Off Plan Property in Batumi: How Buying Works in Georgia (2026)
Off plan property in Batumi is sold before the building is finished, so the buyer’s paper rights come first and the registered title comes later. In Georgia that sequence is handled by the Civil Code, the Law on Public Registry and the Code on Spatial Planning, Architectural and Construction Activities: a written contract, an optional pre-registration or a registered obligation on the land, a construction permit, commissioning of the finished building and, finally, registration of the unit as a separate object. This guide describes the rules and the official checks as they stand on 27 October 2026, using the National Bank of Georgia (NBG) official rate valid that day: USD 1 = GEL 2.5966 and EUR 1 = GEL 2.9082.
Readers weighing off plan property in Batumi will find here what the statutes say about each stage, which registry services cost what in lari and dollars, how to read a construction permit and a registry extract, how payment schedules and apart-hotel rental pools are structured, and what the delivery stage involves. The listing examples come from our own Batumi listing pages and are quoted as those pages state them; every price, size and date can change, and none of the figures is a forecast or a promise of return.
Off Plan Property in Batumi: Key Facts at a Glance
| Question | Position on 27 October 2026 | Basis |
|---|---|---|
| How does a buyer acquire real estate? | The transaction is made in writing and the acquirer’s ownership right is registered in the Public Registry | Civil Code, Article 183 |
| Can a preliminary contract be used? | Yes; a contract may create an obligation to conclude a future contract, and the form required for the contract applies to the preliminary contract too | Civil Code, Article 327(3) |
| Can a buyer’s right be protected before completion? | A right may be pre-registered on the basis of the parties’ agreement, which blocks registration of other rights on the property unless the parties agree otherwise | Law on Public Registry, Article 12 |
| Can an obligation to transfer a future unit be recorded? | For a building under construction that is not yet registered on the land, an obligation to transfer a unit in the future can be registered on the land once the conditions for using the land for construction have been issued | Law on Public Registry, Article 156(10) |
| When is the unit sold as a separate object? | A unit can be sold as a separate object only after its ownership has been registered | Law on Public Registry, Article 156(5) |
| Who issues the permit? | The executive body of the municipality, or a public-law entity it establishes, for buildings of Classes I to IV | Construction Code, Articles 97 and 100 |
| Standard registry fee | GEL 150 in 4 working days (about $57.77), GEL 270 in 1 working day, GEL 350 on the day of filing | National Agency of Public Registry (NAPR) fee schedule |
| Transfer tax | None; VAT of 18% applies to supplies by VAT-registered sellers | PwC Worldwide Tax Summaries, reviewed 2 September 2026; Chambers Real Estate 2026 |
| Foreign buyers | Foreign individuals and foreign-owned entities may acquire residential property, including off-plan units, with no residency requirement; agricultural land is restricted | Chambers Real Estate 2026, Georgia, section 2.11 |
What Off-Plan Means Under Georgian Law
Georgian statutes do not use a single defined term for a sale made before completion. The relevant rules sit in three places. The Civil Code governs the contract: under Article 183, a buyer acquires an immovable thing by a written transaction followed by registration of the acquirer’s ownership right in the Public Registry. The Law on Public Registry governs what can be recorded and in what order. The Construction Code governs when a building may be built, supervised and put into use. A purchase of off plan property in Batumi therefore moves through all three, and the legal position of the buyer changes at each step.
The Chambers Real Estate 2026 guide for Georgia states the consequence plainly: registration, not execution of the sale agreement, is the constitutive act, so title passes only when the National Agency of Public Registry (NAPR) registers it. Before that moment the buyer holds contractual rights against the developer, not ownership of the unit. Article 312 of the Civil Code adds that the contents of the Public Registry are presumed accurate until proved incorrect, and that an entry in the transferor’s name is treated as accurate in favour of an acquirer unless a complaint has been filed against the entry or the acquirer knows the entry is wrong. For a buyer this makes the registry extract the reference document for any statement about who owns the land, whether a mortgage exists and whether any other right has been recorded.
