Azizi Rose Dubai is a studio and one-bedroom project in Downtown Jebel Ali, a community at the western end of Dubai, and the developer’s own page prints no price, no handover date and no construction percentage for it, while four property portals print a launch price of AED 607,000 (about USD 165,283, at the pegged rate of 3.6725) and handover dates between 31 May 2028 and the third quarter of 2028.

This guide to Azizi Rose Dubai sets the developer’s page, A1 Properties, FAM Properties, Dubizzle (which cites Dubai Land Department data) and Bayut side by side, each figure with its source and the date it was read, which is 13 November 2026. Where they differ, the difference is shown and no figure is chosen over another.
It then adds what a buyer can calculate from the printed numbers, the rules that govern an off-plan purchase in Dubai as the official pages state them, and a list of what to ask for in writing before reserving.
The developer’s project page, read in the data pass of 13 November 2026, describes Azizi Rose Dubai as a project of studios and one-bedroom apartments in Downtown Jebel Ali. Its text speaks of a community where global companies sit on trade routes between Asia and Europe, of Sheikh Zayed Road and the metro as “in close proximity”, and of Jebel Ali Free Zone (JAFZA) as being on the doorstep.

A plain request to the developer’s site on the day of writing returned a rate-limit response (HTTP 429), so the developer’s own statements in this guide come from that pass and keep its date.
The page’s embedded data carries a project type label of Studio and 1 Bedroom, but no price, no status, no handover date and no construction percentage. The brochure, floor-plan and fact-sheet links in the same data are empty, and the page offers a register-your-interest route instead. The project does not appear on the developer’s construction-updates page, as the scope pass of the same day recorded.
These are statements about what the page prints, not judgements about the project. They explain why the tables below lean on portals for status, price and dates, and why every portal figure is labelled with the portal’s name. A reader who wants one number for the handover or the floor count will not find one here, because the sources do not agree and none of them is the contract.
The key facts below are the starting point. Each row says who prints the figure, so that a row with several values can be read as a list of what has been published and not as a finding.
| Azizi Rose Dubai key facts | As published | Source and date |
|---|---|---|
| Developer | Azizi Developments (Azizi) | Developer project page, data pass 13 Nov 2026 |
| Project type label | Studio and 1 Bedroom | Developer page, 13 Nov 2026 |
| Community | Jebel Ali; page text refers to Downtown Jebel Ali | Developer page, 13 Nov 2026 |
| Registry zone name | Jabal Ali Industrial Second | A1 Properties and Dubizzle (Dubai Land Department data), 13 Nov 2026 |
| Status | Developer: none printed. Bayut: Under Construction. A1: Off Plan, registry-derived record active. Dubizzle citing the Land Department: Active, last inspected February 2026 | Each source, 13 Nov 2026 |
| Handover | Developer: none printed. FAM: 31 May 2028. A1, Bayut and the Dubizzle listing: Q3 2028. Dubizzle project section: July 2028 | Each source, 13 Nov 2026 |
| Price | Developer: none printed. Bayut and A1: from AED 607,000 (about USD 165,283) | Bayut (data pass) and A1, 13 Nov 2026 |
| Payment plan | 10 percent down, 40 percent during construction, 50 percent on handover (A1; Bayut per data pass); 50/50 (Dubizzle) | Each source, 13 Nov 2026 |
| Registered units | 226 (A1); the developer prints no unit count | A1, 13 Nov 2026 |
| Tenure | Freehold (Dubizzle listing); the developer page also describes the offer as freehold | Dubizzle, 13 Nov 2026; developer page |
| Facilities | Adult and children’s pools, separate gyms, private cinema, children’s play area, multipurpose hall, parking | Developer page, 13 Nov 2026 |
| Images | 10 renders; no plans or maps in the gallery | Developer page, 13 Nov 2026 |
The rest of the guide follows the order in which a buyer usually asks questions: what the sources say about status and dates, what the building is, what it costs on paper, where it stands, what Dubai law and the official pages say about an off-plan purchase, and what to obtain in writing.
Five places say something about where the project stands. The developer’s page prints nothing on status in its visible text, and the portals draw on their own feeds and on registry records. The first table covers status and launch; the second covers handover.

