Azizi Rose Dubai: Studios and 1-Bed Guide (2026)

Jebel Ali, Dubai, UAE
  • AZRO3075
  • Property ID
  • Apartment, Office, Studio
  • Property Type
  • 1
  • Bedroom
  • 31.4 - 77.9
  • sq. m.
For Sale
Azizi Rose Dubai: Studios and 1-Bed Guide (2026)
Jebel Ali, Dubai, UAE

Description

Azizi Rose Dubai is a studio and one-bedroom project in Downtown Jebel Ali, a community at the western end of Dubai, and the developer’s own page prints no price, no handover date and no construction percentage for it, while four property portals print a launch price of AED 607,000 (about USD 165,283, at the pegged rate of 3.6725) and handover dates between 31 May 2028 and the third quarter of 2028.

Azizi Rose Dubai street-level exterior render, Downtown Jebel Ali

This guide to Azizi Rose Dubai sets the developer’s page, A1 Properties, FAM Properties, Dubizzle (which cites Dubai Land Department data) and Bayut side by side, each figure with its source and the date it was read, which is 13 November 2026. Where they differ, the difference is shown and no figure is chosen over another.

It then adds what a buyer can calculate from the printed numbers, the rules that govern an off-plan purchase in Dubai as the official pages state them, and a list of what to ask for in writing before reserving.

Overview of Azizi Rose Dubai

The developer’s project page, read in the data pass of 13 November 2026, describes Azizi Rose Dubai as a project of studios and one-bedroom apartments in Downtown Jebel Ali. Its text speaks of a community where global companies sit on trade routes between Asia and Europe, of Sheikh Zayed Road and the metro as “in close proximity”, and of Jebel Ali Free Zone (JAFZA) as being on the doorstep.

Azizi Rose exterior render at dusk with podium pool terrace

A plain request to the developer’s site on the day of writing returned a rate-limit response (HTTP 429), so the developer’s own statements in this guide come from that pass and keep its date.

The page’s embedded data carries a project type label of Studio and 1 Bedroom, but no price, no status, no handover date and no construction percentage. The brochure, floor-plan and fact-sheet links in the same data are empty, and the page offers a register-your-interest route instead. The project does not appear on the developer’s construction-updates page, as the scope pass of the same day recorded.

These are statements about what the page prints, not judgements about the project. They explain why the tables below lean on portals for status, price and dates, and why every portal figure is labelled with the portal’s name. A reader who wants one number for the handover or the floor count will not find one here, because the sources do not agree and none of them is the contract.

The key facts below are the starting point. Each row says who prints the figure, so that a row with several values can be read as a list of what has been published and not as a finding.

Azizi Rose Dubai key facts As published Source and date
Developer Azizi Developments (Azizi) Developer project page, data pass 13 Nov 2026
Project type label Studio and 1 Bedroom Developer page, 13 Nov 2026
Community Jebel Ali; page text refers to Downtown Jebel Ali Developer page, 13 Nov 2026
Registry zone name Jabal Ali Industrial Second A1 Properties and Dubizzle (Dubai Land Department data), 13 Nov 2026
Status Developer: none printed. Bayut: Under Construction. A1: Off Plan, registry-derived record active. Dubizzle citing the Land Department: Active, last inspected February 2026 Each source, 13 Nov 2026
Handover Developer: none printed. FAM: 31 May 2028. A1, Bayut and the Dubizzle listing: Q3 2028. Dubizzle project section: July 2028 Each source, 13 Nov 2026
Price Developer: none printed. Bayut and A1: from AED 607,000 (about USD 165,283) Bayut (data pass) and A1, 13 Nov 2026
Payment plan 10 percent down, 40 percent during construction, 50 percent on handover (A1; Bayut per data pass); 50/50 (Dubizzle) Each source, 13 Nov 2026
Registered units 226 (A1); the developer prints no unit count A1, 13 Nov 2026
Tenure Freehold (Dubizzle listing); the developer page also describes the offer as freehold Dubizzle, 13 Nov 2026; developer page
Facilities Adult and children’s pools, separate gyms, private cinema, children’s play area, multipurpose hall, parking Developer page, 13 Nov 2026
Images 10 renders; no plans or maps in the gallery Developer page, 13 Nov 2026

The rest of the guide follows the order in which a buyer usually asks questions: what the sources say about status and dates, what the building is, what it costs on paper, where it stands, what Dubai law and the official pages say about an off-plan purchase, and what to obtain in writing.

What each source prints about status, launch and handover

Five places say something about where the project stands. The developer’s page prints nothing on status in its visible text, and the portals draw on their own feeds and on registry records. The first table covers status and launch; the second covers handover.

