Burj Binghatti Jacob and Co Residences Dubai: Guide (2026)

  • From $3,812,117
Business Bay, Dubai, UAE
  • BIBU3168
  • Property ID
  • Apartment, Penthouse, Villa
  • Property Type
  • 6
  • Bedrooms
  • 9
  • Bathrooms
  • 210.1 - 2087.4
  • sq. m.
For Sale
Burj Binghatti Jacob and Co Residences Dubai: Guide (2026)
Business Bay, Dubai, UAE
  • From $3,812,117

Description

Burj Binghatti Jacob and Co Residences Dubai is a residential tower in Business Bay that the developer, on its project list read on 15 November 2026, priced with the line Starting AED 13,999,999, about USD 3,812,117 at the pegged rate of 3.6725 per USD, for 2, 3 and 4-bedroom residences.

Burj Binghatti Jacob and Co Residences Dubai tower rendering beside Burj Khalifa

This guide to Burj Binghatti Jacob and Co Residences Dubai sets the developer’s project page and list card beside the Dubai Land Department (DLD) project register as relayed by a handover tracker, and beside pages from Sotheby’s, Property Finder, Whitewill, DubaiHaus, Binayah and a trade magazine. The developer’s project page prints no status, handover date, payment plan or unit count, and the sources that do print them disagree, so every figure appears with its source and date and none is chosen over another.

The sections that follow cover the register readings, the floor and unit counts, the residence types and sizes, the prices and plans, the district, the Dubai off-plan rules taken from official pages, and a list of items to ask for in writing. It is an information profile and not an offer, and it does not say that any particular unit is available.

Overview of Burj Binghatti Jacob and Co Residences Dubai

The developer’s project page carries the title Burj Binghatti Jacob&Co Villas & Penthouses at Business Bay and describes the tower as a collaboration of Binghatti and Jacob & Co. The partner is stated here only as the developer prints it, and this guide adds no claim about the partner. The page has a concept section, a design-process section, a section on the crown at the top of the tower, and a gallery of named residences.

Aerial dusk rendering of the tower in Business Bay with Dubai Water Canal and Burj Khalifa

The gallery names six residences: the Ruby Villa (three bedrooms), the Emerald Villa (two bedrooms), the Sapphire Villa (shown with a private pool), the Diamond Sky Mansion, the Fleur de Jardin Sky Mansion (six bedrooms) and the Astronomia Sky Mansion Penthouse (five bedrooms). Four tiles for 2, 3, 4 and 6 bedrooms lead to 360-degree tours. The page prints no area, price, status or date for any of them, as read on 15 November 2026.

The one price the developer prints sits on its project list, where the card for this tower reads Starting AED 13,999,999, the location Business Bay and the types 2 BR, 3 BR and 4 BR. The card does not say which type the figure belongs to. The list also carries a launch date of 2023-05-25 for the card, which is a data attribute in the page markup and not visible text.

Burj Binghatti Jacob and Co Residences Dubai key facts As published Source and date
Developer Binghatti (Binghatti Developers); the DLD register entity is Binghatti Developers Fze binghatti.com; Real Estate Club Dubai, 12 Nov 2026
Name and partner as printed Burj Binghatti Jacob & Co Residences; a collaboration of Binghatti and Jacob & Co binghatti.com project page, 15 Nov 2026
Community Business Bay; the plot and sub-community are not printed by any source read binghatti.com list card; data file, checked 14 Nov 2026
Status on the developer page None printed binghatti.com, 15 Nov 2026
Status in the DLD register Construction progress 52 percent from 3 Sep 2026; start October 2022 Real Estate Club Dubai, citing the DLD registry, 12 Nov 2026
DLD project number 2480, registered project value AED 876.5 million Real Estate Club Dubai, 12 Nov 2026
Price printed by the developer Starting AED 13,999,999 (about USD 3,812,117) binghatti.com project list, 15 Nov 2026
Unit types on the card 2 BR, 3 BR, 4 BR; tiles for 2, 3, 4 and 6 bedrooms on the page binghatti.com, 15 Nov 2026
Handover Not printed by the developer; June 2026 (register estimate) to June 2027 on other pages See section 2
Units 671 apartments (register) against 299 in total, 88 for sale (Whitewill) See section 4
Floors Between 98 and over 112 depending on the source See section 4
Tenure Not printed by the developer; Freehold on Property Finder Property Finder, 15 Nov 2026
Payment plan Not printed by the developer; 10/20/70 on two portals See section 6

What each source prints about status, handover, floors, units, tenure and plan

For this tower the same item is often printed in several forms. The table puts the developer first, then the DLD register as relayed by the tracker, then the press and the portals. A difference between two entries is a dated difference between documents. It is not a statement that either document is wrong, and the guide ranks none of them.