| Source | Status as printed | Launch as printed | Date of the source |
|---|---|---|---|
| Developer page | No status label; a flag for a new release is false; no construction percentage | A listing launch field of 2026-01-06 in the page’s embedded data (not visible text) | Data pass, 13 Nov 2026 |
| Bayut project page | Under Construction | Launch price AED 607,000 | Data pass, 13 Nov 2026; a plain request today met a security check |
| A1 Properties | Off Plan; registry-derived record shows 226 registered units and the project as active | Launch-price sources vary between AED 607,000 and AED 619,000 | Re-read 13 Nov 2026 |
| Dubizzle listing | Off-plan; project status Active, last inspected February 2026, source named as the Dubai Land Department | Listing posted 16 Sep 2026; page updated 11 Nov 2026; launch price AED 607,000 | Re-read 13 Nov 2026 |
| FAM Properties | Off-plan | Launched 1 May 2026 | Re-read 13 Nov 2026 |
The two launch dates, 6 January 2026 in the developer’s data field and 1 May 2026 on FAM, are about four months apart. No source says what the date refers to. A first release to brokers, the opening of sales and a registry entry are different events, and each could carry a different date. The guide therefore records both as printed and draws no conclusion.
| Source | Handover as printed | Note |
|---|---|---|
| Developer page | Not printed | No handover field in the page data |
| Bayut project page | Q3 2028 | An earlier scope-pass note of the same day recorded Q1 2028 on a Bayut page; the data pass read Q3 2028 |
| A1 Properties | Q3 2028 | Printed in the key-facts strip of the project page |
| FAM Properties | 31 May 2028 | Printed as the handover and repeated in its FAQ answer on completion |
| Dubizzle, project section | July 2028 | Under the heading naming the Land Department as the source |
| Dubizzle, listing section | Q3 2028 | Same page, listing fields |
Read together, the printed handovers run from 31 May 2028 to the end of the third quarter of 2028. From 31 May to 30 September is 122 days, calculated, so the widest spread among the sources is about four months. A quarter label such as Q3 2028 covers July, August and September, which means that the Q3 entries and the July entry on Dubizzle do not necessarily disagree. FAM’s 31 May 2028 falls in the second quarter and is the earliest figure.
None of these is a commitment. The date that binds the developer is the handover date written into the sale and purchase agreement, together with the definition of handover and the consequence if it is not met. For that reason the handover date in the contract is among the first items in the list in section 9. The Land Department’s “last inspected” entry is a registry record of an inspection and is not a statement about the date of completion.
The building is where the sources differ most, and it makes a useful exercise in reading registry-derived descriptions. The developer’s page prints no floor count and no unit count. Three other sources print numbers, and they are not the same kind of number: one lists levels from a registry record, one lists a storey count, and one prints a building summary that names the Land Department as its source.
| Building descriptor | A1 Properties (registry-derived) | Dubizzle (Land Department data) | Bayut project page | FAM Properties |
|---|---|---|---|---|
| Floors or levels | Four basements, ground floor, three podium levels, eight upper floors and roof | 17 floors | 14-storey residential building with ground-floor retail | Mid-rise residential tower, no count |
| Registered units | 226 registered units | Not printed | Not printed | Not printed |
| Uses | Commercial and residential components; ground-level retail | 7 retail centres | Ground-floor retail | Not printed |
| Lifts | Not printed | 4 elevators | Not printed | Not printed |
| Parking | Not printed | 239 parking spaces | Not printed | Covered parking listed |
| Building area | Not printed | 357,095 sq ft (basis not stated) | Not printed | Not printed |
| Swimming pools | Adult and children’s pools | 1 swimming pool | Not printed | Shared pool and children’s pool listed |
Dubizzle’s floor figure of 17 and A1’s breakdown can be compared by simple counting. A1’s list has four basements, one ground floor, three podium levels and eight upper floors, which adds up to 16 levels, or 17 if the roof is counted as a level. Without the basements and the roof the count above ground is 12. None of these totals is 14, the storey count on Bayut.
The arithmetic is shown for the reader and is not a finding. No source says that Dubizzle’s 17 counts basements and roof, and no source explains the 14. A buyer who needs the storey count for a view, a floor choice or a comparison asks for the building permit drawings and the floor-by-floor unit schedule, both of which are on the list in section 9.
| Level count from A1’s breakdown | Levels | Calculation |
|---|---|---|
| Basements | 4 | As printed |
| Ground floor | 1 | As printed |
| Podium levels | 3 | As printed |
| Upper floors | 8 | As printed |
| Sum without roof | 16 | 4 + 1 + 3 + 8 |
| Sum with roof | 17 | 16 + 1 |
| Above ground without roof | 12 | 1 + 3 + 8 |
| Above ground with roof | 13 | 12 + 1 |
The unit count has one source only. A1 prints 226 registered units and says they include commercial and residential components, and Dubizzle’s record names seven retail centres. Neither source states how many of the 226 are apartments, so this guide gives no residential unit count and no studio-to-one-bedroom split. The developer’s type label for the project is Studio and 1 Bedroom, and the portals show retail at ground level; whether retail units are offered for sale to buyers is not printed anywhere read.