A preliminary contract is a recognised tool. Article 327(3) of the Civil Code says a contract may give rise to the obligation to conclude a future contract and that the form stipulated for the contract applies to the preliminary contract as well. The legal-information site legal.ge describes the same structure for new buildings: the purchase is, legally, an obligation to acquire future property, and the buyer’s protection against a second sale of the same unit comes from preliminary registration of the right in the Public Registry. That is a description by a legal-services publisher rather than a statute, but it matches Article 12 of the Law on Public Registry, discussed below.
Three questions the contract has to answer
First, what exactly is being bought: a unit identified by floor, area and position in an approved project, or a share in a land plot with a right to a future unit. Second, when and on what condition title is transferred, which in practice means after the building is commissioned and the unit is registered as a separate object. Third, what happens on delay, change of specification or non-completion. Article 487 of the Civil Code requires the seller to transfer the thing free of material and legal defects, and Article 488 treats a thing as free of material defects if it has the agreed quality, which is why the specification annex to the contract matters as much as the price.
The Batumi Market Behind Off-Plan Sales
Batumi’s apartment market is large enough that off-plan sales are a normal part of it. According to Galt & Taggart’s Batumi Residential Real Estate 2025 Review and 2026 Outlook, as reported by Investor.ge on 20 April 2026, 17,478 apartments were sold in 2025, up 15% on the previous year, in a market worth about $1.3 billion, up nearly 24%. The average turnkey price was $1,569 per m² in 2023, $1,699 in 2024 and $1,865 in 2025. The same report puts unsold inventory in surveyed developer projects at about 12,400 units at the end of 2025, up nearly 14%, and says foreign buyers made 52% of apartment sales, with Israeli buyers at 13%. Our separate guide to Batumi apartment prices per square metre compares these averages with the entry prices on our listing pages.
A simple ratio gives a sense of scale. Dividing the 12,400 unsold units by the 17,478 apartments sold in 2025 gives 0.71, or roughly 8.5 months of sales at the 2025 pace. This is an illustration built from two published figures, not a Galt & Taggart statistic: the inventory figure covers surveyed developer projects, while the sales figure covers apartment sales in the whole market, so the two are not strictly like-for-like.
The official statistics office, Geostat, publishes declared data on construction permits and completed objects by region. The table below shows Adjara Autonomous Republic, which contains Batumi together with other municipalities. The data cover all building types, not only apartments, and permits granted in a year are not the same buildings as those completed in that year, so the two columns should be read as separate series.
| Period | Permits granted (number) | Permitted space (m²) | Completed objects (number) | Completed space (m²) |
|---|---|---|---|---|
| 2022 | 651 | 701,689 | 58 | 214,198 |
| 2023 | 712 | 752,222 | 78 | 156,822 |
| 2024 | 823 | 1,615,294 | 93 | 146,241 |
| 2025 | 800 | 1,919,970 | 119 | 385,801 |
| January-June 2026 | 412 | 956,492 | 50 | 368,970 |
Source: Geostat, permissions granted for construction and completed construction objects by regions (declared data), files last updated 30 July 2026. The arithmetic is straightforward. The number of permits was 2.8% lower in 2025 than in 2024 (800 against 823), while permitted space was 18.9% higher (1,919,970 m² against 1,615,294 m²). Average permitted space per permit rose from about 1,078 m² in 2022 (701,689 divided by 651) to about 2,400 m² in 2025 (1,919,970 divided by 800). Across 2023 to 2025 the permits covered 4,287,486 m² and the completed objects 688,864 m². Because buildings take years to finish and the series count different things, that gap describes the size of the construction pipeline in the data, not a rate of delivery for any project.
Geostat’s Residential Property Price Index for the third quarter of 2026, published on 23 October 2026, covers new residential property in Tbilisi only: it rose 1.5% on the previous quarter and 5.9% on the same quarter of 2025, with flats up 1.2% and 5.6% respectively. It is mentioned here because it is the official new-build index and does not describe Batumi; Tbilisi prices are covered in our guide to Tbilisi real estate prices.
How Buying Off Plan Property in Batumi Is Documented, Step by Step
The sequence below follows the statutes. It describes what each step is and which official document it produces; it does not point to a particular route, and developers’ own sales procedures may add steps. The general purchase sequence for a completed home is explained in our guide on how to buy property in Georgia.
