Safa area; second twin tower after Safa One “Sheikh Zayed Road next to Aykon City”
Floors / buildings Not printed 1 building “Up to 80 storeys”, twin tower “80+ floor twin-tower”
Tenure Not printed Freehold; government fee 4% Not stated Not stated
Payment plan 10/90* 20/40/40 Not stated Not stated

A few of those differences are worth reading closely. The two handover values on the developer’s own page are covered in section 4. The floor figures describe the twin-tower Safa Two project rather than Tower B, and neither the developer page nor Property Finder prints a floor count or a unit count for Tower B. The data file also lists floor counts from two aggregator pages found only through a search; they were not opened and are not used here.

The location labels differ in a way that matters for a buyer comparing areas. The developer page files the building under Sheikh Zayed Road, Property Finder under Business Bay, and Zawya describes it as next to Aykon City. Section 6 sets the labels beside the developer’s own coordinates and distances.

Tenure is printed only by Property Finder, which lists the building as freehold. The developer page prints no tenure. Dubai’s freehold rule is covered in section 7, and the title category is on the list of items to ask for in writing in section 9.

Status and prices today: the developer page, the portal and an inference for Safa Two Tower B

The developer page shows no price for Safa Two Tower B. Both the intro block and the two unit cards carry the label “From Loading…”, which is the text in the page as delivered on 13 November 2026. Reading the page’s embedded data gives integer fields for a minimum and a maximum price that are not formatted as money, and a “From” label under a pound-sterling display setting. No integer from that data is reproduced here as a price.

Render of the curved podium facade at street level

The data file for this batch records an inference: if the minimum field is read as dirhams with two implied decimals, it corresponds to AED 3,263,000 for the one-bedroom card and AED 4,722,000 for the two-bedroom card. That is an inference from the payload, not a printed price, and no portal prints either figure, so it is shown below as unconfirmed.

Price statements for Safa Two de GRISOGONO Tower B Dubai As stated USD at the peg of 3.6725, arithmetic Status of the figure
DAMAC project page, intro block “From Loading…” none No price printed
DAMAC page data, 1 bedroom card Inferred AED 3,263,000 (payload read with two implied decimals) about USD 888,496 Inference, no portal matches it
DAMAC page data, 2 bedroom card Inferred AED 4,722,000 (same reading) about USD 1,285,773 Inference, no portal matches it
Property Finder, header Launch price “3M AED” about USD 816,882 Listing-site indication, 13 Nov 2026
Property Finder, FAQ Starting price AED 2,974,000 about USD 809,803 Listing-site indication, 13 Nov 2026
Property Finder, by type 1 bed from 3M; 2 beds from 3.9M; 3 beds from 4.1M; duplex 2 beds from 7.8M; duplex 3 beds from 9.3M (AED) about USD 816,882; 1,061,947; 1,116,406; 2,123,894; 2,532,335 Listing-site indication, 13 Nov 2026
Gulf News, 15 June 2022 (Safa Two launch) Studio from Dh750,000 about USD 204,221 Launch-article price for Safa Two, 2022

The AED figures convert at the pegged rate of 3.6725 dirhams per US dollar; the Central Bank of the UAE’s published rate table for June 2026 lists the US dollar at 3.6725 (CBUAE rate table, June 2026). The USD column is arithmetic on that rate, not a quotation by anyone.

Two portal figures for the same building, 3M and 2,974,000 on one page, are not the same number, and the portal does not say which is current. The Gulf News price is from a 2022 article about the twin-tower project and is shown only as a dated reference. Resale asking prices on portals are not used in this guide.

The developer page also marks its unit cards with a “GOLDEN VISA” label. Whether any unit qualifies for residence is not something this guide claims; the rule is set out in section 8.

As for availability, the page’s own embedded data flags inventory as available for Tower B, while Property Finder’s page for the parent Safa Two entry labels it sold out for new sales and the Tower B page links 19 resale listings (13 November 2026). Those are statements by different sources about different entries. This guide does not say that any unit is available or sold out; a reservation form with a unit number is the only document that settles it.