The developer’s page lists the facilities in plain terms. Portals add items from their own sources, and a few of those items conflict. The table keeps the developer’s list in the first column and marks what only a portal prints.
| Facility | Developer page | Portals | Open point |
|---|---|---|---|
| Swimming pools | One adult pool and one children’s pool | A1: adult and children’s pools. Dubizzle (Land Department record): 1 swimming pool. FAM: shared pool and children’s pool | Number and location of pools |
| Gyms | Separate gyms for men and women | A1: separate gyms. FAM: gym | Size and opening hours |
| Cinema | Private cinema | A1: private cinema | Whether bookable and any fee |
| Children’s play area | Children’s play area | A1: indoor children’s play area | Indoor or outdoor |
| Multipurpose hall | Multipurpose hall for indoor entertainment | A1: multipurpose facilities | Access rules |
| Gaming lounge | Not printed | A1 only | Not confirmed by the developer |
| Parking | Ample parking | Dubizzle: 239 spaces. FAM: covered parking | Spaces per unit and any fee |
| Security and CCTV | Not printed | FAM: 24/7 security and CCTV. Dubizzle: CCTV security | Not confirmed by the developer |
| Central cooling | Not printed | FAM and Dubizzle list central A/C | Cooling charges, if any |
Pools, lifts, parking areas and gardens are the items that carry running cost. Dubai’s Law No. 27 of 2007 on jointly owned real property treats structural parts, parking areas, recreational facilities, swimming pools and gardens as common areas unless the site plan says otherwise (Article 7), and each unit owner pays a share of the annual service fees calculated from the unit’s area against the total area (Article 22), as the Land Department legislation compendium prints them.
The developer’s page publishes no service-fee estimate. The Land Department’s FAQ defines a service charge as the annual charge approved by the Real Estate Regulatory Agency to cover the management, operation, maintenance and repair of the jointly owned property, paid into accounts that the agency approves. A buyer asks for the estimate per unit and the name of the management company before reserving.
The developer prints no price for Azizi Rose Dubai, so every figure in this section is a portal figure. They are of four different kinds: a launch or starting price, a registered sale, an asking price for a studio, and an asking price for a one-bedroom. The kinds are not interchangeable, and the table labels each one.

Dirham figures are as printed; the dollar column is calculated at the pegged rate of 3.6725 dirhams per dollar (USD), which the Central Bank of the UAE’s exchange-rate table for September 2026 prints for USD.
| Azizi Rose Dubai price indication | AED as printed | USD, calculated | Source and date |
|---|---|---|---|
| Developer page | Not printed | – | Data pass, 13 Nov 2026 |
| Launch or starting price | 607,000 | 165,283 | Bayut (“Launch price”, data pass) and A1 (“Starting from”), 13 Nov 2026 |
| Upper end of A1’s launch-price range | 619,000 | 168,550 | A1: records show 607,000 to 619,000, 13 Nov 2026 |
| Registered studio sale of about 338 sq ft | 624,000 | 169,912 | A1: sale dated 21 Aug 2026, read 13 Nov 2026 |
| Five studio listings, lowest | 624,000 | 169,912 | Bayut listings, data pass 13 Nov 2026 |
| Five studio listings, highest | 695,000 | 189,244 | Bayut listings, data pass 13 Nov 2026 |
| One-bedroom “from” price | 924,000 | 251,600 | Bayut project page, data pass 13 Nov 2026 |
| One-bedroom listing, 838 sq ft, unfurnished | 1,297,000 | 353,165 | Dubizzle, posted 16 Sep 2026, updated 11 Nov 2026 |
Three points help in reading the table. First, a launch price is a minimum that applies to a particular unit type. A1 prints it for the project without naming a unit type, and the Bayut studio page prints it as the launch price, so the data pass treats it as the studio figure. Second, the registered sale on A1 and the studio listings on Bayut are close to each other in value, and a listing is an asking price that can change without notice.
Third, the one-bedroom figures differ by AED 373,000, calculated as 1,297,000 minus 924,000. They are not the same product: one is a project-level “from” price and the other is a single listing of an 838 sq ft unit whose floor, view and balcony are particular to it. A1’s own page says buyers acquiring assignments should verify the seller’s paid percentage and the outstanding developer balance, which is a reminder that a listing price and the amount still owed to the developer are separate numbers.
The developer, as the data pass found, also prints no per-unit price list and no sizes. Sizes therefore come from portal records and listings. They are given in square feet as printed, with a metric figure calculated at 0.092903 square metres per square foot.
| Unit type | Size seen, sq ft | Metric, calculated, m² | Where it is printed |
|---|---|---|---|
| Studio | 338 | 31.4 | A1: studio sale of 21 Aug 2026 |
| Studio | 352 | 32.7 | Bayut listing, data pass |
| Studio | 388 | 36.0 | Bayut listing, data pass |
| Studio | 438 | 40.7 | Bayut listing, data pass |
| One bedroom | 838 | 77.9 | Dubizzle listing: 2 bathrooms, unfurnished |
| Balcony of that one-bedroom | 172 | 16.0 | Dubizzle listing |
The studio sizes seen run from 338 to 438 sq ft, a spread of 100 sq ft, and the single one-bedroom size is 838 sq ft. Five studio listings on Bayut cannot show the full range of layouts in the project, and one one-bedroom listing cannot show the range for that type.