- Identify the project and the land. The land plot has a cadastral code and an entry in the Real Estate Registry of NAPR. The extract shows the registered owner, any mortgage and any recorded restriction (Law on Public Registry, Article 10(1)).
- Check the permit stage. A construction permit is issued in two stages: approval of the terms of use of the land parcel for construction, then the permit itself (Construction Code, Article 101). The terms are valid for three years before stage II starts (Article 105).
- Sign the preliminary or sale contract in writing. The transaction or the signatures must be authenticated according to the procedure laid down by law, but if the parties sign in the registration authority in the presence of an authorised person no separate authentication is needed (Civil Code, Article 311¹).
- Record the buyer’s right. Depending on the contract, the right can be pre-registered (Law on Public Registry, Article 12) or the obligation to transfer a future unit can be registered on the land (Article 156(10)).
- Pay according to the schedule in the contract. The schedule is set by the contract and is covered in a later section.
- Follow construction and commissioning. The municipality exercises public supervision, accredited inspection bodies or certified experts exercise technical supervision, and the building is recognised as suitable for commissioning before it is used (Construction Code, Articles 117 to 120 and 139).
- Register the unit. On completion, registration of the building rests on the commissioning document; the unit can be sold as a separate object only once its ownership is registered (Law on Public Registry, Article 156(1) and (5)).
- Receive the extract. The buyer’s right is established by a registry extract (Law on Public Registry, Article 10(4)).
Who signs and where is a practical detail. The Chambers guide notes that sale agreements are typically notarised or signed at a Public Service Hall before the registration application is lodged, and that standard registration takes four working days. Under Article 479 of the Civil Code the seller bears the costs of executing the sale contract and registering it unless the contract provides otherwise, so the allocation of those costs is a contract term and not a legal default for the buyer.
Pre-Registration and Registered Obligations in the Public Registry
The Law on Public Registry offers two mechanisms that matter before a building is finished. Both are described in the consolidated English text on the Legislative Herald (matsne.gov.ge), which at the time of reading showed amendments up to Law No. 1453 of 1 April 2026.
Pre-registration under Article 12
Article 12 allows a right to immovable property to be pre-registered in the Registry of Immovable Property Rights on the basis of an agreement signed by the parties, to preserve its later registration. While the pre-registration stands, no other right to the property, and no abandonment of the ownership right, can be registered unless the parties agree otherwise. It does not block the registration of a legal successor as the new owner. It ends when the protected right is registered, when a set deadline expires, when the parties agree in writing to cancel it, or when another person’s right is registered, subject to the exceptions in the article. The text says agricultural land follows separate rules.
The ranking of applications is set by Article 13: where mutually exclusive rights are requested for one object, the one submitted earlier is registered, and the priority of registered rights generally follows the time the application was submitted. This is the statutory basis for the point made by legal.ge that early registration blocks later transactions on the same property.
Obligations on the land under Article 156
Article 156 deals with ownership of buildings, structures and units, including those under construction. Ownership of a building under construction is registered on the basis of the title document and the required construction documentation; after completion, registration requires a document recognising the building as usable or commissioned. If the construction documents or the commissioning document are missing, ownership cannot be registered, and if the applicant owns the land the registry issues an information card for the structure actually standing on it instead. Paragraph 9 makes obligations arising from a contract registrable if they restrict the owner’s freedom to hold, dispose of or use the property. Paragraph 10 adds that for a building under construction that is not yet registered on the land, an obligation on the land for the future transfer of a unit to be built can be registered, provided the conditions for using the land for construction have been issued. Paragraph 11 excludes units of an existing building for which an information card has been issued.
When the building is divided into units, Article 156(6) records co-ownership of the units on the land, with each unit’s share of the land proportional to its floor area in the total floor area of the building. This is the mechanism that gives an apartment owner a defined share of the land and the common parts.