Five handover dates and a payment plan: how to read the schedule

The sharpest question about Safa Two de GRISOGONO Tower B Dubai is when it hands over. The developer page itself gives two different answers, and three outside sources give three more. Laid out by date and source, the picture is as follows.

Render of the elevated infinity pool with ruby-shaped opening
Handover value Where it is printed Date seen or published
Q2, 2027 DAMAC project page, “Project Handover” in the intro block 13 Nov 2026
Q4 / 2029 DAMAC project page, handover line on both unit cards (1 BR and 2 BR) 13 Nov 2026
31 October 2029 DAMAC page data, delivery-date and availability-date fields 13 Nov 2026
June 2027; expected completion 30 June 2027 Property Finder, key information and project timeline 13 Nov 2026
Q3-2027 Gulf News launch article about Safa Two 15 Jun 2022
“Anticipated completion date of 2027” Zawya press release about Safa Two Undated

Q4 / 2029 on the cards and 31 October 2029 in the data agree with each other, and Q2, 2027 agrees with the portal’s June 2027 and with the two press items. That grouping is an observation about how the figures line up, not a judgement about which is right. A page can print a project-level quarter in its headline block and a unit-level availability date on its cards for reasons the page does not explain.

One point of arithmetic helps a reader: from 13 November 2026, Q2, 2027 is a window starting about five months away, while Q4 / 2029 is about three years away. A difference of that size changes how a buyer would schedule money, mortgage timing and any plan to move in, so it belongs in the contract, not in a brochure line.

The two payment plans

Payment plan for Safa Two Tower B As printed Source and date
10/90* Asterisk, no breakdown or footnote text on the page DAMAC project page, 13 Nov 2026
20% at sales launch, 40% during construction, 40% on handover Three steps printed Property Finder, 13 Nov 2026

The two schedules cannot both describe the same contract: one reads as a first instalment and a balance, the other as three instalments with a construction-stage middle. The asterisk on the developer’s figure suggests conditions that the page does not print. Without the sale and purchase agreement it is not possible to say which applies, or whether either does.

For a buyer, the practical reading is to ask for the exact schedule in the contract, with each instalment tied to a date or to a construction stage, and with the escrow account named. Dubai’s Real Estate Regulatory Agency (RERA) and the Land Department say that instalment requests relate to completion percentages, and that the buyer may ask for the completion percentage as confirmed by a Land Department-approved consultant before paying a stage-linked instalment (DLD frequently asked questions).

Neither source prints a construction percentage for Tower B. The only construction-related statements are Property Finder’s start date of 21 April 2024 and the Zawya note that excavation, piling and substructure were under way at the time of that release. The project’s registered status can be read on the Land Department’s public project-status search (DLD project status enquiry), which is described further in section 7.

Unit types, sizes and amenities of Safa Two Tower B

The developer’s unit cards for Safa Two Tower B list two types: a one-bedroom apartment “up to 1,245 sq ft” and a two-bedroom apartment “up to 2,605 sq ft”, both showing Q4 / 2029. Developer page data also gives a project-wide area range of 1,010 to 14,088 sq ft, bedroom counts of 1, 2 and 5, and bathroom counts of 2, 3, 4 and 6. The header block, however, says “1 – 5 Bedrooms”, and the text says “studios and 1-3 bedroom apartments”.