Burj Binghatti Jacob and Co Residences Dubai: item What is printed Source and date
Status Nothing printed on the project page binghatti.com, 15 Nov 2026
Status Under construction; 52 percent official build progress from 3 Sep 2026 and 35 percent for the readings of 13 Jun to 31 Aug 2026 Real Estate Club Dubai, citing the DLD registry, 12 Nov 2026
Status Under construction; completion expected between 2026 and 2027, subject to final construction progress and authority timelines Sotheby’s journal, 27 May 2026
Status Off-plan; construction started 2 October 2022; no completion percentage Property Finder, 15 Nov 2026
Status Under construction; 2.74 percent, undated, labelled a figure provided by the developer Binayah, 15 Nov 2026
Handover Nothing printed on the project page binghatti.com, 15 Nov 2026
Handover June 2026, the original estimate in the register Real Estate Club Dubai, 12 Nov 2026
Handover Stated to be completed by June 2026 Binghatti blog, 23 Jul 2025
Handover Q2 2026 (due date), undated; Q2 2026 as target handover, undated Whitewill; Binayah, 15 Nov 2026
Handover Q2 2027 in the header, June 2027 in the key information, June 30, 2027 in the timeline Property Finder, 15 Nov 2026
Handover Jun 2027 in the header tile, 2027-06-30 as completion date, undated DubaiHaus, 15 Nov 2026
Handover Q2 2026 on the Sotheby’s project card for a two-bedroom apartment, undated Sotheby’s project page, 15 Nov 2026
Handover Q2 2026, Q4 2026 and June 2027 on individual resale listings; listing pages not opened dubizzle.com search snippets, per the data file, checked 14 Nov 2026
Floors 98 floors Whitewill, 15 Nov 2026
Floors 104-storey Sotheby’s project page, 15 Nov 2026
Floors Over 100 storeys Gulf Construction, 1 Jul 2023
Floors 105 stories, with 74 residential, 28 penthouse and 10 commercial floors Binghatti blog, 23 Jul 2025
Floors Over 112 storeys DubaiHaus, 15 Nov 2026
Units 671 apartments Real Estate Club Dubai, 12 Nov 2026
Units 299 in total, 88 for sale Whitewill, 15 Nov 2026
Units 184 two-bedroom, 416 three-bedroom and 24 four-bedroom units, plus larger named residences Sotheby’s project page, 15 Nov 2026
Tenure Freehold; government fee 4 percent Property Finder, 15 Nov 2026
Tenure Not printed by the developer, the register page or the other portals read binghatti.com; Real Estate Club Dubai, 15 Nov 2026
Payment plan 10 percent at sales launch, 20 percent during construction, 70 percent on handover Property Finder; DubaiHaus, 15 Nov 2026
Payment plan Not printed by the developer or the register page binghatti.com; Real Estate Club Dubai, 15 Nov 2026

The handover rows deserve a plain reading. The earliest dates, June 2026 and Q2 2026, come from the register estimate, from the developer’s own blog of 23 July 2025 and from portals that give no date of their own. The 2027 dates come from Property Finder and DubaiHaus, and the Sotheby’s journal gives a window of 2026 to 2027. The developer’s project page gives none, so the date that counts for a buyer is the one written into the contract.

The Binghatti press release of 12 November 2026 on nine-month results names five projects completed in 2026 and says eight more are expected to complete by the end of the year, without naming them. This tower is not named in it. The guide takes nothing from that silence: it is one more dated document that prints no handover date for this project.

Status and the register: DLD readings in 2026 and the dates printed since 2022

The Real Estate Club Dubai handover tracker says it tracks projects against the DLD project registry, updates twice a week and last verified this tower on 12 November 2026. It gives the registered developer as Binghatti Developers Fze, the authority as the Dubai Development Authority, the project number as 2480, the construction start as October 2022 and the registered project value as AED 876.5 million. Those fields are the tracker’s relay of the register and should be checked at source.

Rendering of the Burj Binghatti Jacob & Co tower with crown at sunrise over Dubai skyline
Register reading (as relayed) Construction progress Completion estimate shown Source
13 June to 31 August 2026 (every reading listed) 35 percent June 2026 Real Estate Club Dubai, verified 12 Nov 2026
3 September to 12 November 2026 (every reading listed) 52 percent June 2026 Real Estate Club Dubai, verified 12 Nov 2026

The tracker calls the percentage the escrow-audited construction percentage, as distinct from a marketing estimate. The page names no escrow agent and no account, so the claim is the tracker’s wording and is not adopted as a fact about a particular account. The register’s own project record, reached through the DLD Project Status Enquiry, is the place to read the percentage, the escrow bank and the management company for project 2480.

A Binayah construction-update page prints 2.74 percent beside the words Latest recorded update, figure provided by the developer and subject to change, with no date. It also gives a target handover of Q2 2026. The guide shows that figure as printed and does not combine it with the register’s readings, because the page gives no date for it and says nothing of how it was measured.

Date What was printed Source
1 and 2 October 2022 Sales start 1 October 2022 and construction start 2 October 2022; the register page gives October 2022 for the construction start Property Finder; Real Estate Club Dubai, 15 Nov 2026
16 and 20 November 2022 A reveal event and press coverage of a plan for a 100-floor skyscraper, as the address of the Gulf Today page reads; that page returned an access error and was not read Search result only, per the data file, checked 14 Nov 2026
25 May 2023 Launch date attribute on the project-list card binghatti.com/en/projects, 15 Nov 2026
1 July 2023 Announcement of the sales launch of residential units, with unit-type names and five penthouses at the top Gulf Construction, 1 Jul 2023
23 July 2025 Work in progress and stated to be completed by June 2026 Binghatti blog, 23 Jul 2025
27 May 2026 Under construction, expected completion between 2026 and 2027 Sotheby’s journal, 27 May 2026
12 November 2026 Register reading of 52 percent; press release naming other projects Real Estate Club Dubai; Binghatti release, 12 Nov 2026

Read in order, the table shows a project announced in 2022, opened for sale in 2022 or 2023 depending on the source, and described in 2025 and 2026 with a handover target that moves between June 2026 and June 2027 from one document to the next. Each entry belongs to its own date. A buyer reading them together has four questions for the seller: which date is current, who set it, where it is recorded, and what the contract calls handover.