Azizi Rose street corner with ground-floor retail, render
Source Status as printed Launch as printed Date of the source
Developer page No status label; a flag for a new release is false; no construction percentage A listing launch field of 2026-01-06 in the page’s embedded data (not visible text) Data pass, 13 Nov 2026
Bayut project page Under Construction Launch price AED 607,000 Data pass, 13 Nov 2026; a plain request today met a security check
A1 Properties Off Plan; registry-derived record shows 226 registered units and the project as active Launch-price sources vary between AED 607,000 and AED 619,000 Re-read 13 Nov 2026
Dubizzle listing Off-plan; project status Active, last inspected February 2026, source named as the Dubai Land Department Listing posted 16 Sep 2026; page updated 11 Nov 2026; launch price AED 607,000 Re-read 13 Nov 2026
FAM Properties Off-plan Launched 1 May 2026 Re-read 13 Nov 2026

The two launch dates, 6 January 2026 in the developer’s data field and 1 May 2026 on FAM, are about four months apart. No source says what the date refers to. A first release to brokers, the opening of sales and a registry entry are different events, and each could carry a different date. The guide therefore records both as printed and draws no conclusion.

Source Handover as printed Note
Developer page Not printed No handover field in the page data
Bayut project page Q3 2028 An earlier scope-pass note of the same day recorded Q1 2028 on a Bayut page; the data pass read Q3 2028
A1 Properties Q3 2028 Printed in the key-facts strip of the project page
FAM Properties 31 May 2028 Printed as the handover and repeated in its FAQ answer on completion
Dubizzle, project section July 2028 Under the heading naming the Land Department as the source
Dubizzle, listing section Q3 2028 Same page, listing fields

Read together, the printed handovers run from 31 May 2028 to the end of the third quarter of 2028. From 31 May to 30 September is 122 days, calculated, so the widest spread among the sources is about four months. A quarter label such as Q3 2028 covers July, August and September, which means that the Q3 entries and the July entry on Dubizzle do not necessarily disagree. FAM’s 31 May 2028 falls in the second quarter and is the earliest figure.

None of these is a commitment. The date that binds the developer is the handover date written into the sale and purchase agreement, together with the definition of handover and the consequence if it is not met. For that reason the handover date in the contract is among the first items in the list in section 9. The Land Department’s “last inspected” entry is a registry record of an inspection and is not a statement about the date of completion.

The building: floors, units, parking and facilities as each source prints them

The building is where the sources differ most, and it makes a useful exercise in reading registry-derived descriptions. The developer’s page prints no floor count and no unit count. Three other sources print numbers, and they are not the same kind of number: one lists levels from a registry record, one lists a storey count, and one prints a building summary that names the Land Department as its source.

Building descriptor A1 Properties (registry-derived) Dubizzle (Land Department data) Bayut project page FAM Properties
Floors or levels Four basements, ground floor, three podium levels, eight upper floors and roof 17 floors 14-storey residential building with ground-floor retail Mid-rise residential tower, no count
Registered units 226 registered units Not printed Not printed Not printed
Uses Commercial and residential components; ground-level retail 7 retail centres Ground-floor retail Not printed
Lifts Not printed 4 elevators Not printed Not printed
Parking Not printed 239 parking spaces Not printed Covered parking listed
Building area Not printed 357,095 sq ft (basis not stated) Not printed Not printed
Swimming pools Adult and children’s pools 1 swimming pool Not printed Shared pool and children’s pool listed

Dubizzle’s floor figure of 17 and A1’s breakdown can be compared by simple counting. A1’s list has four basements, one ground floor, three podium levels and eight upper floors, which adds up to 16 levels, or 17 if the roof is counted as a level. Without the basements and the roof the count above ground is 12. None of these totals is 14, the storey count on Bayut.

The arithmetic is shown for the reader and is not a finding. No source says that Dubizzle’s 17 counts basements and roof, and no source explains the 14. A buyer who needs the storey count for a view, a floor choice or a comparison asks for the building permit drawings and the floor-by-floor unit schedule, both of which are on the list in section 9.

Level count from A1’s breakdown Levels Calculation
Basements 4 As printed
Ground floor 1 As printed
Podium levels 3 As printed
Upper floors 8 As printed
Sum without roof 16 4 + 1 + 3 + 8
Sum with roof 17 16 + 1
Above ground without roof 12 1 + 3 + 8
Above ground with roof 13 12 + 1

The unit count has one source only. A1 prints 226 registered units and says they include commercial and residential components, and Dubizzle’s record names seven retail centres. Neither source states how many of the 226 are apartments, so this guide gives no residential unit count and no studio-to-one-bedroom split. The developer’s type label for the project is Studio and 1 Bedroom, and the portals show retail at ground level; whether retail units are offered for sale to buyers is not printed anywhere read.

Facilities: the developer’s list beside the portals

The developer’s page lists the facilities in plain terms. Portals add items from their own sources, and a few of those items conflict. The table keeps the developer’s list in the first column and marks what only a portal prints.