Render of the double-height lobby with red chandelier
Sizes at Safa Two Tower B Square feet as printed Square metres (x 0.092903, calculated) Source
1 bedroom card, up to 1,245 115.7 DAMAC unit card
2 bedroom card, up to 2,605 242.0 DAMAC unit card
Project-wide minimum 1,010 93.8 DAMAC page data
Project-wide maximum 14,088 1,308.8 DAMAC page data
Property Finder 1-bed plans 956 and 1,245 88.8 and 115.7 Property Finder
Property Finder 2-bed plans 1,286 and 2,061 119.5 and 191.5 Property Finder
Property Finder 3-bed plans 1,931 and 1,942 179.4 and 180.4 Property Finder
Property Finder duplex 2-bed plans 2,097 and 2,605 194.8 and 242.0 Property Finder
Property Finder duplex 3-bed plan 2,284 212.2 Property Finder

The 2,605 sq ft plan is the clearest example of a label conflict. The developer’s card calls it a two-bedroom apartment; Property Finder lists a 2,605 sq ft plan as a two-bedroom duplex with a starting price of AED 7.8M. The developer FAQ for the project says Safa Two will offer studio, 1, 2 and 3 bedroom apartments and penthouses. Those descriptions are all attributed here; none is chosen.

The images on the project page are marketing renders, not photographs of a finished building. Their descriptions, as used on this site, are limited to what each render shows: the tower at night with the skyline, the crown above clouds with a ruby-shaped opening, a curved podium facade, an elevated pool, a double-height lobby, a duplex living room with a mezzanine, a master bedroom, a one-bedroom bedroom with a balcony view, a garden with red mist and a ground-level pool with cabanas.

Amenities as the developer lists them

Amenity at Safa Two Tower B Developer wording (shortened) Image on the page
Infinity pool “Relax at the ruby heart”, soft sands and a pool with a city view Render of an elevated infinity pool with a ruby-shaped opening
Cafes and restaurants A set of cafes and restaurants in an elegant setting Amenity image on the page, not described here
Fog Forest A garden with greenery and a calm atmosphere Render of the garden with red mist
Edge Walk A walk at the highest points with views Amenity image on the page, not described here
Glass Slide A slide with panoramic views high above the city Amenity image on the page, not described here
Ground-level pool A pool at ground level for relaxation Render of a ground-level pool with palms and cabanas

Property Finder’s amenity list is different and generic: swimming pool, retail outlets, food and beverage outlets, beach pools, green areas, gardens and parks. The developer’s headline superlatives about the tower are marketing and are not repeated. Which of these facilities are inside Tower B, and which are shared with a neighbouring tower, is a question for the contract documents.

Location of Safa Two de GRISOGONO Tower B Dubai: Sheikh Zayed Road, Business Bay or Al Safa, and the distances printed

The developer places Safa Two de GRISOGONO Tower B Dubai on Sheikh Zayed Road and, in its FAQ, “at the edge of Business Bay”. The project data carries a latitude of 25.1812294 and a longitude of 55.25229053. Property Finder files it under Business Bay, Safa Two, and says it sits on the edge of Safa Park. Zawya’s press text says the Safa Two tower is next to Aykon City. These are different ways of describing the same stretch of road, and none of them is a district assignment from the Land Department.

Render of a duplex living room with mezzanine and city view
Area label for Safa Two Tower B Source Date seen
Sheikh Zayed Road DAMAC project page and page data (area field) 13 Nov 2026
“At the edge of Business Bay” DAMAC project FAQ 13 Nov 2026
Business Bay, Safa Two Property Finder location line 13 Nov 2026
“Edge of Safa Park” Property Finder description 13 Nov 2026
“Next to Aykon City” Zawya press release Undated

The developer’s FAQ gives drive or travel times in minutes for nearby places. The page does not say whether those are driving times, and the figures are the developer’s, not measured. They are copied below as printed, and the airport entries are the only ones that name a mode.