Counting the tower: floors, penthouses and units from the register text to the marketing figures

The sources disagree most on how large the tower is, and the disagreement can be followed in the numbers themselves. The register’s description, as the tracker prints it, reads: 7B+G+5P+3HC+6MECH+83Floors+FM Floor+5 Penthouse +Roof. The tracker does not expand the abbreviations, and neither does the guide, because a wrong expansion would turn a register text into an invented one.

Rendering of the tower crown above the clouds, Burj Binghatti Jacob & Co Residences

What can be said is arithmetic on the printed numerals: the text names 83 floors and five penthouses, and the other items carry their own counts. The marketing figures are different documents with different purposes, and the table sets them in one column so that the spread is visible. The rows follow the type of source, not the size of the figure, and no row is preferred.

Floors and height Printed figure Source and date
Register description 7B+G+5P+3HC+6MECH+83Floors+FM Floor+5 Penthouse +Roof Real Estate Club Dubai, 12 Nov 2026
Developer blog About 557 meters across 105 stories; 74 floors of residential flats, 28 floors as penthouses and 10 floors for commercial purposes Binghatti blog, 23 Jul 2025
Trade magazine Over 100 storeys; five penthouses at the top Gulf Construction, 1 Jul 2023
Sotheby’s journal A residential tower of more than 100 storeys; the journal says figures for final height and floor count vary slightly between references Sotheby’s journal, 27 May 2026
Sotheby’s project page 104-storey project Sotheby’s project page, 15 Nov 2026
Whitewill 98 floors Whitewill, 15 Nov 2026
DubaiHaus Rising over 112 storeys DubaiHaus, 15 Nov 2026
Tracker editorial text Roughly 557 metres across 104 floors plus seven basement levels, described there as the target Binghatti pitched Real Estate Club Dubai, 12 Nov 2026
Property Finder One building; no floor count Property Finder, 15 Nov 2026

Two pieces of arithmetic come out of this table. The blog’s three floor groups, 74 plus 28 plus 10, add to 112, while the same article says 105 stories. The difference is seven, which is also the number of the first item in the register text and of the basement levels in the tracker’s editorial. No page connects those sevens, so the guide records that the numbers coincide and draws nothing from it.

On penthouses, the register text says five, Gulf Construction says five at the top, and Property Finder lists two penthouse layouts, a five-bedroom Astronomia Sky and an eight-bedroom The Billionaire Sky. The blog’s 28 penthouse floors and the register’s five penthouses are different counts, so the word penthouse does not describe the same thing in both. The contract should say which floors and which units it means by it.

Unit counts Printed figure Source and date
Apartments in the register 671 Real Estate Club Dubai, 12 Nov 2026
Total and for sale 299 apartments in total, 88 for sale Whitewill, 15 Nov 2026
By bedroom count 184 two-bedroom, 416 three-bedroom, 24 four-bedroom; the five-bedroom Astronomia Sky Mansions and the six-bedroom Fleur de Jardin Sky Villa named separately Sotheby’s project page, 15 Nov 2026
Number in a sentence A sentence says the tower features 8 apartments while the same page lists four bedroom types; not adopted DubaiHaus, 15 Nov 2026
Property Finder resale count 37 resale properties available in this project Property Finder, 15 Nov 2026

The Sotheby’s counts add to 624 (184 plus 416 plus 24). The register’s 671 is 47 higher. Whitewill’s 299 less its 88 for sale leaves 211 that the page does not describe. No source says what the 47 or the 211 consist of, whether the named villas, sky mansions and penthouses, units held back, or units counted by another rule. The guide therefore prints each total with its source and leaves the total open.

The Property Finder count of 37 resale listings is a portal count of units offered by owners, not by the developer, and it carries no date other than the day it was read. It shows that units of this tower are advertised on the resale market. It does not show how many remain with the developer, and the guide does not say units are available or sold out.

The residences: names, bedrooms, sizes and bathrooms as printed

Sizes come from four places: Property Finder’s unit table, DubaiHaus’s property-type table, Whitewill’s smallest-area figure and the Sotheby’s project card. They are in square feet as printed, with metres calculated at 0.092903 square metres per square foot. They do not agree for the four-bedroom and six-bedroom types, and DubaiHaus’s own text and table differ with each other, so each figure is shown under its source and none is chosen.

Astronomia Sky Mansion Penthouse living area rendering with city-view windows
Residence type Bedrooms Size printed, sq ft, with source Calculated m² Bathrooms printed (Property Finder)
Apartment, 2 bedrooms 2 3,286 (Property Finder); 3,214 to 3,287 (DubaiHaus); 3,323 (Sotheby’s project card) 298.6 to 308.7 4
Apartment, 3 bedrooms 3 3,263 (Property Finder); 2,262 to 3,264 (DubaiHaus); 2,261 smallest area, printed as 210 m² (Whitewill) 210.1 to 303.2 5
Apartment, 5 bedrooms 5 11,796 (Property Finder) 1,095.9 8
Apartment, 6 bedrooms 6 6,899 and 6,914 (Property Finder); 4,229 in the table, 3,357 to 4,248 in the text (DubaiHaus) 640.9 to 642.3; 392.9 9
Emerald Villa, 2 bedrooms 2 3,337 (Property Finder) 310.0 5
Sapphire Villa, 2 bedrooms 2 3,335 (Property Finder) 309.8 not printed
Ruby Villa, 3 bedrooms 3 3,299 (Property Finder); 3,288 (listing snippet, per the data file) 306.5; 305.5 not printed
4 bedrooms (Sky Mansion on Property Finder) 4 6,976 (Property Finder); 3,357 to 4,248 (DubaiHaus, 4-bedroom row) 648.1; 311.9 to 394.7 not printed
Fleur de Jardin Sky Mansion 6 6,976 (Property Finder) 648.1 not printed
Astronomia Sky Mansion Penthouse 5 11,807 (Property Finder); nearly 12,000 (Sotheby’s project page) 1,096.9 not printed
The Billionaire Sky (penthouse) 8 22,469 (Property Finder) 2,087.4 not printed
Diamond Sky Mansion not printed No size found in the sources read not available not printed