Facility Developer page Portals Open point
Swimming pools One adult pool and one children’s pool A1: adult and children’s pools. Dubizzle (Land Department record): 1 swimming pool. FAM: shared pool and children’s pool Number and location of pools
Gyms Separate gyms for men and women A1: separate gyms. FAM: gym Size and opening hours
Cinema Private cinema A1: private cinema Whether bookable and any fee
Children’s play area Children’s play area A1: indoor children’s play area Indoor or outdoor
Multipurpose hall Multipurpose hall for indoor entertainment A1: multipurpose facilities Access rules
Gaming lounge Not printed A1 only Not confirmed by the developer
Parking Ample parking Dubizzle: 239 spaces. FAM: covered parking Spaces per unit and any fee
Security and CCTV Not printed FAM: 24/7 security and CCTV. Dubizzle: CCTV security Not confirmed by the developer
Central cooling Not printed FAM and Dubizzle list central A/C Cooling charges, if any

Pools, lifts, parking areas and gardens are the items that carry running cost. Dubai’s Law No. 27 of 2007 on jointly owned real property treats structural parts, parking areas, recreational facilities, swimming pools and gardens as common areas unless the site plan says otherwise (Article 7), and each unit owner pays a share of the annual service fees calculated from the unit’s area against the total area (Article 22), as the Land Department legislation compendium prints them.

The developer’s page publishes no service-fee estimate. The Land Department’s FAQ defines a service charge as the annual charge approved by the Real Estate Regulatory Agency to cover the management, operation, maintenance and repair of the jointly owned property, paid into accounts that the agency approves. A buyer asks for the estimate per unit and the name of the management company before reserving.

Prices, sizes and unit types: what the portals print for studios and one-bedrooms

The developer prints no price for Azizi Rose Dubai, so every figure in this section is a portal figure. They are of four different kinds: a launch or starting price, a registered sale, an asking price for a studio, and an asking price for a one-bedroom. The kinds are not interchangeable, and the table labels each one.

Azizi Rose podium pool deck seen from above, render

Dirham figures are as printed; the dollar column is calculated at the pegged rate of 3.6725 dirhams per dollar (USD), which the Central Bank of the UAE’s exchange-rate table for September 2026 prints for USD.

Azizi Rose Dubai price indication AED as printed USD, calculated Source and date
Developer page Not printed – Data pass, 13 Nov 2026
Launch or starting price 607,000 165,283 Bayut (“Launch price”, data pass) and A1 (“Starting from”), 13 Nov 2026
Upper end of A1’s launch-price range 619,000 168,550 A1: records show 607,000 to 619,000, 13 Nov 2026
Registered studio sale of about 338 sq ft 624,000 169,912 A1: sale dated 21 Aug 2026, read 13 Nov 2026
Five studio listings, lowest 624,000 169,912 Bayut listings, data pass 13 Nov 2026
Five studio listings, highest 695,000 189,244 Bayut listings, data pass 13 Nov 2026
One-bedroom “from” price 924,000 251,600 Bayut project page, data pass 13 Nov 2026
One-bedroom listing, 838 sq ft, unfurnished 1,297,000 353,165 Dubizzle, posted 16 Sep 2026, updated 11 Nov 2026

Three points help in reading the table. First, a launch price is a minimum that applies to a particular unit type. A1 prints it for the project without naming a unit type, and the Bayut studio page prints it as the launch price, so the data pass treats it as the studio figure. Second, the registered sale on A1 and the studio listings on Bayut are close to each other in value, and a listing is an asking price that can change without notice.

Third, the one-bedroom figures differ by AED 373,000, calculated as 1,297,000 minus 924,000. They are not the same product: one is a project-level “from” price and the other is a single listing of an 838 sq ft unit whose floor, view and balcony are particular to it. A1’s own page says buyers acquiring assignments should verify the seller’s paid percentage and the outstanding developer balance, which is a reminder that a listing price and the amount still owed to the developer are separate numbers.

The developer, as the data pass found, also prints no per-unit price list and no sizes. Sizes therefore come from portal records and listings. They are given in square feet as printed, with a metric figure calculated at 0.092903 square metres per square foot.

Unit type Size seen, sq ft Metric, calculated, m² Where it is printed
Studio 338 31.4 A1: studio sale of 21 Aug 2026
Studio 352 32.7 Bayut listing, data pass
Studio 388 36.0 Bayut listing, data pass
Studio 438 40.7 Bayut listing, data pass
One bedroom 838 77.9 Dubizzle listing: 2 bathrooms, unfurnished
Balcony of that one-bedroom 172 16.0 Dubizzle listing

The studio sizes seen run from 338 to 438 sq ft, a spread of 100 sq ft, and the single one-bedroom size is 838 sq ft. Five studio listings on Bayut cannot show the full range of layouts in the project, and one one-bedroom listing cannot show the range for that type.

The count of layouts, the net area of each and the plan of each are on the list of written requests, because Dubai’s rules take the net area as the basis for registration and the contract is the document that fixes it.

Resolution No. 6 of 2010, which implements the law on the interim property register, provides that the net area of a unit is the area registered, that the developer may not claim the value of an area above the net area, and that the developer indemnifies the purchaser if the unit is smaller than agreed by more than 5 percent of the net area (Article 13).

A unit that is listed in square feet on a portal is therefore compared with the net area in the contract before any price is accepted. The source is the Land Department compendium, dated 2014, so the current text of the article is checked before reliance.

The developer’s type label covers studios and one-bedroom apartments only. A1 describes the residential collection in the same terms, and Bayut and Dubizzle list studio and one-bedroom units. No source read lists a two-bedroom unit, and none lists a size or a count for any type. The Dubizzle listing shows two bathrooms for its one-bedroom unit, and no source prints a bathroom count for the project.