What the registry services cost
NAPR publishes a fee schedule with a term and a fee for each service. The table converts the lari fees to dollars at the NBG rate of GEL 2.5966 per dollar valid on 27 October 2026.
| Service | Term and fee (GEL) | Approximate USD |
|---|---|---|
| Registration of the origin, change or termination of a right to immovable property | 4 working days: 150; 1 working day: 270; same day: 350 | 57.77; 103.98; 134.79 |
| Registration of an obligation related to an immovable property ownership right | 4 working days: 150; 1 working day: 270; same day: 350 | 57.77; 103.98; 134.79 |
| Extract from NAPR (counter request) | 1 working day: 20; same day: 75 | 7.70; 28.88 |
| Extract requested electronically | 1 working day: 13; same day: 52 | 5.01; 20.03 |
| Confirmation of the parties’ signatures on a transaction submitted for registration | Immediately: 7 | 2.70 |
Source: NAPR, Fees and Terms, Immovable Property Registration. To see the proportion, take a $65,000 unit: the standard 4-working-day fee of GEL 150 is about $57.77, which is 0.089% of the price (57.77 divided by 65,000).
Checking the Project: Land Title, Permit and Site Notice Board
A buyer of off plan property in Batumi can verify most of a project’s legal footing from public documents. The Construction Code, in the consolidated English text on matsne.gov.ge (latest consolidated publication 25 June 2026), sets out how a permit is obtained and what is public about it.
Building classes and who issues the permit
Article 96 divides buildings into five classes by risk: Class I minor, Class II low, Class III medium, Class IV high and Class V increased technical risk. Article 97 defines the permit applicant and holder for Classes I to IV, and Article 100 says the administrative authority that issues a building-notice agreement or a construction permit is the executive body of the municipality or a public-law entity it establishes. For a multi-storey residential or hotel block, the class depends on the functional designation and parameters in the government ordinance referred to in Article 96(6), so the class stated in the permit is the figure to read, not an assumption.
The two permit stages
Stage I is the approval of the terms of use of a land parcel for construction; stage II is the construction permit. Each stage is an independent administrative procedure (Article 101). The stage I approval is valid for three years before stage II must begin (Article 105). The application for the permit has to include, among other documents, information on ownership of the land, the stage I act or the detailed development plan, a prefeasibility survey, a detailed architectural design, a construction organisation plan, an engineering-geological survey, a structural scheme, expert opinions where required, proof that the permit fee was paid and photographs of the notice board (Article 106). The authority decides within 20 working days, or within 5 working days in a three-stage procedure (Article 107).
The notice board
Article 110 requires a notice board at the public boundary zone of the construction site three calendar days before the administrative proceedings begin, and an additional board with landscaping information within 10 days of the permit being issued. Article 134 provides fines for failing to place the board or for incomplete information, set at GEL 2,000 in Tbilisi and in specified protected zones and lower amounts elsewhere. In practice the board is the first public pointer to the permit number, the holder and the project parameters, which can then be compared with the sales brochure and the contract.
What the registry shows about the land
The extract is built from the Registry of Immovable Property Rights, the Registry of Public-law Restrictions and the Registry of Tax Liens and Mortgages (Law on Public Registry, Article 10(1)). The Civil Code, in Article 635, gives a contractor who builds a structure a lien on the building lot for claims arising from the contract; the Chambers guide notes that this right takes effect only on registration. A mortgage or lien that is registered passes with the property, which is why legal.ge describes studying the extract as essential before any payment.
Payment Schedules for Off Plan Property in Batumi
The payment schedule is a contract term. The Chambers guide describes developer equity combined with buyer payments as the main model for new-build housing in Tbilisi and Batumi, with bank construction finance supplementing it. Developers market this in different ways: an initial deposit followed by monthly or quarterly instalments, payments tied to construction stages, or a balance due at handover. In each case the terms are whatever the contract says.
What the contract can contain to support the buyer is a separate question. legal.ge lists, among the points to verify before buying, whether the developer holds a bank guarantee or insurance for completion and notes that recovering funds can be complex without one. The contract can also link instalments to measurable stages and say what happens to payments if a stage is late. The following worked example uses assumed terms and is an illustration of arithmetic only, not a published plan from any developer.