Category Place and time as printed by the developer
Shopping City Walk 5 minutes; Box Park 5; The Dubai Mall 10; Oasis Mall 10; Mall of the Emirates 15
Healthcare Medcare Hospital Al Safa 5; Mediclinic The Dubai Mall 10; Emirates Hospital 15; Aster Clinic 20; Prime Medical Centre 25
Hotels Paramount Hotel Midtown 5; JW Marriott Marquis 10; Habtoor Palace 10; The Oberoi 15; Holiday Inn Express 15; Paramount Hotel Al Khail Road 20
Schools Al Ittihad School 5; Safa British School 10; Horizon International School 10; The English College 15; JSS Private School 20
Airports Dubai International Airport: 20-minute drive; Al Maktoum International Airport: 35-minute drive “when fully operational”

The FAQ adds that Safa One is on the other side of Sheikh Zayed Road and that Jumeirah Beach is 15 minutes away. Property Finder lists a shorter set of the same kind of figures (City Walk 5 minutes, The Dubai Mall 10, Oasis Mall 10, Medcare Hospital Al Safa 5, Emirates Hospital 15, Dubai International Airport 20, Al Maktoum International Airport 35).

Straight-line distances between DAMAC projects nearby

Using the latitude and longitude fields on DAMAC’s own project pages, the straight-line distance from Tower B to other DAMAC entries in the data file can be calculated with the haversine formula. These are calculated figures, in kilometres, not road distances, and a page coordinate is a map pin that may not sit on the building itself.

From Safa Two Tower B to Developer coordinates Straight-line distance, calculated
Aykon City Tower B 25.181371, 55.252577 about 0.03 km
Safa Gate 25.1817975, 55.2499828 about 0.24 km
Couture by Cavalli 25.188877, 55.243229 about 1.25 km
Canal Heights 2 de GRISOGONO 25.183751, 55.279772 about 2.78 km
Altitude de GRISOGONO 25.182357, 55.281266 about 2.92 km

That comparison says only that Tower B, Aykon City Tower B and Safa Gate are on one stretch of Sheikh Zayed Road in the developer’s coordinates, and that two other de GRISOGONO-branded entries sit about three kilometres east along the Dubai Canal side of Business Bay. Distances to the metro, the canal or the beach are not printed by any source and are not calculated here.

A recent DLD announcement is relevant to the Sheikh Zayed Road label and to tenure questions in general. On 19 January 2025 the Land Department said that private owners on Sheikh Zayed Road, from the Trade Centre Roundabout to the Water Canal, could convert their ownership to freehold for all nationalities, with 128 plots eligible there and 329 in Al Jaddaf (DLD news, 19 January 2025).

The release is about land owners converting plots; it does not name this project, so the title category of any unit remains a question for the contract.

Buying off-plan in Dubai: the steps and fees that apply to Safa Two Tower B

The following describes how Dubai’s official channels word the process for any off-plan unit, and it is not specific to this tower. It is a reading of public pages on 13 November 2026, and the sources are linked. This is not legal, tax or financial advice.

Render of a master bedroom with red and cream interior
Step Who acts What the official source says Source
1. Ownership area Buyer, developer Foreign ownership is permitted in areas designated as freehold; Article 3 of Regulation No. 3 of 2006 identifies the freehold plots; title deeds are issued by the Land Department; the page notes no age limit to own property u.ae, expatriates buying a property
2. Developer and project Developer, DLD The Land Department’s Register Project service lets a developer register a project and open an escrow account for off-plan sales; the land must be in a freehold or long-term lease area; a 30% construction guarantee is required (completed construction, a bank guarantee or a cash deposit) DLD register project
3. Contract and register Developer, buyer Units sold off-plan are registered at the provisional register through the Oqood portal; the service page lists 2% payable by the seller and 2% by the purchaser, plus AED 10 knowledge and AED 10 innovation fees DLD initial sale registration
4. Registration fee Buyer, developer The Land Department says the registration process is carried out by the developer after the buyer has paid the required fees, 4% of the property value, in the manner agreed between seller and buyer; payment is by approved bank cheque, the Noqodi developer wallet or the approved escrow account DLD news, 31 May 2021
5. Escrow Developer, bank Amounts collected from buyers of off-plan units are deposited in the project’s escrow account; the escrow account law applies to all developers selling off-plan in Dubai, and the FAQ cites Law No. 8/2007 DLD frequently asked questions
6. Instalments and progress Buyer, developer Because payment schedules follow completion rates, the buyer may ask for the completion percentage, confirmed by a Land Department-approved consultant, before paying a request tied to a stage DLD frequently asked questions
7. Checking a project Buyer The Project Status Enquiry service searches by project name or project number and shows developer details, management companies and the escrow bank, and can be reached through the Dubai REST app DLD project status enquiry