Payment plan, Land Department fees and what they come to on the printed prices

The payment plan is printed by portals only. The developer’s page prints none. The sources agree that the plan has two halves, and they differ on whether the first half is split.

Azizi Rose pool and landscaped terrace below the apartments, render
Source Payment plan as printed
Developer page Not printed
A1 Properties 50/50, and in its payment-plan block 10% down payment, 40% during construction, 50% on handover
Bayut project page (data pass) 50/50 with 10% down, 40% before handover and 50% on handover
Dubizzle listing 50/50 (no split of the first half)
FAM Properties Not printed

The sources therefore agree on 50 percent at handover and on 10 percent as the first payment, and the 40 percent in between is described as being paid during construction. No source prints the dates or the number of instalments that make up the 40 percent, and none prints the milestone that triggers them. That schedule is the part of the plan that determines cash flow, so it is the part to obtain in writing.

The table applies the plan to two printed prices, the launch or starting price of AED 607,000 and the one-bedroom “from” price of AED 924,000. The amounts are calculated from the percentages and are not quotations. Dollar figures use the peg of 3.6725 and are rounded to the nearest dollar.

Instalment (calculated) On AED 607,000 USD On AED 924,000 USD
10 percent: down payment 60,700 16,528 92,400 25,160
40 percent: during construction 242,800 66,113 369,600 100,640
50 percent: on handover 303,500 82,641 462,000 125,800
Total 607,000 165,283 924,000 251,600

A plan in which half the price is due on handover has one practical consequence for a buyer who borrows: the second half is the amount a lender would be asked to fund at completion, and the lender’s own conditions then apply. The mortgage guide on this site, mortgage in Dubai for foreigners, is the place for loan questions. This page states no loan terms.

Land Department fees on the same prices

The Land Department’s fee table, issued as Executive Council Resolution No. 30 of 2013 and printed in the legislation compendium, sets the registration of a real property sale contract at 4 percent of the value of the contract. The Department’s service page for registering an initial sale describes the same 4 percent as two shares: 2 percent of the sale value for the seller and 2 percent for the purchaser, plus a knowledge fee of AED 10 and an innovation fee of AED 10.

Resolution No. 6 of 2010 adds that, unless otherwise agreed, the developer and the purchaser pay the registration fee in their respective percentages (Article 9). Who pays what is therefore a matter for the contract, and the table shows both readings.

Fee on the printed price Rule as published On AED 607,000 On AED 924,000 Source
Registration of the sale contract, total 4% of the value of the contract AED 24,280 (USD 6,611) AED 36,960 (USD 10,064) Resolution No. 30 of 2013, fee table
Purchaser share on the service page 2% plus AED 10 plus AED 10 AED 12,160 (USD 3,311) AED 18,500 (USD 5,037) Land Department service page
Time limit for registering the contract Within 90 days of signing – – Land Department service page
Developer administration charge Not printed – – Resolution No. 6 of 2010, Article 8: only charges the Department approves
Annual service charge Share by unit area; estimate not printed – – Law No. 27 of 2007, Article 22
Brokerage Not printed – – Agree in writing

The figures are arithmetic on printed prices and the published percentages. The amount actually payable is the one in the signed contract and on the Land Department receipt, and the 2013 fee table is older than the Department’s current service pages, which is why the purchaser asks the developer for the fee statement for the unit. The service page also lists the documents for a non-resident individual buyer: a copy of the sale and purchase contract and a copy of a valid passport.

Location: Downtown Jebel Ali, Jebel Ali Free Zone and the printed drive times

Azizi Rose Dubai is placed by the developer in Downtown Jebel Ali. The page calls the project the gateway to that community and puts it beside JAFZA, and the Jebel Ali port, both of which the page describes in marketing terms that this guide does not repeat. Portals add that the site is along Sheikh Zayed Road (the E11), and A1 and Dubizzle name the registry zone as Jabal Ali Industrial Second.

Azizi Rose curved balconies above ground-floor cafes, render

The developer prints eight drive times from the project. They are the only distances in the sources that belong to the project itself, and the table gives them as printed, with the page’s own place names.

Place as the developer names it Drive time as printed Note
Life Pharmacy Metro 3 min The page names no line or station beyond this label
Expo City Dubai 15 min As printed
Dubai Parks and Resorts 20 min As printed
Jumeirah Lake Towers 12 min As printed
Dubai Marina and JBR 12 min Printed together
Ibn Battuta Mall 13 min As printed
Al Maktoum International Airport (DWC) 25 min As printed
Downtown Dubai 30 min As printed

The page does not say at what time of day the drive times apply, and drive times between places along Sheikh Zayed Road depend on traffic. The same embedded data also holds a community-level object with a different map point and different times, including a metro figure of 0 minutes and 5 minutes to Ibn Battuta Mall. Those belong to the community and not to the project, and this guide uses the times the page prints for the project.

The project’s own map point in the page data is 24.972673 north, 55.090108 east. That allows straight-line distances to be calculated to places whose coordinates a public reference gives. They are not drive times, and they are not distances the developer prints. The table puts the two side by side for the three places where both exist.