| Step | Assumption or calculation | Result |
|---|---|---|
| Price | Assumed entry price (the figure shown on our Delux Horizon listing page) | $65,000 |
| Down payment | Assumed 30% (0.30 × 65,000) | $19,500 |
| Balance | 70% of the price (0.70 × 65,000) | $45,500 |
| Instalments | Assumed 30 equal monthly payments (45,500 ÷ 30) | $1,516.67 each |
| Lari equivalent of each instalment | 1,516.67 × 2.5966 (NBG rate, 27 October 2026) | about GEL 3,938 |
| VAT if the quoted price excluded it | 18% of 65,000 | $11,700, total $76,700 |
Two points follow from the arithmetic. First, if the schedule is in dollars but the buyer’s income is in another currency, each instalment moves with the exchange rate, so the contract’s currency clause decides who carries that movement. Second, the last row shows why the contract must state whether the price includes VAT: the Chambers guide says VAT at 18% applies where the seller is VAT-registered and selling in the course of business, and that a developer becomes a VAT payer once taxable supplies exceed GEL 100,000 in any rolling 12-month period. Whether VAT applies to a particular sale depends on the seller’s status, so the figure is shown only to illustrate the rate.
Costs and Taxes on a Purchase
Georgia levies no transfer tax on property. PwC’s Worldwide Tax Summaries (last reviewed 2 September 2026) states that there are no transfer taxes in Georgia, and the Chambers guide says the buyer’s costs are limited to the registry fee and notarial fees. The registry fee schedule is in the table above. VAT is the main cost that varies by seller, as described in the previous section.
After the purchase, annual taxes and rental income taxation apply; they are covered in our guide to property tax in Georgia, which states them as of its own date. The rental side for short stays is the subject of our Batumi short-term rental guide. A purchase financed by a bank is covered in our guide to mortgages for foreigners in Georgia, because bank rules on unfinished buildings differ from rules on completed ones.
Service charges for apart-hotels and residential complexes are set by the managing company or the owners’ association and are not set by statute. The charge is therefore a contract and management-agreement item; the figure and the basis (per m² or per unit) appear in the documents the developer supplies.
Apart-Hotel Units: Title, Operator and Rental Pool
Many off-plan apartments in Batumi are sold as part of a hotel or apart-hotel project. The legal structure has two layers. The first is ownership of the unit: under Article 156(4) of the Law on Public Registry a building may be one object of right or several units, and under Article 156(6) each unit carries a share of the land proportional to its floor area. The second is the operating arrangement: the owner signs a separate management or rental-pool contract with a hotel operator or with the developer’s operating company. The title and the operating contract are different documents, and the second does not change who is registered as the owner.
Franchised and operator-branded projects add a third relationship. Per our listing page for Wyndham Grand Residences Batumi Gonio Aqua, Wyndham is a franchisor and a local developer builds and sells the apartments. Per our listing page for Mardi Aquapark, the project is operated under Accor’s Mercure brand, each apartment joins a rental pool under a 10-year management contract and the revenue is split 60% to the owner and 40% to Accor, which covers operating expenses; the page adds that the developer states that returns are not assured and that the signed contract governs. Per our listing page for Novotel Living, the developer’s project page describes a mandatory rental pool with the owner receiving 60% of gross rental revenue and a 40% management fee covering hotel operation, with rooms owned individually under strata title as described in an Accor announcement of 5 June 2023.
The arithmetic of a 60/40 split is simple: for every $1,000 of gross revenue in the pool, $600 is the owner’s share and $400 is the operator’s. What that share is calculated on (gross revenue of the whole pool, revenue of the individual unit, or net after charges), how it is paid and how long the contract runs are contract definitions that vary between projects. The questions that decide the position of an owner are in the contract: whether participation is compulsory, what happens when the owner wants to use the unit personally, whether the contract binds a later buyer and what happens if the operator licence ends. These are matters for the contract documents.
Off Plan Property in Batumi: Examples from Our Listing Pages
The table lists six Batumi projects as their listing pages state them on 27 October 2026. Prices are the entry prices on the pages, converted at the NBG rate of GEL 2.5966 per dollar; the Mardi Aquapark figures are developer prices in euros quoted on the page, converted at GEL 2.9082 per euro. The pages differ in what they state, so the columns show only what each page gives.