Two points in that table deserve a plain reading. The 4% figure and the 2% plus 2% split in step 3 both appear on Land Department pages, written for different audiences (a buyer-side release and a developer-side service), and the pages do not reconcile them. A buyer asks the developer to show how the fee is itemised in the sale agreement. Property Finder’s “government fee 4%” for Tower B matches the 4% release.

Step 5 matters most for an unbuilt tower. The escrow account is the mechanism by which instalments are held and released against construction, and the Land Department names a “Real Estate Escrow Account Department” for queries. An account name and a project number are normal items on a reservation form, and they are what a buyer uses to run the status search in step 7.

Step 7 also helps to settle the open question about Safa Two Tower B: the search shows the project name and number under which DAMAC registered it, the registered developer, and the escrow bank. The Land Department also keeps a public list of approved developers (DLD approved developers) and a title-deed verification service (DLD title deed verification) that applies after a title deed exists.

This site’s guides cover the same ground in more general terms: the off-plan buyers guide, whether foreigners can buy apartments in Dubai and freehold versus leasehold in Dubai. They carry older figures in places, so the official pages above are the reference for fees. Financing is covered in the guide to mortgages in Dubai for foreigners.

Golden Visa rule, service charges and annual costs: what the authorities say

The unit cards for Safa Two Tower B carry a “GOLDEN VISA” label, and portals often repeat the phrase. The label is the developer’s; no unit of this tower is claimed here to meet the rule. What the authorities say is set out below, and the rule is checked with the authority before a purchase decision.

Render of a one-bedroom apartment bedroom with balcony view
Authority What it prints on 13 November 2026 Source
Dubai Land Department, investor service A real estate investor owning property whose purchase value is AED 2 million or more at the time of purchase may apply for a 10-year renewable residence permit; spouse, children and parents can be sponsored; the property may be mortgaged, with a bank letter showing the paid amount; the applicant must be in the UAE; the title deed is among the required documents DLD golden visa service
UAE Government portal, eligible categories Investors in public investments or real estate: 5 years for real estate investments, with a minimum capital of AED 2 million and property ownership u.ae golden visa

The two official pages word the duration differently, 10 years on the Land Department service page and 5 years in the government portal table for real estate investments, and neither explains the difference. For an off-plan unit the Land Department page asks for a title deed, so it is the authority’s procedure, not the developer’s label, that decides when an application can be made. The site’s own explainer is the guide to the Dubai Golden Visa.

Service charges after handover

The Land Department defines the service charge as the annual financial charge, approved by RERA, collected from owners of units to cover management, operation, maintenance and repair of jointly owned property (DLD frequently asked questions). A public calculator takes a certificate number, property type and budget year, or a project, usage and budget year (DLD service charge index).

Under Law No. 6 of 2019 on jointly owned real estate, as summarised by the Rental Disputes Center in January 2020, the owner is liable for service and usage charges unless the lease says otherwise, and RERA-approved invoices are the reference in disputes (DLD news, 6 January 2020). No source read prints a service-charge estimate for Tower B, so the figure belongs on the list in section 9.

Annual property tax and any municipal housing fee are not covered by a source read for this guide and no figure is given. The site’s own guide to property tax in Dubai is the place to start, and its numbers should be checked against the authorities before use.

What to ask for in writing before reserving Safa Two de GRISOGONO Tower B Dubai

Because the developer page prints no price, no tenure, no unit count and two different handover values, the written documents carry the facts that the public pages leave open. A buyer can ask for each of the following, and keep the answers with the reservation form.