The count of layouts, the net area of each and the plan of each are on the list of written requests, because Dubai’s rules take the net area as the basis for registration and the contract is the document that fixes it.
Resolution No. 6 of 2010, which implements the law on the interim property register, provides that the net area of a unit is the area registered, that the developer may not claim the value of an area above the net area, and that the developer indemnifies the purchaser if the unit is smaller than agreed by more than 5 percent of the net area (Article 13).
A unit that is listed in square feet on a portal is therefore compared with the net area in the contract before any price is accepted. The source is the Land Department compendium, dated 2014, so the current text of the article is checked before reliance.
The developer’s type label covers studios and one-bedroom apartments only. A1 describes the residential collection in the same terms, and Bayut and Dubizzle list studio and one-bedroom units. No source read lists a two-bedroom unit, and none lists a size or a count for any type. The Dubizzle listing shows two bathrooms for its one-bedroom unit, and no source prints a bathroom count for the project.
The payment plan is printed by portals only. The developer’s page prints none. The sources agree that the plan has two halves, and they differ on whether the first half is split.

| Source | Payment plan as printed |
|---|---|
| Developer page | Not printed |
| A1 Properties | 50/50, and in its payment-plan block 10% down payment, 40% during construction, 50% on handover |
| Bayut project page (data pass) | 50/50 with 10% down, 40% before handover and 50% on handover |
| Dubizzle listing | 50/50 (no split of the first half) |
| FAM Properties | Not printed |
The sources therefore agree on 50 percent at handover and on 10 percent as the first payment, and the 40 percent in between is described as being paid during construction. No source prints the dates or the number of instalments that make up the 40 percent, and none prints the milestone that triggers them. That schedule is the part of the plan that determines cash flow, so it is the part to obtain in writing.
The table applies the plan to two printed prices, the launch or starting price of AED 607,000 and the one-bedroom “from” price of AED 924,000. The amounts are calculated from the percentages and are not quotations. Dollar figures use the peg of 3.6725 and are rounded to the nearest dollar.
| Instalment (calculated) | On AED 607,000 | USD | On AED 924,000 | USD |
|---|---|---|---|---|
| 10 percent: down payment | 60,700 | 16,528 | 92,400 | 25,160 |
| 40 percent: during construction | 242,800 | 66,113 | 369,600 | 100,640 |
| 50 percent: on handover | 303,500 | 82,641 | 462,000 | 125,800 |
| Total | 607,000 | 165,283 | 924,000 | 251,600 |
A plan in which half the price is due on handover has one practical consequence for a buyer who borrows: the second half is the amount a lender would be asked to fund at completion, and the lender’s own conditions then apply. The mortgage guide on this site, mortgage in Dubai for foreigners, is the place for loan questions. This page states no loan terms.
The Land Department’s fee table, issued as Executive Council Resolution No. 30 of 2013 and printed in the legislation compendium, sets the registration of a real property sale contract at 4 percent of the value of the contract. The Department’s service page for registering an initial sale describes the same 4 percent as two shares: 2 percent of the sale value for the seller and 2 percent for the purchaser, plus a knowledge fee of AED 10 and an innovation fee of AED 10.
Resolution No. 6 of 2010 adds that, unless otherwise agreed, the developer and the purchaser pay the registration fee in their respective percentages (Article 9). Who pays what is therefore a matter for the contract, and the table shows both readings.
| Fee on the printed price | Rule as published | On AED 607,000 | On AED 924,000 | Source |
|---|---|---|---|---|
| Registration of the sale contract, total | 4% of the value of the contract | AED 24,280 (USD 6,611) | AED 36,960 (USD 10,064) | Resolution No. 30 of 2013, fee table |
| Purchaser share on the service page | 2% plus AED 10 plus AED 10 | AED 12,160 (USD 3,311) | AED 18,500 (USD 5,037) | Land Department service page |
| Time limit for registering the contract | Within 90 days of signing | – | – | Land Department service page |
| Developer administration charge | Not printed | – | – | Resolution No. 6 of 2010, Article 8: only charges the Department approves |
| Annual service charge | Share by unit area; estimate not printed | – | – | Law No. 27 of 2007, Article 22 |
| Brokerage | Not printed | – | – | Agree in writing |
The figures are arithmetic on printed prices and the published percentages. The amount actually payable is the one in the signed contract and on the Land Department receipt, and the 2013 fee table is older than the Department’s current service pages, which is why the purchaser asks the developer for the fee statement for the unit. The service page also lists the documents for a non-resident individual buyer: a copy of the sale and purchase contract and a copy of a valid passport.