| Listing | Entry price per our listing page | In lari (NBG rate) | Sizes and status stated on the page |
|---|---|---|---|
| Mardi Aquapark | Developer prices quoted: studio from €72,000, one-bedroom from €128,100 | about GEL 209,390 and GEL 372,540 | Studio from 28 m², one-bedroom from 49 m²; under construction, developer completion target Q4 2028; hotel operated by Accor under the Mercure brand |
| Novotel Living | Price on request | not applicable | 28.1 to 79.4 m²; developer Mardi Holding; Novotel Living brand by Accor; mandatory rental pool described as 60/40 |
| Delux Horizon | From $65,000 | about GEL 168,779 | About 28 to 57 m², studios and one-bedrooms; developer Horizons Group; delivery described as turnkey and furnished |
| Horizon Grand Residence | From $55,000 | about GEL 142,813 | 52 m² unit listed |
| Wyndham Grand Residences Gonio Aqua | From $134,566 | about GEL 349,414 | From 31.2 m²; Wyndham-branded, with Wyndham as franchisor and a local developer building and selling |
| Mardi Hills | From $45,276 | about GEL 117,564 | 26.95 to 112.21 m²; page describes a completed building by Mardi Holding with most units delivered fully finished |
The comparison shows the range of situations covered by the label. Mardi Aquapark is described by the developer as under construction with a target date, so it is a clear off-plan case. Mardi Hills is described as completed, so the questions are the finish and the registry extract of the actual unit, not construction risk. For the others, the completion position is a matter for the developer’s documents, which is why the permit and commissioning checks in this guide matter. A purchase price converted at today’s rate is also only a snapshot: the lari value moves with the NBG rate, and the dollar price is what the pages publish.
The same questions apply across these projects. Which block and floor is the unit, and which registered land plot does the block stand on? Is the stated completion date a contract date or a marketing date? Is the listed price for the smallest unit only? Our Georgia country page and the Batumi city page list the current projects, and the Mardi Aquapark and Novotel Living pages carry the operator descriptions quoted above.
Supervision, Commissioning and Delivery Inspection
The Construction Code distinguishes three kinds of supervision (Article 117): public supervision by the municipality, technical supervision by an accredited inspection authority or certified expert, and construction-safety supervision by a duly qualified person. Public supervision covers compliance with the permit terms, construction-safety terms and commissioning, and municipalities supervise a share of Class III and IV buildings each year (Article 118). Technical supervision produces an opinion when a stage of construction is completed; the municipality may check the stage documents within 15 working days after a positive opinion, and a stage is deemed delivered if that period passes without a finding (Article 120). At the last stage, completion and putting the building into exploitation can be done on a single application within 10 working days of the permit holder’s request, unless the legislation provides otherwise.
Commissioning
Article 139 provides that a Class I building is not subject to recognition as suitable for commissioning and that the rules for Classes II to IV are set by a government legal act. Article 139¹ states that a building must not be operated until the commissioning act is issued, and that electricity and natural gas must not be supplied to a non-commissioned building, other than for construction activities during the permit’s validity. The practical result for a buyer is that the commissioning act is the document that links the completed building to legal use, and it is also the document on which registration of the finished building rests under Article 156(1) of the Law on Public Registry.
The Code also contains a temporary rule for Batumi (Article 141⁷) that lets the supervising body commission a completed project in the Batumi municipality built in breach of permit conditions or without a permit within an approved plan area, applying to projects completed as of 26 September 2022. It is a rule about older buildings, which is why the date of completion appears in the documents a buyer of a resale unit may be asked to read; for a building that is still to be built the ordinary permit and commissioning route applies.
Reading the delivery stage
Delivery is a contract event as well as a regulatory one. The contract’s specification governs what quality is agreed, and Article 488 of the Civil Code treats a thing as free of material defects if it has the agreed quality; if no quality is agreed, the test is suitability for the contracted or customary use. Article 489 treats any non-existent right registered in the Public Registry as a legal defect. For defects in work, Article 655 provides that the client may assert claims for defects in performance within one year, and claims concerning structures within five years after acceptance of the work. That provision sits in the chapter on contracts for work, so how it applies to a particular purchase depends on how the contract is classified. A delivery inspection normally compares the unit with the specification annex: area, finishes, installed equipment, utilities and common parts, with a written snag list and dates for correction.