Render of the Fog Forest garden with red mist
  1. The sale and purchase agreement, with the unit number, floor, layout type and area as registered, so the 1,245 and 2,605 sq ft figures on the cards can be matched to a specific unit.
  2. The handover date written in the contract, as a day or a quarter with the conditions that move it, so that Q2, 2027 and Q4 / 2029 are not left as alternatives.
  3. The payment schedule, instalment by instalment, stating whether it is the 10/90 plan, a 20/40/40 plan or another, and which stage or date triggers each payment.
  4. The name of the escrow account and its bank, and the Land Department project number, so the project can be looked up on the status search.
  5. The title category and tenure of the unit, with the freehold basis stated, since the developer page prints none.
  6. The fee schedule: the registration fee, whether it is 4% or split, who pays it, and any administrative or Oqood charges.
  7. A service-charge estimate per square foot for the first budget year, and the name of the management company.
  8. What the finish includes: the unit cards say unfurnished, so ask for the list of fixtures, appliances and floor finishes.
  9. The full legal name and registration details of the contracting entity, and who signs for the developer.
  10. Whether the brand partner’s name carries any obligation for the buyer, and where the branding terms are written.
  11. The building’s construction percentage as certified by a Land Department-approved consultant, if an instalment is tied to a stage.
Open question about Safa Two Tower B Public answer today Where the answer should come from
Which handover date applies Q2, 2027 or Q4 / 2029 SPA clause
Which payment plan applies 10/90* or 20/40/40 SPA schedule
Price of a given unit None printed by the developer Reservation form
Number of units and floors in Tower B Not stated Developer, DLD project record
Tenure of a given unit Freehold per Property Finder only Title documents
Service charge Not stated Management company, RERA index

A reservation is not a registration. Between the two sits the sale and purchase agreement and, for off-plan units, the provisional registration described in section 7. Asking for the documents before paying the reservation amount is a normal sequence and not a sign of doubt about any party.

DAMAC Properties (developer)

The developer named on the project page is DAMAC Properties, a Dubai developer. In a November 2024 press release DAMAC says that since its founding in 2002 it has launched more than 75 towers and had delivered more than 47,000 homes, with over 40,000 more in planning and development (PR Newswire, 20 November 2024). A September 2026 release states that more than 50,000 homes had been handed over, with 55,000 or more units and over 100 million square feet in planning and development (PR Newswire, 4 September 2026).

Render of the ground-level pool with palms and cabanas

The 2024 release names the founder and chairman as Hussain Sajwani, and the navigation of DAMAC’s website lists communities including DAMAC Hills, DAMAC Hills 2, DAMAC Lagoons, DAMAC Sun City, DAMAC Riverside, DAMAC Islands and DAMAC Islands 2. The 2026 release says 8,800 or more units are targeted for delivery in 2026 across DAMAC Lagoons, DAMAC Hills, DAMAC Hills 2, Chic Tower and Elegance Tower. These are DAMAC’s own statements and are attributed to it.

Brand partnerships as printed by DAMAC include Versace, Roberto Cavalli and de GRISOGONO. For Safa Two the page says only “Branded by de GRISOGONO”. DAMAC’s self-descriptions as the largest or a leading developer are not repeated, and the approved-developer register on the Land Department’s site is the place to confirm the licensed entity (DLD approved developers). For a wider look at developers in the city, see the Dubai developers directory.

How Safa Two Tower B sits among other DAMAC projects and nearby Dubai listings

DAMAC lists a second entry for the same project: Safa Two de GRISOGONO. Per the data file, that entry shows no inventory and no price, its handover is not printed (the page data carries 30 June 2027), and Property Finder shows it with three buildings, Tower A, Tower B and other. This guide for Tower B does not copy text from it. The guide to the other entry is Safa Two de GRISOGONO Dubai.