Three points follow from the table. First, the developer’s own page gives no area for any residence, so every size comes from a third party. Second, Property Finder’s overview says the homes run from two to seven bedrooms while its table lists an eight-bedroom penthouse, and the developer’s tiles stop at six. Third, three recorded sales on Property Finder (section 6) show areas of 3,287, 2,261 and 5,619 sq ft, which match some sizes above and not others.

The smallest area, 2,261 sq ft or 210 m², appears twice: as Whitewill’s area-from figure and as the area of a three-bedroom sale record on Property Finder. The 3,263 sq ft of the same type on Property Finder’s table is a different size for the same label. The cause is not stated anywhere, and the contract’s floor plan with an area printed on it is the document that answers it for one unit.

What is listed inside Who prints it Source and date
Lobby, living areas, private bathroom, private pool (captions of renders) The developer’s project page, as captions only binghatti.com, 15 Nov 2026
Infinity swimming pool, butler, bodyguard and chauffeur service, concierge and lounge facilities, a daycare centre, a gymnasium, housekeeping, a lobby lounge and a spa and sauna The developer’s blog, as services the residents will enjoy Binghatti blog, 23 Jul 2025
Restaurants, infinity pool, well-being and fitness, health club, gymnasium, shared pool, shared spa, security, concierge, children’s play area Property Finder’s amenity list Property Finder, 15 Nov 2026
Concierge, chauffeur, four high-rise gardens, fitness centre, spa, lounge area, 24-hour security, chef service, daycare, infinity pool, restaurants and bars, cleaning services Whitewill’s services list Whitewill, 15 Nov 2026
Three swimming pools and resident spaces; private lift access into residences Sotheby’s journal Sotheby’s journal, 27 May 2026
A gym, a spa, a swimming pool and concierge, chauffeur and butler offerings Sotheby’s project page Sotheby’s project page, 15 Nov 2026

The lists overlap and differ. The developer’s blog is the one developer document read here that lists facilities by name, and it uses the future tense; the project page shows renders with captions. Whether any listed item is part of the purchase, a paid service or a facility run by an operator is not stated by any source, so each is a question for the contract and the owners’ association rules rather than a feature of the unit.

Prices and payment plans by source and date, in AED and USD

The developer prints one figure, AED 13,999,999 on the list card. Portals print lower starting figures, and one prints ranges by type. Property Finder carries the usual notice that prices, availability and purchase conditions may change frequently. The table shows each figure in dirhams as printed and in dollars as arithmetic at the pegged rate of 3.6725 per USD. No price per square foot is printed in this guide, because no source states one.

Ruby Villa living area rendering with Burj Khalifa view
Source and date Figure as printed AED USD at 3.6725
binghatti.com project list, 15 Nov 2026 Starting AED 13,999,999 for 2 BR, 3 BR and 4 BR; no type named 13,999,999 3,812,117
Property Finder, 15 Nov 2026 Launch price 9.8M AED; Starting Price 9800000 AED 9,800,000 2,668,482
Whitewill, 15 Nov 2026 Apartments from AED 8,400,000 (the page prints USD 2,290,000 beside it) 8,400,000 2,287,270
DubaiHaus, 15 Nov 2026 Starting price AED 8,400,000 8,400,000 2,287,270
Sotheby’s project page, 15 Nov 2026 Prices start at AED 8.2 million; two-bedroom apartment from 8,200,000 AED 8,200,000 2,232,811
Sotheby’s project page, 15 Nov 2026 Sky Mansions priced from AED 175 million 175,000,000 47,651,464
Search-result snippets, per the data file, checked 14 Nov 2026 AED 8,480,000 starting; 8.5M launch; 9.1M later; 9,200,000; pages not opened 8,480,000 to 9,200,000 2,309,054 to 2,505,106

The card figure of AED 13,999,999 lies inside the AED 13,200,000 to 17,029,999 range that DubaiHaus prints for three-bedroom apartments, but the card names no type, so that match is arithmetic only. The portal figures from AED 8,200,000 to AED 9,800,000 sit near the DubaiHaus two-bedroom range. They are listing-site indications, not Binghatti prices, and each carries the date the guide read it, since none prints its own.