Residence Permit Timing and Off-Plan Purchases
Property can be the basis for a Georgian residence permit, and the timing of title matters for off-plan buyers. The Public Service Development Agency (PSDA) lists a short-term residence permit for property owners: the property must have a market value of USD 150,000 equivalent in GEL or more, agricultural land is excluded, the valuation is made by a certified assessor accredited by the LEPL Unified National Body of Accreditation, and the title document is among the required papers. The state fees on the PSDA page are GEL 300 for processing in 30 calendar days, GEL 450 for 20 days and GEL 600 for 10 days. A separate investment permit applies at USD 300,000. Our guide to the residence permit in Georgia states the conditions in more detail, including that the threshold applies from 1 March 2026, that it is measured on an appraiser’s valuation and not on the invoice, and that several properties can be combined.
At the NBG rate of 27 October 2026, USD 150,000 is GEL 389,490. At the entry prices on our listing pages the number of units needed to reach the threshold, if each unit were valued at its entry price, is 3 for Horizon Grand Residence ($55,000), 3 for Delux Horizon ($65,000), 4 for Mardi Hills ($45,276) and 2 for Wyndham Grand Residences Gonio Aqua ($134,566). Appraisals can differ from prices. The relevance to off-plan is a question of documents: the PSDA asks for the title document and an appraisal of the property, while under the Law on Public Registry the finished building is registered on the commissioning document and a unit becomes a separate object of sale only once registered. A purchase does not itself grant a permit or any citizenship; the permit is a separate administrative decision. The wider picture of living and residence rules is in our guide to living in Georgia as a foreigner, and the reasons foreigners can buy at all are set out in our guide on whether foreigners can buy property in Georgia.
Off-Plan Due Diligence Checklist
The checklist collects the documents and statutory references from the sections above. It describes checks that the rules make possible; it is not an assessment of any developer or project.
| Check | Document or place | What it shows | Rule |
|---|---|---|---|
| Land ownership and encumbrances | NAPR extract (counter GEL 20 or online GEL 13 in 1 working day) | Registered owner, mortgages, liens, public-law restrictions | Law on Public Registry, Art. 10(1); Civil Code, Art. 312 |
| Conditions for using the land for construction | Stage I act of the municipality | That the land is approved for the planned building; valid 3 years before stage II | Construction Code, Arts. 101 and 105 |
| Construction permit | Permit issued by the municipality; site notice board | Holder, class, parameters, permit number | Construction Code, Arts. 100, 106, 107 and 110 |
| Buyer’s right recorded | Pre-registration or registered obligation on the land | Blocks other rights on the property; ranks by application time | Law on Public Registry, Arts. 12, 13 and 156(10) |
| Contract form | Written contract, authenticated or signed at the registration authority | Valid form for the sale and for any preliminary contract | Civil Code, Arts. 183, 311¹ and 327(3) |
| Specification and quality | Annex to the contract | Agreed area, finishes and equipment | Civil Code, Arts. 487 and 488 |
| Payment terms | Contract schedule; bank guarantee or insurance if offered | Amounts, dates, currency, VAT inclusion, consequences of delay | Contract terms; Chambers Real Estate 2026; legal.ge |
| Operator and rental pool | Management or rental-pool contract | Split, term, compulsory participation, owner use, service charge basis | Contract terms; listing pages |
| Commissioning | Commissioning act | Building recognised as suitable for use; utilities may be connected | Construction Code, Arts. 139 and 139¹ |
| Unit registered as a separate object | Registry extract for the unit | Buyer’s name, area, land share | Law on Public Registry, Arts. 10(4) and 156(1), (5), (6) |
The NAPR services catalogue describes services for registration of rights on property under construction, preliminary registration, extracts and the related fees and terms, and the agency’s page lists the document requirements for each. Reading that catalogue before an appointment shows which documents the registrar will ask for.
The other batch articles in this series cover neighbouring topics: the overall picture is in our guide to the Georgia real estate market, the coast beyond Batumi is in our Black Sea coast guide, and buying without travelling is covered in our guide to buying property in Georgia from abroad. Legal drafting points for contracts are listed in our legal tips article, and the value comparison with other markets is in our comparison of what $100,000 buys.
Frequently Asked Questions
What is off plan property in Batumi?