Place Straight line from the project point, km, calculated Coordinates used Developer’s drive time
Expo City Dubai 6.3 24.96083, 55.15083 (Wikipedia) 15 min
Al Maktoum International Airport 11.8 24.8882778, 55.1603778 (Wikipedia) 25 min
Port of Jebel Ali 5.2 25.01126, 55.06116 (Wikipedia) Not printed
Community-level point in the page data 6.6 24.987699, 55.027180 (developer page data) Not applicable

The straight-line distances come from the haversine formula on the coordinates named in the table, with the Earth’s radius taken as 6,371 km. A drive on roads is longer than a straight line, which is why a 6.3 km line to Expo City and a printed 15 minutes can both be right. A buyer who needs a commute estimate drives the route at the hour in question.

District context from public references

Wikipedia’s article on Jebel Ali Free Zone places the zone at the far western end of Dubai near Abu Dhabi and says it began operating in 1985, with the Port of Jebel Ali opened in 1979 according to the port’s own article. The airport article gives the opening date of Al Maktoum International Airport as 27 June 2010. These are encyclopedia statements, given here to place the project in a long-established industrial and logistics corridor and not as a forecast of anything.

Wikipedia’s Jebel Ali article describes the Jebel Ali Industrial Area as one of Dubai’s oldest industrial districts, lying east of the port. Whether the registry zone name Jabal Ali Industrial Second corresponds to that area is not stated by any source read, so the guide does not equate them. The zone name is given because it is the name that appears on the Land Department’s record.

FAM Properties lists five schools for the area: Al Ghaf Private School, Dove Green Private School, Durham School, The Arbor School and The International School of Choueifat (branch). It prints no distance to them, and it describes the metro as within walking distance in the Red Line extension area without quantifying it. Both items are portal statements and are recorded as such.

Whether the plot sits in an area open to non-UAE buyers is a legal question and not a matter of location text. Regulation No. 3 of 2006 lists areas, among them plots in Jebel Ali, in which non-UAE nationals may own freehold, and the developer’s page and Dubizzle both describe this project as freehold. The plot number is not printed by any source, so the area list cannot be matched to the project from public text alone.

Section 7 explains how the Department’s project registration ties off-plan sales to freehold or long-term lease land.

Buying off-plan in Dubai: ownership areas, registration, escrow and the payment schedule

The official pages describe an off-plan sale in Dubai as a chain of registrations, each with its own document. The English text of the main laws is the Land Department’s legislation compendium, a 2014 edition, so each article quoted here is a lead to check against the current text, and the Department’s service pages were read on 13 November 2026. The longer introduction to the process is in the guide to off-plan property in Dubai.

Azizi Rose facade and entrance road by day, render

Where a foreign buyer may own

Law No. 7 of 2006 on real property registration restricts the right to own real property in the emirate to UAE nationals, nationals of the Gulf Cooperation Council states, companies fully owned by them and public joint stock companies. It then provides that, subject to the Ruler’s approval, non-UAE nationals may in certain areas determined by the Ruler be granted freehold ownership without time restriction, or usufruct or leasehold rights for up to 99 years (Article 4).

Regulation No. 3 of 2006 is the instrument that lists the areas by plot number, and the 2014 compendium prints a list that includes plots in Jebel Ali, Dubai Marina, Palm Jumeirah and Al Jaddaf, among others. The Land Department’s FAQ says that units for non-UAE citizens may be registered in the areas the Ruler specifies under Law No. 7 of 2006, and that companies owned by non-UAE citizens may hold them if registered in a Dubai free zone or in another emirate under the Department’s memoranda.

The guide on freehold and leasehold in Dubai and the guide on whether foreigners can buy apartments in Dubai cover the same ground at greater length.

Registration of the project, the sale and the escrow account

Step or rule What the official source says Source
Project registration The developer registers the project in the Oqood portal. The terms require that the land be in freehold or long-term lease areas, that the ownership deed be available (preliminary sales certificates are not accepted), that the developer be registered in the Trakheesi system, and that a 30 percent guarantee be given as completed construction, a bank guarantee or a cash deposit. The developer pays a registration fee of AED 150,000 plus AED 20 of other fees Land Department: register a project
Advertising A developer may not advertise off-plan units in local or international media, or take part in exhibitions to promote them, without written authorisation from the Department (Law No. 8 of 2007, Article 5) Compendium
Escrow account opened A developer wishing to sell off-plan requests an escrow account, which is opened under a written agreement with an accredited escrow agent in the name of the project; purchasers’ payments are deposited there (Law No. 8 of 2007, Articles 6 and 7) Compendium
Escrow protection The account is dedicated to the construction of that project, and no attachment may be imposed on the payments for the benefit of the developer’s creditors; each project has its own account (Article 9) Compendium
Escrow retention After the completion certificate the escrow agent retains 5 percent of the account’s total value until one year after the units are registered in the purchasers’ names (Article 14) Compendium
Escrow release The developer applies in the Oqood portal; the terms require a recent technical report from the Department, not older than three months, and refer to a percentage of construction works after 20 percent completion Land Department: escrow activation
Sale registration The sale and purchase contract is registered in the provisional register in the Oqood portal within 90 days of signing; the output is a provisional registration e-certificate sent to the purchaser Land Department: initial sale registration
Void if unregistered Any sale or other disposition of an off-plan unit is void unless entered in the Interim Property Register (Law No. 13 of 2008, Article 3) Compendium
Sale before approval A private sale contract for an off-plan unit in a project the competent entities have not approved is null and void (Law No. 13 of 2008, Article 10) Compendium
Registration in the buyer’s name After the completion certificate the developer enters the project and the sold units in the Property Register in the purchasers’ names (Law No. 13 of 2008, Article 8) Compendium