DubaiHaus type row, read 15 Nov 2026 AED range as printed USD range at 3.6725
2-bedroom 8,400,000 to 9,200,000 2,287,270 to 2,505,106
3-bedroom 13,200,000 to 17,029,999 3,594,282 to 4,637,168
4-bedroom 16,000,000 to 18,200,000 4,356,705 to 4,955,752
6-bedroom 18,000,000 to 18,000,000 4,901,293
Sale record on Property Finder AED USD at 3.6725 Area, sq ft Date shown
2-bedroom apartment 10,020,000 2,728,387 3,287 6 Jul 2026
3-bedroom apartment 10,500,000 2,859,088 2,261 25 Jul 2026
6-bedroom apartment 18,000,000 4,901,293 5,619 7 Jul 2026

These three sale records are what Property Finder’s transaction panel lists for the project, read on 15 November 2026. The guide draws no conclusion from them. They show that sales of units in this tower are recorded, with the price, the area and the date, and they are the kind of dated record that can be compared with a seller’s price list. A resale record is a transaction between owners, not a developer price.

Payment plan What is printed Source and date
10/20/70 10 percent down payment at sales launch or booking, 20 percent during construction, 70 percent on handover Property Finder; DubaiHaus tile, 15 Nov 2026
30/70 and 70/20 labels The same DubaiHaus page carries a FAQ line reading 30/70, 10 percent on booking and 70 percent on handover, and a widget labelled 70/20 DubaiHaus, 15 Nov 2026
50/20/30 50 percent on booking, 20 percent during construction, 30 percent on handover Search snippet citing a guide and DubaiHaus, per the data file, checked 14 Nov 2026; page not opened
Resale-listing structures 80/20, 70/30, 20 percent down with 80 percent linked to construction milestones, and 35 percent on booking on one listing dubizzle.com search snippets, per the data file; listing pages not opened
Developer and register No plan printed binghatti.com; Real Estate Club Dubai, 15 Nov 2026

None of these plans is printed by the developer, and the guide chooses none. The table below applies a 10/20/70 split to three printed figures purely as arithmetic, so that the size of each instalment is visible. It is not a price list for any unit, and no source says that this plan applies to the figure beside it.

Printed total (illustration only) 10 percent 20 percent 70 percent 4 percent DLD fee in total
Developer card figure: AED 13,999,999 1,400,000 (USD 381,212) 2,800,000 (USD 762,423) 9,799,999 (USD 2,668,482) 560,000 (USD 152,485)
Property Finder figure: AED 9,800,000 980,000 (USD 266,848) 1,960,000 (USD 533,696) 6,860,000 (USD 1,867,937) 392,000 (USD 106,739)
Whitewill and DubaiHaus figure: AED 8,400,000 840,000 (USD 228,727) 1,680,000 (USD 457,454) 5,880,000 (USD 1,601,089) 336,000 (USD 91,491)

The last column is the sum of the seller’s 2 percent and the purchaser’s 2 percent that the DLD initial-sale page lists, before the two AED 10 fees on that page. Who bears each share is a term of the contract, as section 8 sets out. Amounts here are rounded to the nearest dirham and to the nearest dollar, and they move with any change in the figure the seller prices the unit at.

Location of Burj Binghatti Jacob and Co Residences Dubai in Business Bay

Business Bay lies immediately south of Downtown Dubai along an extension of Dubai Creek, according to the Wikipedia article on the district, which also says the district’s metro station on the Red Line opened on 15 October 2010. The Dubai Water Canal starts in Business Bay and runs 3.2 km to the sea through Safa Park and Jumeirah, per the article on the canal, which dates its opening to 9 November 2016.

Diamond Sky Mansion living area rendering with bar and chandelier

No source gives the tower’s plot number or street. Property Finder says it is next to SLS Dubai Hotel & Residences, and the tracker’s editorial text puts it on the Dubai Water Canal in Business Bay. The Sotheby’s project page says it is on the edge of Business Bay with Financial Centre Street giving access to Downtown Dubai and the E44 highway at its doorstep. Those are statements by three sources. The plot should be read from the contract and the DLD record.

Because the plot is not printed, the straight-line figures in the table are measured from one stated neighbour, the SLS Dubai Hotel & Residences point in OpenStreetMap, and not from the tower itself. They are an orientation, to be replaced by the plot’s own coordinates. The printed travel times come from Property Finder and Whitewill, carry no date, and in Whitewill’s case do not say whether they are by car or on foot.

Burj Binghatti Jacob and Co Residences Dubai: place Printed travel time Straight line from the SLS Dubai point (calculated) Source of the point
Burj Khalifa 8 min (Property Finder); 12 min (Whitewill) 2.3 km OpenStreetMap way 446646206
The Dubai Mall 9 min (Property Finder); 8 min (Whitewill) 1.9 km OpenStreetMap relation 18195959
Downtown Dubai 10 min (Property Finder) not measured –
Dubai International Airport 15 min (Property Finder); 15 min (Whitewill) 10.6 km OpenStreetMap way 1429712446
Dubai Marina 15 min (Property Finder) not measured –
Al Maktoum airport (DWC) 35 min (Property Finder) not measured –
Safa Park not printed 4.8 km OpenStreetMap way 495449950
Sheikh Zayed Highway 15 min (Whitewill) not measured –
Burj Park 7 min (Whitewill) not measured –
Jumeirah Beach 15 min (Whitewill) not measured –
Ras Al Khor Wildlife Sanctuary 15 min (Whitewill) not measured –
Dubai Water Canal Waterfront 3 min (Whitewill; mode not labelled) not measured –

The anchor for the straight-line column is the OpenStreetMap record of the SLS Dubai Hotel & Residences, and each distance is a great-circle distance between map points, calculated on 15 November 2026. A road or walking route is longer. The Binghatti press release of 12 November 2026 says the Dubai Metro Blue Line, due to open in 2029, and the Gold Line, due in 2032, will run through communities that include Business Bay; that is the developer’s statement about public works, not a fact about this plot.