Off plan property in Batumi is an apartment or house sold before the building has been completed and commissioned. The buyer signs a written contract and pays under a schedule, and the unit is registered in the buyer’s name only after the building is commissioned and the unit is registered as a separate object (Law on Public Registry, Article 156).
When does the buyer become the owner?
For off plan property in Batumi, as elsewhere in Georgia, the buyer becomes the owner when NAPR registers the ownership right. Civil Code Article 183 requires a written transaction and registration of the acquirer’s ownership right in the Public Registry, and the Chambers guide describes registration as the constitutive act. Before then the buyer holds contractual rights, which can be pre-registered under Article 12 of the Law on Public Registry.
Can a foreigner buy off plan property in Batumi?
Yes for residential property. The Chambers Real Estate 2026 guide says foreign individuals and foreign-owned entities may acquire residential and commercial property, including apartments and off-plan units, with no residency or reciprocity requirement; agricultural land is restricted. A residence permit is not a condition of purchase.
What does registering the buyer’s right cost?
For off plan property in Batumi the NAPR fee for registering a right or an obligation is GEL 150 in 4 working days (about $57.77 at the NBG rate of 27 October 2026), GEL 270 in one working day or GEL 350 on the day of filing. An online extract costs GEL 13 in one working day or GEL 52 on the same day. The contract decides who pays; Civil Code Article 479 puts the registration costs on the seller unless the contract says otherwise.
Is there a transfer tax on off plan property in Batumi?
No transfer tax applies to off plan property in Batumi, according to PwC’s Worldwide Tax Summaries reviewed on 2 September 2026. VAT at 18% applies to supplies by VAT-registered sellers, and the Chambers guide says a developer becomes a VAT payer once taxable supplies exceed GEL 100,000 in a rolling 12-month period. The contract should state whether the price includes VAT.
How can a buyer check a project’s construction permit?
For off plan property in Batumi, the check runs through the permit documents and the site notice board. Construction Code Article 110 requires a notice board at the site boundary, and Article 106 lists the documents behind a permit application. The land’s registered owner and encumbrances are read from a NAPR extract. The municipality’s executive body issues the permit under Article 100.
What is the difference between the title to a unit and the hotel rental contract?
The title is the registered ownership of the unit and its share of the land (Law on Public Registry, Article 156). The rental or management contract is a separate agreement with the operator. On our Mardi Aquapark listing page the developer describes a 10-year management contract with revenue split 60% to the owner and 40% to Accor, and notes that returns are not assured.
What documents show that a building is finished?
The commissioning act. Construction Code Article 139¹ bars operating a building until it is issued and bars electricity and gas supply to a non-commissioned building except for construction. After commissioning, the building is registered on the commissioning document and the unit can be registered as a separate object.
Does off plan property in Batumi count towards a residence permit?
For off plan property in Batumi the PSDA short-term residence permit for property owners applies to non-agricultural property with a market value of USD 150,000 equivalent in GEL or more, valued by an accredited assessor, and it asks for the title document. The threshold is measured on the appraiser’s valuation, and units can be combined; the PSDA page lists fees of GEL 300, 450 or 600 depending on processing time.
How many months of 2025 sales does Batumi’s unsold inventory represent?
About 8.5 months on a simple division. Galt & Taggart, as reported by Investor.ge on 20 April 2026, gives about 12,400 unsold units in surveyed developer projects and 17,478 apartments sold in 2025; 12,400 divided by 17,478 is 0.71 years. The two figures are not strictly comparable, so the ratio is an illustration.
Last checked: 27 October 2026. Sources: Law of Georgia on Public Registry (Legislative Herald); Civil Code of Georgia (Legislative Herald); Code on Spatial Planning, Architectural and Construction Activities (Legislative Herald); NAPR fees: immovable property registration; NAPR fees and terms; NAPR agency services catalogue; National Bank of Georgia official exchange rates; Public Service Development Agency: residence permits; Geostat: permissions granted for construction and completed objects; Geostat permissions data file; Geostat completed objects data file; Geostat: Residential Property Price Index, Q3 2026; Investor.ge: Sector snapshot, Batumi residential real estate (Galt & Taggart); Chambers Real Estate 2026: Georgia; legal.ge: off-plan property purchase; PwC Worldwide Tax Summaries: Georgia.