The Department’s Project Status Enquiry, which the page says can also be reached in the Dubai REST application as Project Status, lets anyone search by project name or number. Its result fields include the project number, the registered units, the completion, the developer, the management company and the escrow bank name.

For this project that is the quickest public check of whether the project is registered, and the project number it shows is the one to put in the contract. The Project Status Enquiry page is the starting point.

Payment schedule and construction stage

The rules link what a buyer pays to what has been built in two ways. Resolution No. 6 of 2010 lets a purchaser apply to court to end the contract if the developer declines to settle payments in line with the construction milestones proposed by RERA, if it makes material changes to the agreed specification, or if the unit is unfit for use at handover because of material defects (Article 20).

The same resolution sets out what happens if a purchaser fails to pay. The developer serves notice and the Department allows 30 days.

After that the amount the developer may retain depends on how much of the project is built, confirmed by a technical report from a RERA-approved consultant: at most 25 percent of the unit value below 60 percent completion and at most 40 percent from 60 percent, with a further option from 80 percent completion of keeping the amounts paid and selling the unit at auction (Articles 15 and 17).

The rules therefore bind both sides, and the dates and conditions in the contract are the first thing to read.

Disputes can go to the Department for conciliation (Article 14), and the net-area rule in Article 13, which section 4 described, protects the buyer from paying for area the unit does not have. After handover, the service-charge rules described in section 3 apply, and the Land Department’s FAQ says that charges are paid in the accounts the agency approves, through the Mollak system.

Residence permits, taxes and financing for a foreign buyer

The following table sets out what official pages say on residence and tax in the UAE in the terms the pages use. It does not say that any unit in the project qualifies for anything. Eligibility for a visa is decided by the issuing authority, and the right place to check it is that authority’s own service, linked from the UAE government portal.

Azizi Rose terraces and glazed lounge at sunset, render
Item Rule as the official source states it Source
Golden visa, property route The portal lists a category of investors in public investments or real estate, with a residence duration of 5 years for real estate, and as the main requirement a minimum capital of AED 2 million with property ownership or a contribution to an establishment paying at least AED 250,000 annually in taxes. The page was updated on 28 July 2026 u.ae: Golden visa
Income tax The UAE does not levy income tax on individuals u.ae: Taxation
Value added tax 5 percent VAT on the purchase of goods and services; the portal page does not say how it applies to the sale of a residential unit u.ae: Taxation
Corporate tax A natural person’s income from selling or leasing land or real estate in the UAE that needs no licence is excluded from Corporate Tax, according to the Federal Tax Authority guide of October 2024 FTA guide CTGREI1
Annual tax on owning a home The portal page names income tax, VAT, excise tax and corporate tax; it does not name a recurring tax on holding a home. The Land Department pages read list registration fees at sale and service charges for jointly owned property, and neither is described as an annual property tax u.ae: Taxation
Exchange rate The Central Bank table for September 2026 prints 3.6725 dirhams per USD on 1, 2 and 3 September Central Bank of the UAE

On the Golden visa route, the rule as the portal prints it refers to AED 2 million. Each single-unit price printed for the project on the portals read, from AED 607,000 to AED 1,297,000, is below that figure.

The wording of the rule on combined purchases, on property that is still under construction and on mortgaged property is a question for the authority, and the guide on this site, what is the Dubai Golden Visa, describes the property route in more detail. The developer’s page makes no residence claim for this project.

On tax, the portal and the Federal Tax Authority pages deal with taxes of general application. They do not decide the treatment of a particular sale or contract. VAT treatment of the purchase price, any charge on the first transfer and the service charge are therefore items to put in writing, and the guide on property tax in Dubai gives the broader picture, with the caution that older figures in any guide are checked against the official pages.

On financing, no source read gives a lender, a loan-to-value limit or a rate for this project, and the page states none. The guide on mortgages for foreigners is linked in section 5. The practical point from the payment plan is that half of the price falls due at handover, which is when most lenders would be asked to fund.

What to ask for in writing before reserving Azizi Rose Dubai

The developer’s page prints no price, no dates and no sizes, and the portals print figures that differ. A reservation for Azizi Rose Dubai therefore needs the following items, each of which a buyer can ask for before paying a deposit. The list follows from the gaps shown in the tables above, and each answer belongs in the contract or in a signed schedule to it, since a web page or a listing can change without notice.