Azizi Rose Dubai is placed by the developer in Downtown Jebel Ali. The page calls the project the gateway to that community and puts it beside JAFZA, and the Jebel Ali port, both of which the page describes in marketing terms that this guide does not repeat. Portals add that the site is along Sheikh Zayed Road (the E11), and A1 and Dubizzle name the registry zone as Jabal Ali Industrial Second.

The developer prints eight drive times from the project. They are the only distances in the sources that belong to the project itself, and the table gives them as printed, with the page’s own place names.
| Place as the developer names it | Drive time as printed | Note |
|---|---|---|
| Life Pharmacy Metro | 3 min | The page names no line or station beyond this label |
| Expo City Dubai | 15 min | As printed |
| Dubai Parks and Resorts | 20 min | As printed |
| Jumeirah Lake Towers | 12 min | As printed |
| Dubai Marina and JBR | 12 min | Printed together |
| Ibn Battuta Mall | 13 min | As printed |
| Al Maktoum International Airport (DWC) | 25 min | As printed |
| Downtown Dubai | 30 min | As printed |
The page does not say at what time of day the drive times apply, and drive times between places along Sheikh Zayed Road depend on traffic. The same embedded data also holds a community-level object with a different map point and different times, including a metro figure of 0 minutes and 5 minutes to Ibn Battuta Mall. Those belong to the community and not to the project, and this guide uses the times the page prints for the project.
The project’s own map point in the page data is 24.972673 north, 55.090108 east. That allows straight-line distances to be calculated to places whose coordinates a public reference gives. They are not drive times, and they are not distances the developer prints. The table puts the two side by side for the three places where both exist.
| Place | Straight line from the project point, km, calculated | Coordinates used | Developer’s drive time |
|---|---|---|---|
| Expo City Dubai | 6.3 | 24.96083, 55.15083 (Wikipedia) | 15 min |
| Al Maktoum International Airport | 11.8 | 24.8882778, 55.1603778 (Wikipedia) | 25 min |
| Port of Jebel Ali | 5.2 | 25.01126, 55.06116 (Wikipedia) | Not printed |
| Community-level point in the page data | 6.6 | 24.987699, 55.027180 (developer page data) | Not applicable |
The straight-line distances come from the haversine formula on the coordinates named in the table, with the Earth’s radius taken as 6,371 km. A drive on roads is longer than a straight line, which is why a 6.3 km line to Expo City and a printed 15 minutes can both be right. A buyer who needs a commute estimate drives the route at the hour in question.
Wikipedia’s article on Jebel Ali Free Zone places the zone at the far western end of Dubai near Abu Dhabi and says it began operating in 1985, with the Port of Jebel Ali opened in 1979 according to the port’s own article. The airport article gives the opening date of Al Maktoum International Airport as 27 June 2010. These are encyclopedia statements, given here to place the project in a long-established industrial and logistics corridor and not as a forecast of anything.
Wikipedia’s Jebel Ali article describes the Jebel Ali Industrial Area as one of Dubai’s oldest industrial districts, lying east of the port. Whether the registry zone name Jabal Ali Industrial Second corresponds to that area is not stated by any source read, so the guide does not equate them. The zone name is given because it is the name that appears on the Land Department’s record.
FAM Properties lists five schools for the area: Al Ghaf Private School, Dove Green Private School, Durham School, The Arbor School and The International School of Choueifat (branch). It prints no distance to them, and it describes the metro as within walking distance in the Red Line extension area without quantifying it. Both items are portal statements and are recorded as such.
Whether the plot sits in an area open to non-UAE buyers is a legal question and not a matter of location text. Regulation No. 3 of 2006 lists areas, among them plots in Jebel Ali, in which non-UAE nationals may own freehold, and the developer’s page and Dubizzle both describe this project as freehold. The plot number is not printed by any source, so the area list cannot be matched to the project from public text alone.
Section 7 explains how the Department’s project registration ties off-plan sales to freehold or long-term lease land.
The official pages describe an off-plan sale in Dubai as a chain of registrations, each with its own document. The English text of the main laws is the Land Department’s legislation compendium, a 2014 edition, so each article quoted here is a lead to check against the current text, and the Department’s service pages were read on 13 November 2026. The longer introduction to the process is in the guide to off-plan property in Dubai.

Law No. 7 of 2006 on real property registration restricts the right to own real property in the emirate to UAE nationals, nationals of the Gulf Cooperation Council states, companies fully owned by them and public joint stock companies. It then provides that, subject to the Ruler’s approval, non-UAE nationals may in certain areas determined by the Ruler be granted freehold ownership without time restriction, or usufruct or leasehold rights for up to 99 years (Article 4).