What the printed times and the measured lines agree on is the broad picture: the tower is described as minutes from the Burj Khalifa and The Dubai Mall and about a quarter of an hour from the airport. They do not show where the entrance is, how the road network serves the site, or how the construction works affect access, and the contract and a visit to the plot give those answers.

Buying off-plan in Dubai: freehold areas, the 4 percent registration fee, Oqood, escrow and the Golden Visa rule

Dubai sets the rules for an off-plan purchase through its land department and its own laws, and the official pages are the reference. The table states what those pages and law texts say, as read on 15 November 2026, with the source on each row. Nothing in it says that a rule applies to a particular unit of this tower. That is checked with the authority named on the row, and figures in older guides, including this site’s, are not repeated.

Sapphire Villa private infinity pool and lounge rendering
Topic What the official text says Official source
Freehold areas Foreign ownership is permitted in areas designated as freehold, where foreigners, resident or not, may acquire freehold ownership, usufruct, or a lease of up to 99 years; Article 3 of Regulation No. 3 of 2006 lists the designated plots UAE government portal, updated 2 Nov 2026
Freehold per the DLD The property-status service says freehold purchase is allowed for all nationalities and non-freehold purchase for GCC nationals Dubai Land Department, property status
Registering an off-plan sale A developer registers units sold off-plan in the provisional register through the Oqood portal; the sale and purchase contract is registered within 90 days of signing; the output is a provisional registration e-certificate Dubai Land Department, initial sale service
Fees on that service Seller 2 percent and purchaser 2 percent of the sale value, plus AED 10 knowledge fee and AED 10 innovation fee; the 4 percent total is the sum of the two shares Dubai Land Department, initial sale service
Interim register Every disposition of an off-plan unit is entered in the Interim Property Register, and a sale or restriction of ownership is void unless entered (Article 3) Law No. 13 of 2008, English text
Approved projects only A developer may not dispose of units off-plan before taking possession of the land and obtaining the required approvals (Article 4); a private contract for an unapproved project is null and void (Article 10) Law No. 13 of 2008, English text
Area of a sold unit The area of a sold unit is deemed correct; the developer may not claim more for a larger area, and must compensate a purchaser for a smaller one unless the shortfall is inconsequential (Article 12) Law No. 13 of 2008, English text
Purchaser default After a 30-day notice from the Department, the developer may cancel and refund after deducting up to 30 percent of the payments made (Article 11) Law No. 13 of 2008, English text
Escrow account Purchasers’ payments for off-plan units go into an account with an accredited escrow agent in the name of the project, dedicated exclusively to its construction, not attachable by the developer’s creditors, one account per project (Articles 7 and 9) Law No. 8 of 2007, English text
Access and retention Depositors may see their own accounting records (Article 12); the escrow agent retains 5 percent of the account value once the completion certificate is issued, released one year after units are registered in purchasers’ names (Article 14) Law No. 8 of 2007, English text
Project search The Project Status Enquiry service, reached through the Dubai REST app, shows project status and details Dubai Land Department, project status
Rules and circulars The DLD lists its regulations and circulars, including one on compliance with Law No. 8 of 2007; the files were not read for this guide Dubai Land Department, rules and regulations
Title deed A title deed can be verified by number and year Dubai Land Department, verify title deed
Service charges Annual charges approved by RERA for managing and maintaining jointly owned property, calculated by area and checkable in the Service Charge Index; paid into accounts approved by RERA through the Mollak system Dubai Land Department, frequently asked questions; Service Charge Index
Golden visa, UAE portal Real-estate route: 5 years; minimum capital of AED 2 million with property ownership, or a contribution to an establishment paying at least AED 250,000 annually in taxes UAE government portal, updated 28 Jul 2026
Golden visa, DLD service Property worth AED 2 million or more at purchase, wholly owned in the applicant’s name; a mortgaged property needs a bank letter showing the paid amount; the page describes a 10-year renewable permit Dubai Land Department, Golden Visa service
Housing fee Tenants pay Dubai Municipality a housing fee of 5 percent of the yearly rent, added to the electricity and water bills UAE government portal, updated 27 Oct 2026
Tax on individuals The UAE does not levy income tax on individuals UAE government portal, taxation

Four of these topics meet the facts about this tower directly. On tenure, Property Finder prints Freehold and the developer prints nothing, so the area’s status is read in the DLD property-status service. This site’s guides on freehold and leasehold in Dubai and on foreigners buying apartments in Dubai explain the terms, and for a foreigner the general rule is the freehold-area rule above.

On registration and escrow, the tracker relays project number 2480 from the register and calls the percentage escrow-audited without naming a bank. The sale contract should print the project number, the escrow bank and the account name, each checkable in the Project Status Enquiry before any payment. The guide to buying off-plan in Dubai sets out the stages in plain language, and this page restates no rule beyond the table.

On running costs, no developer page and no portal read gives a service-charge figure for this tower, so none appears here. The DLD says the charge is approved by RERA and can be calculated from the index, and the seller can state the estimate in writing. For the annual-tax position, the guide on property tax in Dubai carries its own sources, and no rate is quoted on this page. The guide to mortgages in Dubai for foreigners covers loans.