Azizi Rose curved facade detail with planted edge, render
  1. A price list dated the day of the offer, with the unit number, floor, type, net area and the exact total for the unit, in dirhams.
  2. The sale and purchase agreement for the specific unit, with the unit number, the plot and building details and the name of the project as registered.
  3. The handover date written into the agreement, the definition of handover, and the consequence if the date is not met; the sources print 31 May 2028, Q3 2028 and July 2028.
  4. The payment schedule with every instalment, its date or its construction milestone, and the amount of each; the 40 percent between the down payment and handover has no printed dates.
  5. The name of the escrow bank and the account name for the project, and written confirmation that every payment, the first one included, is made into that account.
  6. The Land Department project number, so that the buyer can find the project in the Project Status Enquiry and compare the registered units, the completion and the escrow bank with the sales material.
  7. The registration of the sale in the provisional register within 90 days of signing, and the provisional registration e-certificate when it is issued.
  8. The full legal name and trade licence of the company that signs the agreement, and, if the land belongs to another party, the master developer’s no-objection letter for the off-plan sale.
  9. The tenure of the unit and the plot, confirmed as freehold in the agreement, and the plot number so that it can be checked against the areas open to non-UAE buyers.
  10. The floor-by-floor unit schedule and the building permit details, so that the storey count (14, 17 or the A1 breakdown) and the 226 registered units can be matched to a document, and so that the number of residential and retail units is known.
  11. The floor plan for the unit, with the net area, the balcony area and the orientation, since the page’s own plan and brochure links are empty.
  12. What the finish includes: floor coverings, kitchen, wardrobes, sanitary ware and air-conditioning, and whether the unit is handed over furnished or unfurnished.
  13. The service-charge estimate per unit and the name of the management company, and whether district cooling or other utility charges apply.
  14. The number and allocation of parking spaces, whether one is included in the price, and any charge for a further space.
  15. The treatment of VAT, any administration fee the developer charges and any brokerage, each with the amount, since none is printed on the page.
  16. If the unit is an assignment from an earlier buyer: the amount the seller has paid, the amount still owed to the developer, and the developer’s written consent and any transfer fee.
  17. The refund and cancellation terms if the buyer or the developer fails to perform, read against the notice periods and caps in Resolution No. 6 of 2010.
  18. If a mortgage is intended, the name of the bank, its approval in principle and what it requires from a non-resident buyer.

A local lawyer can read the agreement, the Land Department record and the escrow details on the buyer’s behalf. The reservation form is worth reading for the refund terms of the deposit before it is signed.

How Azizi Rose Dubai sits among other Azizi projects and nearby Dubai listings

The developer’s current list includes several other projects in Downtown Jebel Ali, and this site carries a guide for each. The table compares only what can be read the same way for each: the price the developer’s own page prints, per the data files of 13 November 2026, and the starting price shown on A1 Properties’ project pages, re-read on the same date. Handover dates and sizes differ by source and are in each project’s own guide.

Azizi Rose balcony and lounge view over the street, render
Project in Downtown Jebel Ali Developer page price, data pass 13 Nov 2026 A1 “starting from”, 13 Nov 2026 Unit types seen on portals
Azizi Rose (this page) Not printed AED 607,000 Studio, 1 bedroom
Azizi Gabriel Dubai Not printed AED 564,000 Studio, 1 and 2 bedroom
Azizi Lina Dubai From AED 572,000 AED 590,000 Studio to 3 bedroom
Azizi Wares Dubai Not printed AED 555,000 Studio, 1 and 2 bedroom
Azizi Abraham Dubai From AED 588,000 Not on A1’s list Studio to 3 bedroom
Azizi Noura Dubai From AED 578,000 AED 550,000 Studio, 1 and 2 bedroom
Azizi Arian Dubai From AED 571,000 Not on A1’s list Studio to 3 bedroom

Seen side by side, Azizi Rose Dubai is one of the projects on which the developer’s own page prints no price, while the developer pages of four of the others print a “from” figure. The table is a list of printed facts and not a ranking. Prices of different unit types, floors and dates are not comparable, and no project is described as better than another. The guide on the Dubai property market and the Dubai city page give the wider market picture.

Listings of other developers elsewhere in Dubai are shown below for context. Each has its own guide on this site, and each figure is the one that guide prints from its own source; the areas are different, and the figures are not like-for-like.

Dubai listing on this site Area Figures from that listing’s guide
Celestia Dubai South DAMAC project data: 539 to 733 sq ft, AED 695,000 to 988,000, studio to two-bedroom
Windsor House II Dubai South Property Finder: one-bedroom of 779 sq ft from AED 1.2 million; handover Q3 2029 per Property Finder
Terra Woods at Expo Living Expo Living One-bedroom from 742 sq ft, from AED 1,599,888
UH by Ellington JLT Jumeirah Lake Towers Listing header: starting from USD 440,000

The developer’s page lists Jumeirah Lake Towers and Expo City among the places within a 12 and 15 minute drive of the project, which is why these two areas are among the nearby listings. The UAE country page lists the other projects on this site, and the Dubai developers directory lists the developer profiles.