Regulation No. 3 of 2006 is the instrument that lists the areas by plot number, and the 2014 compendium prints a list that includes plots in Jebel Ali, Dubai Marina, Palm Jumeirah and Al Jaddaf, among others. The Land Department’s FAQ says that units for non-UAE citizens may be registered in the areas the Ruler specifies under Law No. 7 of 2006, and that companies owned by non-UAE citizens may hold them if registered in a Dubai free zone or in another emirate under the Department’s memoranda.
The guide on freehold and leasehold in Dubai and the guide on whether foreigners can buy apartments in Dubai cover the same ground at greater length.
| Step or rule | What the official source says | Source |
|---|---|---|
| Project registration | The developer registers the project in the Oqood portal. The terms require that the land be in freehold or long-term lease areas, that the ownership deed be available (preliminary sales certificates are not accepted), that the developer be registered in the Trakheesi system, and that a 30 percent guarantee be given as completed construction, a bank guarantee or a cash deposit. The developer pays a registration fee of AED 150,000 plus AED 20 of other fees | Land Department: register a project |
| Advertising | A developer may not advertise off-plan units in local or international media, or take part in exhibitions to promote them, without written authorisation from the Department (Law No. 8 of 2007, Article 5) | Compendium |
| Escrow account opened | A developer wishing to sell off-plan requests an escrow account, which is opened under a written agreement with an accredited escrow agent in the name of the project; purchasers’ payments are deposited there (Law No. 8 of 2007, Articles 6 and 7) | Compendium |
| Escrow protection | The account is dedicated to the construction of that project, and no attachment may be imposed on the payments for the benefit of the developer’s creditors; each project has its own account (Article 9) | Compendium |
| Escrow retention | After the completion certificate the escrow agent retains 5 percent of the account’s total value until one year after the units are registered in the purchasers’ names (Article 14) | Compendium |
| Escrow release | The developer applies in the Oqood portal; the terms require a recent technical report from the Department, not older than three months, and refer to a percentage of construction works after 20 percent completion | Land Department: escrow activation |
| Sale registration | The sale and purchase contract is registered in the provisional register in the Oqood portal within 90 days of signing; the output is a provisional registration e-certificate sent to the purchaser | Land Department: initial sale registration |
| Void if unregistered | Any sale or other disposition of an off-plan unit is void unless entered in the Interim Property Register (Law No. 13 of 2008, Article 3) | Compendium |
| Sale before approval | A private sale contract for an off-plan unit in a project the competent entities have not approved is null and void (Law No. 13 of 2008, Article 10) | Compendium |
| Registration in the buyer’s name | After the completion certificate the developer enters the project and the sold units in the Property Register in the purchasers’ names (Law No. 13 of 2008, Article 8) | Compendium |
The Department’s Project Status Enquiry, which the page says can also be reached in the Dubai REST application as Project Status, lets anyone search by project name or number. Its result fields include the project number, the registered units, the completion, the developer, the management company and the escrow bank name.
For this project that is the quickest public check of whether the project is registered, and the project number it shows is the one to put in the contract. The Project Status Enquiry page is the starting point.
The rules link what a buyer pays to what has been built in two ways. Resolution No. 6 of 2010 lets a purchaser apply to court to end the contract if the developer declines to settle payments in line with the construction milestones proposed by RERA, if it makes material changes to the agreed specification, or if the unit is unfit for use at handover because of material defects (Article 20).
The same resolution sets out what happens if a purchaser fails to pay. The developer serves notice and the Department allows 30 days.
After that the amount the developer may retain depends on how much of the project is built, confirmed by a technical report from a RERA-approved consultant: at most 25 percent of the unit value below 60 percent completion and at most 40 percent from 60 percent, with a further option from 80 percent completion of keeping the amounts paid and selling the unit at auction (Articles 15 and 17).
The rules therefore bind both sides, and the dates and conditions in the contract are the first thing to read.
Disputes can go to the Department for conciliation (Article 14), and the net-area rule in Article 13, which section 4 described, protects the buyer from paying for area the unit does not have. After handover, the service-charge rules described in section 3 apply, and the Land Department’s FAQ says that charges are paid in the accounts the agency approves, through the Mollak system.
The following table sets out what official pages say on residence and tax in the UAE in the terms the pages use. It does not say that any unit in the project qualifies for anything. Eligibility for a visa is decided by the issuing authority, and the right place to check it is that authority’s own service, linked from the UAE government portal.