As to residence, AED 2,000,000 converts to about USD 544,588 at the pegged rate. Every price figure printed for this tower in section 6 is above that threshold. That is arithmetic and not a finding of eligibility: the UAE portal and the DLD service describe different permit lengths, 5 and 10 years, both are kept, and no claim is made that any unit qualifies. The authority assesses each case, and the Dubai Golden Visa explainer covers the process.

What to ask for in writing before reserving

Because the developer’s page, the register and the portals print different things for this tower, the useful step is to ask the seller for each missing item on paper before any payment. The list follows the gaps in the tables above, in the order a buyer usually meets them.

Bedroom rendering with quilted bed and balcony view of Burj Khalifa
  1. The sale and purchase agreement with the exact unit number, floor, residence type and area in sq ft and m², and how the area is measured, since three-bedroom areas of 2,261 and 3,263 sq ft both appear.
  2. The handover date written into the contract, what counts as handover, and the register’s completion percentage on the day of signing.
  3. The full payment schedule for that unit, with each instalment, its date or construction trigger, and the plan the percentages follow (10/20/70 and others appear on portals).
  4. Written confirmation that the specific unit is unsold and unreserved on the day of signing, because the developer card prints Starting AED 13,999,999, Whitewill lists 88 of 299 for sale and Property Finder lists 37 resale units.
  5. The name of the escrow bank and of the account, with its number, and a statement that all instalments are paid into that account alone.
  6. The DLD project number (2480 per the register as relayed) and the plot or sub-community name, checked in the DLD project and property-status services.
  7. The contracting entity: its full legal name and licence, which the register gives as Binghatti Developers Fze, and the authority of the person signing for it.
  8. Who pays the DLD registration shares and any Oqood and administrative fees, and when each falls due.
  9. The service-charge estimate for the unit from the RERA-approved index, the management company, and what the charge covers, including any listed services such as concierge or spa.
  10. The written specification of the finish, kitchen appliances, lighting and any furnishing included, since the sources list a designer finish without detail.
  11. What the contract means by villa, sky mansion and penthouse, and which floors the unit sits on, given the blog’s 28 penthouse floors and the register’s five penthouses.
  12. The unit’s floor plan with the area printed on it, because the developer’s page shows no areas.
  13. The title-deed process and timing after completion, and the name of the bank if a mortgage is used.
  14. Whether the contract refers to the partner’s name and, if it does, the terms that apply to the unit owner.

Each item can be checked against an official or primary document, and the table says where. An answer that exists only in a brochure, an advert or a chat message should be matched with the contract wording before it is relied on.

What to check Where What it shows
Project number, completion percentage, escrow bank, management company DLD Project Status Enquiry (Dubai REST app) The register entry for the building
Plot status and freehold designation DLD property-status service Whether the area is freehold for all nationalities
Title deed after completion DLD title-deed verification Whether a deed is valid and matches the owner
Service charge approved for a project DLD Service Charge Index The RERA-approved charge to multiply by the unit area
Broker licence and permits DLD home page (Verify License and Permits) Whether a broker and an advertisement are registered
Escrow and interim-register law text Law No. 8 of 2007; Law No. 13 of 2008 What the law requires of the developer and of the account

How Burj Binghatti Jacob and Co Residences Dubai sits among the other Binghatti projects and nearby Business Bay listings

The Binghatti project list prints a community, a starting figure and the unit types for each building. The table shows the cards of five other Binghatti projects filed under Business Bay and one co-branded project filed under Burj Khalifa, as read on the project list on 15 November 2026, with the dollar figure calculated at 3.6725. The project names are links to the matching guides on this site. They are separate projects, and no sentence in one guide is repeated for another.

Astronomia Sky Mansion Penthouse dining room rendering with skyline view
Binghatti project Community on the card Starting figure on the card USD at 3.6725 Unit types on the card
Burj Binghatti Jacob and Co Residences Dubai (this guide) Business Bay Starting AED 13,999,999 about USD 3,812,117 2 BR, 3 BR, 4 BR
Binghatti Aquarise Business Bay Starting AED 999,999 about USD 272,294 Studio, 1 BR, 2 BR, 3 BR, 4 BR
Binghatti Skyhall Business Bay Starting AED 985,000 about USD 268,210 Studio, 1 BR
Binghatti Skyrise Business Bay Starting AED 1,050,000 about USD 285,909 Studio, 1 BR, 2 BR, 3 BR
One by Binghatti Business Bay Starting AED 2,000,000 about USD 544,588 Studio, 1 BR, 2 BR, 3 BR, 4 BR
Bugatti Residences by Binghatti Business Bay Starting AED 36,600,000 about USD 9,965,963 3 BR, 4 BR, 5 BR, Penthouse
Mercedes-Benz Places | Binghatti Burj Khalifa Starting AED 11,299,999 about USD 3,076,923 2 BR, 3 BR, 4 BR

Among these cards the printed starting figures run from AED 985,000 to AED 36,600,000, so the tower in this guide sits between the two other co-branded cards in the table. The cards do not say which unit type each figure belongs to, and the unit types differ, so the numbers are not like for like. Bugatti Residences by Binghatti is read on the card as printed, and its own site is the reference for it.

Other listings on this site in Business Bay, each a separate building with its own developer, are in the table. The descriptions are taken from the listing pages’ own summaries as read on 15 November 2026, and none implies a comparison of quality. For the wider set of Binghatti buildings, the page on Dubai developers lists the developer profiles on this site, and Dubai and the UAE list every listing.