Azizi Developments (developer)

This section uses only what the developer’s own pages and press releases state, read in the data pass of 13 November 2026. The legacy page says that the company was established in 2007 and is headquartered in Dubai, and the chairman’s message on the same site describes 2007 as the year of its venture into real estate. The press materials name Mirwais Azizi as Founder and Chairman of Azizi Group and Farhad Azizi as Group CEO (Azizi press release of 16 October 2026, KONE announcement).

In a press release of 15 September 2026, the developer’s delivery announcement, Azizi states that more than 45,000 homes have been delivered to buyers of over 100 nationalities since its founding, that more than 150,000 units are under construction at various stages, that seven projects were handed over in 2026 to that date and that it aims for ten more by December 2026. These are portfolio-wide figures and are not specific to this project.

The timeline on the developer’s site lists the 2009 agreement with the master developer Nakheel for the Al Furjan community, handovers in Al Furjan in 2016 and in 2020, including Aura in Downtown Jebel Ali in 2020, and the launch of Azizi Riviera in 2017. The communities the developer names include Azizi Riviera, Azizi Venice, Azizi Milan, Al Furjan, Palm Jumeirah, Dubai Healthcare City, Dubai South, Studio City, Sports City, Downtown Jebel Ali and Dubai Islands.

Its press releases also describe in-house manufacturing of aluminium and facade elements, steel, ducting and marble, and a construction partner named Gardinia. No architect, contractor or escrow bank for this project is named on the project page. No certificate or register extract was reviewed for this guide, and the company’s statements are recorded as the company’s statements.

Frequently asked questions

Where is Azizi Rose Dubai and which community is it in?

The developer places the project in Downtown Jebel Ali, within the community it labels Jebel Ali, along Sheikh Zayed Road according to A1, Bayut and FAM. The Land Department record quoted by A1 and Dubizzle names the zone Jabal Ali Industrial Second. The page prints the project’s map point as 24.972673 north, 55.090108 east, and no street address or plot number.

What does a unit cost?

The developer’s page prints no price. Bayut and A1 print a launch or starting price of AED 607,000, about USD 165,283 at 3.6725, and Bayut shows studio listings from AED 624,000 to AED 695,000 and a one-bedroom from AED 924,000 (data pass). A Dubizzle one-bedroom listing asks AED 1,297,000. All are portal indications dated 13 November 2026, and none is an offer.

When is Azizi Rose Dubai due for handover?

The developer prints no handover date for the project. FAM prints 31 May 2028, A1, Bayut and the Dubizzle listing print Q3 2028, and the Dubizzle project section prints July 2028. The date that binds the developer is the one in the sale and purchase agreement, so the buyer asks for it in writing.

Which unit types are offered?

The developer’s type label is Studio and 1 Bedroom. Portals list studios of 338 to 438 sq ft and one one-bedroom of 838 sq ft. No source read prints a two-bedroom unit, a count for each type or a plan.

Is the project freehold?

The developer’s page describes the offer as freehold and the Dubizzle listing prints Freehold as the ownership. The plot number is not printed, so a buyer cannot match it to the areas listed in Regulation No. 3 of 2006 from public text alone. The tenure should be confirmed in the agreement and, after registration, on the title.

What payment plan does Azizi Rose Dubai have?

A1 and Bayut print 10 percent down, 40 percent during construction and 50 percent on handover, and Dubizzle prints 50/50. On AED 607,000 that is AED 60,700, AED 242,800 and AED 303,500, calculated. The dates of the 40 percent instalments are not printed in any source read.

How many floors and units does the building have?

The sources differ. A1 prints 226 registered units and a breakdown of four basements, ground, three podium levels, eight upper floors and roof. Dubizzle’s Land Department record prints 17 floors, and Bayut prints a 14-storey building. The developer prints neither a unit nor a floor count.

What Dubai fees apply to a purchase like this?

The Land Department’s fee table sets registration of a sale contract at 4 percent of its value, shown on its service page as 2 percent for the seller and 2 percent for the purchaser plus AED 20 in other fees. On AED 607,000 the total is AED 24,280, calculated. Who pays what is a matter for the contract, and service charges are separate.

Does buying a unit give a Golden visa?

This guide does not claim it does. The UAE government portal prints a minimum capital of AED 2 million for the real estate route, and each single-unit price on the portals read is below that figure. The authority decides eligibility, and the guide on this site describes the route at greater length.

How can a buyer check the project and its escrow account?

The Land Department’s Project Status Enquiry, also in the Dubai REST application, shows the project number, the registered units, the completion, the management company and the escrow bank name. The buyer compares them with the sales material and asks that every payment go into the named escrow account.

Sources and last check

Last checked: 13 November 2026. Sources:

This is not legal, tax or financial advice.

  • City Dubai
  • Country UAE

Features

  • Gym
  • Swimming Pool

Contact Information

Zhamal Abdykozhoeva
  • Zhamal Abdykozhoeva

Enquire About This Property

Property Inquiry

"*" indicates required fields

Name*
Please let us know what's on your mind. Have a question for us? Ask away.

Compare listings

Compare
Zhamal Abdykozhoeva
  • Zhamal Abdykozhoeva
Oman flag
HEADQUARTERS MUSCAT