| Item | Rule as the official source states it | Source |
|---|---|---|
| Golden visa, property route | The portal lists a category of investors in public investments or real estate, with a residence duration of 5 years for real estate, and as the main requirement a minimum capital of AED 2 million with property ownership or a contribution to an establishment paying at least AED 250,000 annually in taxes. The page was updated on 28 July 2026 | u.ae: Golden visa |
| Income tax | The UAE does not levy income tax on individuals | u.ae: Taxation |
| Value added tax | 5 percent VAT on the purchase of goods and services; the portal page does not say how it applies to the sale of a residential unit | u.ae: Taxation |
| Corporate tax | A natural person’s income from selling or leasing land or real estate in the UAE that needs no licence is excluded from Corporate Tax, according to the Federal Tax Authority guide of October 2024 | FTA guide CTGREI1 |
| Annual tax on owning a home | The portal page names income tax, VAT, excise tax and corporate tax; it does not name a recurring tax on holding a home. The Land Department pages read list registration fees at sale and service charges for jointly owned property, and neither is described as an annual property tax | u.ae: Taxation |
| Exchange rate | The Central Bank table for September 2026 prints 3.6725 dirhams per USD on 1, 2 and 3 September | Central Bank of the UAE |
On the Golden visa route, the rule as the portal prints it refers to AED 2 million. Each single-unit price printed for the project on the portals read, from AED 607,000 to AED 1,297,000, is below that figure.
The wording of the rule on combined purchases, on property that is still under construction and on mortgaged property is a question for the authority, and the guide on this site, what is the Dubai Golden Visa, describes the property route in more detail. The developer’s page makes no residence claim for this project.
On tax, the portal and the Federal Tax Authority pages deal with taxes of general application. They do not decide the treatment of a particular sale or contract. VAT treatment of the purchase price, any charge on the first transfer and the service charge are therefore items to put in writing, and the guide on property tax in Dubai gives the broader picture, with the caution that older figures in any guide are checked against the official pages.
On financing, no source read gives a lender, a loan-to-value limit or a rate for this project, and the page states none. The guide on mortgages for foreigners is linked in section 5. The practical point from the payment plan is that half of the price falls due at handover, which is when most lenders would be asked to fund.
The developer’s page prints no price, no dates and no sizes, and the portals print figures that differ. A reservation for Azizi Rose Dubai therefore needs the following items, each of which a buyer can ask for before paying a deposit. The list follows from the gaps shown in the tables above, and each answer belongs in the contract or in a signed schedule to it, since a web page or a listing can change without notice.

A local lawyer can read the agreement, the Land Department record and the escrow details on the buyer’s behalf. The reservation form is worth reading for the refund terms of the deposit before it is signed.
The developer’s current list includes several other projects in Downtown Jebel Ali, and this site carries a guide for each. The table compares only what can be read the same way for each: the price the developer’s own page prints, per the data files of 13 November 2026, and the starting price shown on A1 Properties’ project pages, re-read on the same date. Handover dates and sizes differ by source and are in each project’s own guide.

| Project in Downtown Jebel Ali | Developer page price, data pass 13 Nov 2026 | A1 “starting from”, 13 Nov 2026 | Unit types seen on portals |
|---|---|---|---|
| Azizi Rose (this page) | Not printed | AED 607,000 | Studio, 1 bedroom |
| Azizi Gabriel Dubai | Not printed | AED 564,000 | Studio, 1 and 2 bedroom |
| Azizi Lina Dubai | From AED 572,000 | AED 590,000 | Studio to 3 bedroom |
| Azizi Wares Dubai | Not printed | AED 555,000 | Studio, 1 and 2 bedroom |
| Azizi Abraham Dubai | From AED 588,000 | Not on A1’s list | Studio to 3 bedroom |
| Azizi Noura Dubai | From AED 578,000 | AED 550,000 | Studio, 1 and 2 bedroom |
| Azizi Arian Dubai | From AED 571,000 | Not on A1’s list | Studio to 3 bedroom |
Seen side by side, Azizi Rose Dubai is one of the projects on which the developer’s own page prints no price, while the developer pages of four of the others print a “from” figure. The table is a list of printed facts and not a ranking. Prices of different unit types, floors and dates are not comparable, and no project is described as better than another. The guide on the Dubai property market and the Dubai city page give the wider market picture.
Listings of other developers elsewhere in Dubai are shown below for context. Each has its own guide on this site, and each figure is the one that guide prints from its own source; the areas are different, and the figures are not like-for-like.
| Dubai listing on this site | Area | Figures from that listing’s guide |
|---|---|---|
| Celestia | Dubai South | DAMAC project data: 539 to 733 sq ft, AED 695,000 to 988,000, studio to two-bedroom |
| Windsor House II | Dubai South | Property Finder: one-bedroom of 779 sq ft from AED 1.2 million; handover Q3 2029 per Property Finder |
| Terra Woods at Expo Living | Expo Living | One-bedroom from 742 sq ft, from AED 1,599,888 |
| UH by Ellington JLT | Jumeirah Lake Towers | Listing header: starting from USD 440,000 |
The developer’s page lists Jumeirah Lake Towers and Expo City among the places within a 12 and 15 minute drive of the project, which is why these two areas are among the nearby listings. The UAE country page lists the other projects on this site, and the Dubai developers directory lists the developer profiles.