Listing in Business Bay on this site Developer What the listing page says
The Quayside by Ellington Ellington Properties 118 units, studios to 3-bedroom apartments and a 5-bedroom penthouse, with Dubai Water Canal access
The Crestmark by Ellington Ellington Facts, costs and status with a worked cost example, checked 28 October 2026
Bayz by Danube Danube Properties A completed tower with 463 apartments
Bayz 102 by Danube Danube Properties A 102-level tower with 956 apartments, per the developer
DAMAC Canal Heights 2 de GRISOGONO DAMAC What the developer, Property Finder and 2023 press print on handover, storeys, price and payment

Buyers who compare these buildings should compare the same items: the status in the DLD register, the escrow arrangement, the handover date in the contract, and the area printed on the floor plan. The market-wide figures in the Dubai real estate market guide are older than this page and are not repeated here, which is why no market statistic appears in this profile.

Binghatti Developers (developer)

The company presents itself as Binghatti and Binghatti Developers, and its press releases are issued in the name of Binghatti Holding Limited. According to the About page, Dr. Hussain Binghatti started the business in 2008 and named it after his late father, Ghatti Bin Ghaeb; the same page names a founder, a chairman, a vice-chairman and a chief executive officer. The footer address is Sheikh Zayed Road, Dubai.

A press release dated 12 November 2026 calls the group a vertically integrated developer, established in 2008, that keeps design, development, construction and delivery in house. The release states a portfolio above 100 projects and above AED 100 billion in value, and nearly 60 completed developments. For 2026 it names five completions, Binghatti Apex, Ghost, Ivory, Haven and Grove, covering about 2,600 units.

Other Binghatti documents word the portfolio differently, and a brochure speaks of more than 50 delivered projects, per the data file; the figures are therefore tied to the date of the release. The developer’s site menu lists brand pages for Bugatti Residences, Mercedes-Benz Places Binghatti City, Mercedes-Benz and Jacob & Co, as printed. Every figure in this section is the company’s own, and none has been audited here.

Frequently asked questions

Where is Burj Binghatti Jacob and Co Residences Dubai?

The developer’s list card and project page say Business Bay. No source read prints the plot number or the sub-community. Property Finder says the tower is next to SLS Dubai Hotel & Residences, and the tracker’s editorial text puts it on the Dubai Water Canal. The plot is read from the contract and the DLD record.

What does Burj Binghatti Jacob and Co Residences Dubai cost?

The developer’s list card prints Starting AED 13,999,999, about USD 3,812,117 at 3.6725, with no unit type. Portals print AED 9,800,000 (Property Finder), AED 8,400,000 (Whitewill, DubaiHaus) and AED 8.2 million (Sotheby’s). The seller’s dated price list for the chosen unit is the document that settles it.

When is handover?

The developer prints no date. The register estimate recorded June 2026, the developer’s blog of 23 July 2025 said June 2026, Property Finder and DubaiHaus say June 2027, and Sotheby’s gives 2026 to 2027. The date written into the sale contract is the one that matters to a buyer.

How far along is construction?

The tracker, citing the DLD registry, shows 52 percent from 3 September 2026, up from 35 percent in the readings of 13 June to 31 August 2026, last verified on 12 November 2026. A Binayah page prints 2.74 percent with no date. The register’s project record is the place to check the current figure.

How many floors and units are there?

Floors range from 98 to over 112 across sources, and the register text names 83 floors and five penthouses. Units are 671 in the register, 299 with 88 for sale on Whitewill, and 624 when Sotheby’s two-, three- and four-bedroom counts are added. Each is shown with its source in section 4, and none is chosen.

Is Burj Binghatti Jacob and Co Residences Dubai freehold?

Property Finder prints Freehold. The developer page prints nothing on tenure. Dubai allows foreign freehold ownership in designated areas, and the DLD property-status service states which areas, so the status of this plot is confirmed there and in the contract.

Are units still available?

The developer’s card prints a starting price, Whitewill lists 88 of 299 units for sale and Property Finder lists 37 resale units. None of these settles the position of one unit. Only a written statement that the exact unit is unsold and unreserved on the day of signing answers it for one unit.

Which payment plan applies?

The developer prints none. Property Finder and DubaiHaus print 10/20/70, DubaiHaus also shows 30/70 and 70/20 labels, and resale listings show other splits. The schedule in the unit’s contract is what the parties sign, and it should name each instalment and its trigger.

Does Burj Binghatti Jacob and Co Residences Dubai qualify for the Golden Visa?

No claim is made. The rule on the UAE portal is a real-estate route with a minimum capital of AED 2 million, and the DLD service speaks of property worth AED 2 million or more. Every price printed for this tower is above that figure, and the authority decides each application.

What is the partner’s role?

The developer prints the name Burj Binghatti Jacob & Co Residences and calls the project a collaboration of Binghatti and Jacob & Co. This guide states that and nothing more. Any licence, branding or service terms are for the contract and the partner’s own documents.

Sources and last check

Last checked: 15 November 2026. Sources:

This is not legal, tax or financial advice.

  • City Dubai
  • Country UAE

Features

  • Gym
  • Sauna
  • Swimming Pool

Contact Information

Zhamal Abdykozhoeva
  • Zhamal Abdykozhoeva

Enquire About This Property

Property Inquiry

"*" indicates required fields

Name*
Please let us know what's on your mind. Have a question for us? Ask away.

Compare listings

Compare
Zhamal Abdykozhoeva
  • Zhamal Abdykozhoeva
Oman flag
HEADQUARTERS MUSCAT