Project Area as printed by DAMAC Handover as printed by DAMAC Guide
Safa Two Tower B Sheikh Zayed Road Q2, 2027 (intro); Q4 / 2029 (cards) This page
Safa Two de GRISOGONO Sheikh Zayed Road Not printed on the page Guide
Safa One de GRISOGONO Sheikh Zayed Road Q4, 2026 Guide
Safa Gate Sheikh Zayed Road Q4 / 2029 on unit cards Guide
Aykon City Tower B Sheikh Zayed Road Ready building, Q3 2023 on the page Guide
Couture by Cavalli Business Bay Q2, 2027 Guide
Canal Heights 2 de GRISOGONO Business Bay Q3, 2027 Guide
Altitude de GRISOGONO Business Bay Q1 2028 (page data, 31 March 2028) Guide

The table is a list, not a ranking, and nothing in it says that one entry is better than another. Handover values are as printed on each DAMAC page on 13 November 2026 and carry the same caveat as in section 4.

Other Dubai listings on this site in the same part of the city include The Quayside by Ellington and The Crestmark by Ellington, both in Business Bay, and Bayz by Danube. The existing DAMAC listing on this site is Celestia in Dubai South. The wider market picture is in the Dubai real estate market guide, whose older numbers should be checked before use.

Frequently asked questions

When does Safa Two de GRISOGONO Tower B Dubai hand over?

DAMAC’s project page prints Q2, 2027 as the project handover and Q4 / 2029 on its two unit cards, with 31 October 2029 in the page data. Property Finder prints June 2027. The date that binds a buyer is the one written in the sale and purchase agreement.

Is there a price for Safa Two de GRISOGONO Tower B Dubai?

The developer page prints no price on 13 November 2026 (“From Loading…”). Property Finder prints a launch price of 3M AED and a starting price of AED 2,974,000. At the pegged rate of 3.6725 those are about USD 816,882 and USD 809,803.

Which payment plan applies to Safa Two Tower B?

DAMAC prints “10/90*” with an asterisk and no breakdown, and Property Finder prints 20% at sales launch, 40% during construction and 40% on handover. The exact schedule is the one in the contract.

Is Safa Two de GRISOGONO Tower B Dubai freehold?

Property Finder lists it as freehold. The developer page prints no tenure. Dubai permits foreign ownership in areas designated as freehold, so the title category of a unit is something to confirm in writing and on the title documents.

How many units and floors does Safa Two Tower B have?

Neither the developer page nor Property Finder prints a unit count or a floor count for Tower B. Gulf News and Zawya write about the twin-tower Safa Two as having up to 80 storeys or more than 80 floors.

Does a purchase qualify for the Golden Visa?

That is not claimed here. The Land Department’s service refers to a purchase value of AED 2 million or more at the time of purchase and a title deed, and the UAE portal lists real estate investors with a minimum of AED 2 million. A buyer checks the rule and the unit with the authority.

Where does the money go during construction?

Under the Land Department’s description, amounts collected from off-plan buyers are deposited in the project’s escrow account. The buyer asks for the account name and the project number and can search the project on the Land Department’s status service.

Why do the sources label Safa Two de GRISOGONO Tower B Dubai differently?

The developer files it under Sheikh Zayed Road, Property Finder under Business Bay, and Zawya places it next to Aykon City. The labels point to the same stretch of Sheikh Zayed Road, and none is an official district assignment.

Sources and last check

Last checked: 13 November 2026. Sources:

This is not legal, tax or financial advice.

  • City Dubai
  • Country UAE

Features

  • Swimming Pool

Contact Information

Zhamal Abdykozhoeva
  • Zhamal Abdykozhoeva

Enquire About This Property

Property Inquiry

"*" indicates required fields

Name*
Please let us know what's on your mind. Have a question for us? Ask away.

Compare listings

Compare
Zhamal Abdykozhoeva
  • Zhamal Abdykozhoeva
Oman flag
HEADQUARTERS MUSCAT