This section uses only what the developer’s own pages and press releases state, read in the data pass of 13 November 2026. The legacy page says that the company was established in 2007 and is headquartered in Dubai, and the chairman’s message on the same site describes 2007 as the year of its venture into real estate. The press materials name Mirwais Azizi as Founder and Chairman of Azizi Group and Farhad Azizi as Group CEO (Azizi press release of 16 October 2026, KONE announcement).
In a press release of 15 September 2026, the developer’s delivery announcement, Azizi states that more than 45,000 homes have been delivered to buyers of over 100 nationalities since its founding, that more than 150,000 units are under construction at various stages, that seven projects were handed over in 2026 to that date and that it aims for ten more by December 2026. These are portfolio-wide figures and are not specific to this project.
The timeline on the developer’s site lists the 2009 agreement with the master developer Nakheel for the Al Furjan community, handovers in Al Furjan in 2016 and in 2020, including Aura in Downtown Jebel Ali in 2020, and the launch of Azizi Riviera in 2017. The communities the developer names include Azizi Riviera, Azizi Venice, Azizi Milan, Al Furjan, Palm Jumeirah, Dubai Healthcare City, Dubai South, Studio City, Sports City, Downtown Jebel Ali and Dubai Islands.
Its press releases also describe in-house manufacturing of aluminium and facade elements, steel, ducting and marble, and a construction partner named Gardinia. No architect, contractor or escrow bank for this project is named on the project page. No certificate or register extract was reviewed for this guide, and the company’s statements are recorded as the company’s statements.
The developer places the project in Downtown Jebel Ali, within the community it labels Jebel Ali, along Sheikh Zayed Road according to A1, Bayut and FAM. The Land Department record quoted by A1 and Dubizzle names the zone Jabal Ali Industrial Second. The page prints the project’s map point as 24.972673 north, 55.090108 east, and no street address or plot number.
The developer’s page prints no price. Bayut and A1 print a launch or starting price of AED 607,000, about USD 165,283 at 3.6725, and Bayut shows studio listings from AED 624,000 to AED 695,000 and a one-bedroom from AED 924,000 (data pass). A Dubizzle one-bedroom listing asks AED 1,297,000. All are portal indications dated 13 November 2026, and none is an offer.
The developer prints no handover date for the project. FAM prints 31 May 2028, A1, Bayut and the Dubizzle listing print Q3 2028, and the Dubizzle project section prints July 2028. The date that binds the developer is the one in the sale and purchase agreement, so the buyer asks for it in writing.
The developer’s type label is Studio and 1 Bedroom. Portals list studios of 338 to 438 sq ft and one one-bedroom of 838 sq ft. No source read prints a two-bedroom unit, a count for each type or a plan.
The developer’s page describes the offer as freehold and the Dubizzle listing prints Freehold as the ownership. The plot number is not printed, so a buyer cannot match it to the areas listed in Regulation No. 3 of 2006 from public text alone. The tenure should be confirmed in the agreement and, after registration, on the title.
A1 and Bayut print 10 percent down, 40 percent during construction and 50 percent on handover, and Dubizzle prints 50/50. On AED 607,000 that is AED 60,700, AED 242,800 and AED 303,500, calculated. The dates of the 40 percent instalments are not printed in any source read.
The sources differ. A1 prints 226 registered units and a breakdown of four basements, ground, three podium levels, eight upper floors and roof. Dubizzle’s Land Department record prints 17 floors, and Bayut prints a 14-storey building. The developer prints neither a unit nor a floor count.
The Land Department’s fee table sets registration of a sale contract at 4 percent of its value, shown on its service page as 2 percent for the seller and 2 percent for the purchaser plus AED 20 in other fees. On AED 607,000 the total is AED 24,280, calculated. Who pays what is a matter for the contract, and service charges are separate.
This guide does not claim it does. The UAE government portal prints a minimum capital of AED 2 million for the real estate route, and each single-unit price on the portals read is below that figure. The authority decides eligibility, and the guide on this site describes the route at greater length.
The Land Department’s Project Status Enquiry, also in the Dubai REST application, shows the project number, the registered units, the completion, the management company and the escrow bank name. The buyer compares them with the sales material and asks that every payment go into the named escrow account.
Last checked: 13 November 2026. Sources:
This is not legal, tax or financial advice.